Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG a joint venture of 0l ConsteLaidon 0 iEnergy, eDF CALVERT CLIFFS NUCLEAR POWER PLANT June 13, 2013 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Inservice Inspection Report
REFERENCE:
(a) American Society of Mechanical Engineers, Boiler & Pressure Vessel Code,Section XI, Article IWA-6000 Pursuant to Reference (a), please find enclosed the Inservice Inspection Report for the Calvert Cliffs Nuclear Power Plant Unit 2.
There are no regulatory commitments contained in this letter.
Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.
Manager - Engineering Services JJS/PSF/bjd
Enclosure:
(1) 2013 Owner's Activity Report for RFO-19 Inservice Examinations cc: Mr. Robert McGeeney (Without Enclosure)
N. S. Morgan, NRC Resident Inspector, NRC W. M. Dean, NRC S. Gray, DNR SOc-7
ENCLOSURE (1) 2013 OWNER'S ACTIVITY REPORT FOR RFO-19 INSERVICE EXAMINATIONS Calvert Cliffs Nuclear Power Plant, LLC June 13, 2013
Calvert Cliffs Nuclear Power Plant, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657 CENG O0*' cmueom a joint venture of I.4 O-w .. DF Fourth Interval / Second Period Inservice Inspection Program and Second Interval I Second Period Containment IWE/L Program 2013 Owner's Activity Report for RFO-19 Inservice Examinations Commercial Service Date: April 1, 1977 NRC Docket Number: 50-318 Document Number: CCNPP-2-OAR-004-019 Revision Number: 00 Prepared by: ";11.2 oaO 3 AelRey s - ietSPoga Owner Reviewed by: %)oo.gr4a r G.S. N clear Engineering Programs Approved by:
,res J. Stai44 - Ma ager Engineering Services
Calvert Cliffs Nuclear Power Plant Unit I Fourth Interval / First Period Inservice Inspection CCNPP-2-OAR-004-019 Second Interval / Second Period Containment Rev. 00 a joint venture of 2013 Owner's Activity Report Page 2 of 6 O =WhWntkm ','eDF for RFO-19 Inservice Examinations Abstract This Owner's Activity Report (OAR) summarizes the results of the Calvert Cliffs Nuclear Power Plant (CCNPP),
Unit 2, American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code (B&PVC), Section Xl, Inservice Inspection examinations (ISI), performed in Refueling Outage nineteen (RFO-19) during the period from March 13, 2011 through March 25, 2013 of the Second Inservice Inspection Period which began on October 10, 2012 and is scheduled to end on October 9, 2016 and the Second outage of the Fourth Ten-Year Inservice Inspection Interval which began on October 10, 2009 and is scheduled to end on June 30, 2019.
As an alternate to the requirements of the ASME Boiler and Pressure Vessel Code (B&PVC), Section Xl, Article IWA-6000, CCNPP is implementing ASME Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1." Regulatory Guide 1.147, Revision 16 (Oct. 2010),
approved ASME Code Case N-532-4 for use. This report complies with the requirements of ASME Code Case N-532-4.
In accordance with ASME Section XI, IWB-2412(a), IWC-2412(a), IWD-2412(a), and IWE-2412(a), and with the exception of those examinations that are limited to components selected for examination under Examination Categories B-L-2 and B-M-2 and required only when the pump or valve is disassembled as specified in Table IWB-2500-1, IWC-2500-1, IWD-2500-1, IWF-2500-1, and IWE-2500-1, including those examinations which CCNPP has requested and received approval in the form of requests for relief or alternates, the required examinations in each examination category have been completed for the First outage of the Second Inspection Period of the Fourth Inspection Interval in accordance with Tables IWB-2412-1, IWC-2412-1, IWD-2412-1, and IWE-2412-1.
Owner's Activity Reports - Form OAR-1 Owner's Activity Reports, Form OAR-1 were prepared and certified upon completion of the Calvert Cliffs Nuclear Power Plant Unit 2, 2013 Refueling Outage (RFO-19) examination activity in accordance with the following inspection plans:
Fourth Inservice Inspection Program Plan Second Interval Containment Inservice Inspection Program Plan Fourth Interval Inservice Inspection Pressure Testing Program Plan In addition to the Owner's Activity Reports, Form OAR-i, the following Tables are also included:
- a. Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, provides a listing of item(s) with flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).
- b. Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, identifies those items containing flaws or relevant conditions that exceeded the ASME Xl acceptance criteria (IWB-3000, IWC-3000, or IWD-3000) or in the case of supports, IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement, or corrective measure, may not have resulted from an examination or test required by ASME Section Xl, and provides such information as Code Class, whether the item is a repair, replacement, or corrective action, item description, description of work, if the flaw or relevant condition was found during a scheduled ASME Section Xl examination or test, date completed, and the repair replacement plan number.
