|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24005A0232024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports, Refueling Outage 25 CC1R25 ML24005A0242024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports, Refueling Outage 23 CC2R23 RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23160A0032023-06-0909 June 2023 Inservice Inspection Report ML21169A0352021-06-18018 June 2021 Inservice Inspection Report ML20363A1562020-12-17017 December 2020 Inservice Inspection Report ML20182A1622020-06-30030 June 2020 Proposed Alternative to Supplemental Position Indication Testing Interval NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 ML19249B9942019-09-0606 September 2019 Submittal of the Update to the Fifth Ten-Year Interval Snubber Inservice Testing Program Plan ML19200A0292019-07-16016 July 2019 Spring 2019 - 180 Day Steam Generator Report ML19169A0602019-06-13013 June 2019 Lnservice Inspection Report NMP2L2700, Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants2019-04-30030 April 2019 Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants ML18354A4312018-12-19019 December 2018 Submittal of Relief Requests Associated with the Fifth Lnservice Inspection (ISI) Interval ML18192B9902018-07-0606 July 2018 Submittal of the Fifth Ten-Year Interval Inservice Testing Program for Safety Related Pumps and Valves ML18169A1492018-06-14014 June 2018 Inservice Inspection Report ML17159A5252017-06-0505 June 2017 Clavert Cliffs, Unit 1 - Inservice Inspection Report ML16243A4792016-08-29029 August 2016 CC1 R23 180-Day Steam Generator Tube Inspection Report ML16159A2982016-06-0606 June 2016 Inservice Inspection Report ML16012A4682016-01-0808 January 2016 Inservice Inspection Reports ML15314A0792015-11-0606 November 2015 Spring 2015 - 180 Day Steam Generator Report ML15239A2922015-08-25025 August 2015 Spring 2015 - 180 Day Steam Generator Report ML15160A3222015-06-0404 June 2015 Inservice Inspection Report, 2015 Owner'S Activity Report for RFO-20 Inservice Examinations ML14170A8922014-06-17017 June 2014 Inservice Inspection Report ML13168A3952013-06-13013 June 2013 Inservice Inspection Report ML12255A3902012-09-0707 September 2012 Inservice Inspection Report ML12178A4442012-06-25025 June 2012 Submittal of Inservice Inspection Report ML12032A2732012-01-31031 January 2012 Inservice Inspection Report Revision 01 (Unit 2) ML11147A0712011-05-25025 May 2011 Inservice Inspection Report, 2011 Owner'S Activity Report for RFO Inservice Examinations ML1017404372010-06-21021 June 2010 Inservice Inspection Report ML0916702682009-06-12012 June 2009 2009 Owner'S Activity Report for RFO-17 Inservice Examinations ML0900200972008-12-29029 December 2008 Submittal of Fourth Ten-Year Interval Inservice Inspection Program Plan and Request for Approval of Alternatives (Relief Requests) to American Society of Mechanical Engineers Code, Section XI ML0816503462008-06-11011 June 2008 Inservice Inspection Report ML0719804932007-07-0202 July 2007 Attachment 2, Pump and Value Inservice Test Program for Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Ten Year Interval ML0719901302007-07-0202 July 2007 Attachment (3), Pump and Value Inservice Test Program Relief Requests for Calvert Cliffs Nuclear Power Plant Units 1 and 2 - Fourth Ten Year Interval ML0719701942007-07-0202 July 2007 Fourth Ten-Year Inservice Test Program for Safety-Related Pumps and Valves ML0718300692007-06-27027 June 2007 Inservice Inspection Report ML0717201712007-06-20020 June 2007 Notification of Extension of the Inservice Test Program Third Ten-Year Interval ML0619800682006-07-10010 July 2006 Inservice Inspection Report ML0517200442005-06-14014 June 2005 Inservice Inspection Report for Calvert Cliffs Nuclear Power Plant Unit 2 ML0506107142005-02-25025 February 2005 2004 Steam Generator Tube Inspection Results Report ML0423304862004-08-0404 August 2004 Inservice Inspection Report ML0320300182003-07-18018 July 2003 Inservice Inspection Report ML0231900892002-11-12012 November 2002 Third Interval Inservice Inspection Program Relief Request No. RR-RI-ISI-2; Risk Informed Inservice Inspection (ISI) Program ML0226302882002-09-17017 September 2002 Inservice Inspection Report ML0215503412002-05-29029 May 2002 Third Interval Inservice Inspection Program Relief, Risk-Informed Inservice Inspection (ISI) Program ML0037360122000-07-25025 July 2000 Inservice Inspection Report 2024-01-05
[Table view] Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01
[Table view] |
Text
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG a joint venture of 0Consteflaton D SEneMrgyD CALVERT CLIFFS NUCLEAR POWER PLANT May 25, 2011 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Inservice Inspection Report
REFERENCE:
(a) American Society of Mechanical Engineers, Boiler & Pressure Vessel Code,Section XI, Article IWA-6000 Pursuant to Reference (a), please find enclosed the Inservice Inspection Report for the Calvert Cliffs Nuclear Power Plant Unit 2. This inspection fulfilled the intentions and requirements stated in our commitment to comply with the American Society of Mechanical Engineers, Boiler & Pressure Vessel Code,Section XI, Inservice Inspection Requirements.
Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.
yours, Manager - Engineering Services JJS/KLG/bjd
Enclosure:
(1) 2011 Owner's Activity Report for RFO Inservice Examinations (Unit 2) cc: Mr. Craig Lowry (Without Enclosure)
D. V. Pickett, NRC Resident Inspector, NRC W. M. Dean, NRC S. Gray, DNR
ENCLOSURE (1) 2011 OWNER'S ACTIVITY REPORT FOR RFO INSERVICE EXAMINATIONS (Unit 2)
Calvert Cliffs Nuclear Power Plant, LLC May 25, 2011
CENG a *nt c v,,'*.he 01 Constellation Energy Nuclear Corporation 1650 Calvert Cliffs Parkway Lusby, MD 20657 Fourth Inservice Inspection Interval First Inservice Inspection Period 2011 Owner's Activity Report for RFO-18 Inservice Examinations Commercial Service Date: April 1, 1977 NRC Docket Number: 50-318 Document Number: CCNPP2-OAR-004-018 Revision Number: 00 Date: April 28, 2011 Prepared by:
Timothy Weck - Site ISl Program Owner Reviewed by: _'4 A A**, /, ajL-Z
- G.S. Nuclear Engineering Programs Approved n e ring Services
Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Inservice Inspection Interval CCNPP2-OAR-004-018 CENG First Inservice Inspection Period Rev. 00 2011 Owner's Activity Report April28,2011 for Page 2 of 6 RFO-18 Inservice Examinations Abstract This Owner's Activity Report (OAR) summarizes the results of the Calvert Cliffs Nuclear Power Plant (CCNPP), Unit 2, American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code (D&PVC),Section XI, Inservice Inspection examinations (ISI), performed in Refueling Outage eighteen (RFO-18) during the period from October 10, 2009 through March 13, 2011, the First Inservice Inspection Period which began on October 10, 2009 and is scheduled to end on June 30, 2012 and the First outage of the Fourth Ten-Year Inservice Inspection Interval which began on October 10, 2009 and is scheduled to end on June 30, 2019.
In addition, the three CCNPP Unit 2 Reactor Vessel Supports were performed to satisfy the requirements of the Third Ten-Year Interval. These exams were identified as omitted from previous program plans and added after the 2009 outage. These exams were not credited towards the Fourth Ten-Year Interval.
As an alternate to the requirements of the ASME Boiler and Pressure Vessel Code (B&PVC), Section Xl, Article IWA-6000, CCNPP is implementing ASME Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1." Regulatory Guide 1.147, Revision 16 (Oct. 2010), approved ASME Code Case N-532-4 for use. This report complies with the requirements of ASME Code Case N-532-4.
In accordance with ASME Section Xl, IWB-2412(a), IWC-2412, IWD-2412, and IWE-2412(a), and with the exception of those examinations that are limited to components selected for examination under Examination Categories B-L-2 and B-M-2 and required only when the pump or valve is disassembled as specified in Table IWB-2500-1, IWC-2500-1, IWD-2500-1, IWF-2S00-1, and IWE-2500-1, including those examinations which CCNPP has requested and received approval in the form of requests for relief or alternates, the required examinations in each examination category have been completed for the First outage of the First Inspection Period of the Fourth Inspection Interval in accordance with Tables IWB-2412-1, IWC-2412-1, IWD-2412-1, and IWE-2412-1.