Calvert Cliffs Nuclear Power Plant Unit I CzE r~\ N (~i G Fourth Interval / First Period Inservice Inspection Rev. 00 Second Interval / Second Period Containment J e1, 01 ajoint venture of 2013 Owner's Activity Report Page 3 of 6 O UMIO- -'geDF for RFO-19 Inservice Examinations FORM OAR-I OWNER'S ACTIVITY REPORT Fourth IntervallSecond Period of Inservice Inspection Program As required by the provisions of the ASME Code Case N-532-4 Report Number CCNPP-2-OAR-004-01 9 Plant Calvert Cliffs Nuclear Power Plant Unit No. 2 Commercial Service April 1, 1977 Refueling Outage RFO-19 Date Number (if applicable)
Current Inspection Interval Fourth Inservice Inspection Interval- October 10, 2009 to June 30, 2019 (1"*,2", 3', 4', other)
Current Inspection Period Second Inservice Inspection Period - October 10, 2012 to October 9, 2016 (15t, 2nd, 3"' )
Edition and Addenda of Section XI applicable to the Inspection Plans 2004 Edition, No addenda Date / Revision of Inspection Plans Rev. 1 Dated Aug. 26, 2012 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used: N-460, N-532-4, N-566-2, N-616, N-624, N-639, N-686-1, N-716, N-722-1, N-729-1, N-753, N-770-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of RFO-1 9 conform to the requirements of Sectio I (refueling outage number)
Signed Date
- 42.43 ea upeor, CCNPP Nuclear Engineering Programs CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Maryland and employed by Hartford Steam Boiler of Hartford, Connecticut (HSBCT) have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repair/
replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection
________ ._ tos__naureCommissions Wý14,-L2 MJiL* t' A.1J.I Jo-shua-ebrsey*,*nspector's Signature) National Board, State, Provinceand Endorsements Date _ 6,_
_ ._L. o
6 Calvert Cliffs Nuclear Power Plant Unit 1 (3 E[NG.~ (j Fourth Interval / First Period Inservice Inspection Second Interval / Second Period Containment Rev. 00 J e 01 a joint venture of 2013 Owner's Activity Report June 12, 2013
-"eDF for Page 4 of 6 0 c-w RFO-19 Inservice Examinations FORM OAR-1 OWNER'S ACTIVITY REPORT Second IntervallSecond Period of Containment IWEIL Inservice Inspection Program As required by the provisions of the ASME Code Case N-532-4 Report Number CCNPP-2-OAR-004-01 9 Plant Calvert Cliffs Nuclear Power Plant Unit No. 2 Commercial Service April 1, 1977 Refueling Outage RFO-19 Date Number (ifapplicable)
Current Inspection Interval Second Inservice Inspection Interval - Septemnber 9, 2009 to September 9, 2018 (1, 23'Q,3o, 4", other)
Current Inspection Period Second Inservice Inspection Period - September 9, 2011 to September 9, 2015 (1 "', 2", 77-Edition and Addenda of Section XI applicable to the Inspection Plans 2004 Edition, No addenda Date / Revision of Inspection Plans Rev. 0 Dated Dec. 28, 2009 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used: N-532-4, N-624, N-686-1, N-739, N-753 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of RFO-19 conform to the requirements of Section XI (refueling outage number)
Signed t&117 't ý_ Date (0.42.43 J
J/Aý n" * ,.
GetV1 Supervisof(CCNPP Nuclear Engineering Programs CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Maryland and employed by Hartford Steam Boiler of Hartford, Connecticut (HSBCT) have inspected the items described in this Owners Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repair/
replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any pe onal injury or property damage or a loss of any kind arising from or connected with this inspection Commissions fvj( 2) b A, o-s-u6ursey ( spector's Signature) National Board, State, Province, and Enddrsements Date
Calvert Cliffs Nuclear Power Plant Unit I Fourth Interval / First Period Inservice Inspection CCNPP-2-OAR-004-019 Second Interval / Second Period Containment June 12, 2013 a joint venture of 2013 Owner's Activity Report Page 5 of 6 Onstmoin e7eF for RFO-19 Inservice Examinations Table I Items with Flaws or Relevant Condition that Require Evaluation for Continued Service As required by the provisions of the ASME Code Case N-532-4 Examination Cateor Item Num Item Description Evaluation Description Category Number IWE Moisture Acceptance by Design Evaluation per IWE-3510.4 (ECP-Barrier 12-000207)
E-C E4.11 MC Liner Acceptance by Design Evaluation per IWE-3510.4 (ESR-13-000303)
F-A F1.20C Component Acceptance by Design Evaluation per IWE-3510.4 Support (ES200300139)
Calvert Cliffs Nuclear Power Plant Unit I Fourth Interval / First Period Inservice Inspection CNPP-2-OAR-004-019 Second Interval / Second Period Containment Je 01 ajoint venture of 2013 Owner's Activity Report Page 6 of 6 O~r- :eD:e for RFO-19 Inservice Examinations Table 2 Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service as required by the provisions of the ASME Code Case N-532-4 Code Date R&R Plan Class Item Description Description of Work Completed Number 2SNUB2-52-53 Replace top worn bracket 4/14/11 2011-2-014 One One 2#3/4"CC9 Replace missing/broken Girard Clamp Stud 3/7/13 2013-2-027 One 3/4"Clamp/2PDT122B Modification of tubing support 4/22/13 2013-2-030 One 3/4"Clamp/2PDT122B Replacement of missing Girard Clamp Bolts 3/20/13 2013-2-038 One 2.5-SR-2008 / 2-RV-201 Valve Replacement of bolting due to thread 4/23/2013 2012-2-050 Bolting damage Two EB-8-2001-A-13-1 Replace / Modify Base Plate Hanger A13-1 2/19/13 2012-2-123 on Line Class EB-8-2001 Two 2#DC1-2002 Repair/Replace base plates on R7 Hanger 3/19/13 2013-2-032 Three 2HXHVACCTCLR21 Restore CAC supports to design 4/5/13 2013-2-022 Three 2HXHVACCTCLR22 Restore CAC supports to design 3/27/13 2013-2-023 Three 2HXHVACCTCLR23 Restore CAC supports to design 3/26/13 2013-2-024 Three 2HXHVACCTCLR24 Restore CAC supports to design 3/26/13 2013-2-025 Three 2PUMPSW21 Repair volute plug on #21 SW Pump 8/6/12 2012-2-095A End of Owner's Activity Report for Refueling Outage 19 (RFO-19)