Owner's Activity Reports - Form OAR-1 Owner's Activity Reports, Form OAR-1 were prepared and certified upon completion of the Calvert Cliffs Nuclear Power Plant Unit 2, 2011 Refueling Outage (RFO-18) examination activity in accordance with the following inspection plans:
CENG- CCNPPI-iSI-004, Fourth Inservice Inspection Program Plan Second Interval Containment Inservice Inspection Program Plan Fourth Interval Inservice Inspection Pressure Testing Program Plan In addition to the Owner's Activity Reports, Form OAR-i, the following Tables are also included:
- a. Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, provides a listing of item(s) with flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such Information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).
Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Inservice Inspection Interval CCNPP2-OAR-004-018 CENG First Inservice Inspection Period Rev. 00 2011 Owner's Activity Report April 28, 2011 for Page 3 of 6 RFO-18 Inservice Examinations
- b. Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, identifies those items containing flaws or relevant conditions that exceeded the ASME Xl acceptance criteria (IWB-3000, IWC-3000, or IWD-3000) or in the case of supports, IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement, or corrective measure, may not have resulted from an examination or test required by ASME Section XI, and provides such information as Code Class, whether the item is a repair, replacement, or corrective action, item description, description of work, If the flaw or relevant condition was found during a scheduled ASME Section Xi examination or test, date completed, and the repair replacement plan number.
Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Inservice Inspection Interval CCNPP2-OAR-004-018 CENG First Inservice Inspection Period Rev. 0 2011 Owner's Activity Report April28, 2011 for Page 4 of 6 RFO-18 Inservice Examinations FORM OAR-1 OWNER'S ACTIVITY REPORT as required by the provisions of the ASME Code Case N-532-4 Report Number CCNPP-2-OAR-004-018 Plant Calvert Cliffs Nuclear Power Plant Unit No. 2 Commercial service date April 1. 1977 Refueling outage no. RFO-18 (if applicable)
Current inspection interval Fourth Inservice Inspection Interval - October 10, 2009 to June 30, 2019 (1st, 2nd, 3rd, 4th, other)
Current inspection period First Inservice Inspection Period - October 10, 2009 to June 30, 2012 (1st, 2nd, 3rd)
Edition and Addenda of Section Xl applicable to the inspection plans 2004 Edition, No Addenda Date and revision of inspection plans Fourth Interval Inservice Inspection Program Plan Rev. 0 Dated Dec. 28, 2009 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used: N-722 (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of RFO-18 conform to the requirements of Section XI.
Signed v "' Date Y , i /
GenerfSupervisor, CCNPP Nuclear Engineering Programs CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Maryland and employed by Hartford Steam Boiler IHSBCTI of Hartford. Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/
replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
_ __ _ _ _ _ _ Commissions NB 13074 ANI, MD 1225 Inspe'ýor'slignatur-e U National Board, State, Province, and Endorsements Date
,5*- iI-.If
Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Inservice Inspection Interval CCNPP2-OAR-004-018 CENG First Inservice Inspection Period Rev. 0 I-ý Z011 Owner's Activity Report April 28, 2011 for Page 5 of 6 RFO-18 Inservice Examinations Table 1 Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service as required by the provisions of the ASME Code Case N-532-4 Examination Item Category Number Item Description Evaluation Description B-K B10.30 RCP 21A-1 Support Lug Acceptable surface indication per IWB-3S18-2 F-A F1.30C 10"HB23-2160 (R-5) Component Support Performed Engineering Evaluation
Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Inservice Inspection Interval CCNPP2-OAR-004-018 CENG First Inservice Inspection Period Rev. 00 0 Z01oOwners Activity Report April 28, 2011 for Page 6 of 6 RFO-18 Inservice Examinations Table 2 Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service as required by the provisions of the ASME Code Case N-532-4 Code Item Description Date Repair/Replacement Class Description of Work Completed Plan Number B-P /
B15.140 PZR Nozzle N-3 Heater sleeve plug 03/24/2011 2011-2-009
__ +/-
___ I_____ I__ ____
End of Owner's Activity Report for Refueling Outage 18 (RFO-18)