Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657
- CENG, a joint venture of, 0 Constellation Energyt CALVERT CLIFFS NUCLEAR POWER PLANT June 21, 2010 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit No. 1; Docket No. 50-317 Inservice Insnection Renort
REFERENCE:
(a) American Society of Mechanical Engineers, Boiler & Pressure Vessel Code,Section XI, Article IWA-6000 Pursuant to Reference (a), please find enclosed the Inservice Inspection Report for the Calvert Cliffs Nuclear Power Plant Unit 1. This inspection fulfilled the intentions and requirements stated in our commitment to comply with the American Society of Mechanical Engineers, Boiler & Pressure Vessel Code,Section XI, Inservice Inspection Requirements.
Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.
Manager - Engineering Services JJS/RDW/bjd
Enclosure:
(1) 2010 Owner's Activity Report for U-I RFO Inservice Examinations cc: Mr. Craig Lowry (Without Enclosure)
D. V. Pickett, NRC Resident Inspector, NRC ,ko477 S. J. Collins,ý NRC S. Gray, DNR mak
- 1. v ENCLOSURE (1 2010 OWNER'S ACTIVITY REPORT FOR U-1 RFO INSERVICE EXAMINATIONS Calvert Cliffs Nuclear Power Plant, LLC
. June 21, 2010
CENG e joint venture ol Conrtellation #, eDF Constellation Energy Nuclear Corporation 100 Constellation Way, Suite 200C Candler Building, 2 NO. Floor Baltimore, Maryland 21202 FOURTH INSERVICE INSPECTION INTERVAL FIRST INSERVICE INSPECTION PERIOD 2010 OWNER'S ACTIVITY REPORT FOR RFO-19 INSERVICE EXAMINATIONS Prepared For Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 Commercial Service Date: May 8, 1975 NRC Docket Number: 50-317 Document Number: CCNPP1-OAR-004-019 Revision Number: 00 Date: June 3, 2010 Prprdby: >/ /I6juL EPrprrdd L. Anderson -'Corporate Fleet 1SI Engineering Programs Owner Reviewed by(
Carl LF 2 A _______
rMte Corpr Fleet ngineering Programs _____
Approved by:
William J** bef - neral pervisor Corporate Fleet Engineering Programs Reviewed by:
Timothy Bec :-CNPP ISI Program Implementer Reviewed by: c\i-)4- G ral orh William Wtlfson - General Supervisor CCNPP Site Engineering Programs
CENG Calvert Cliffs Nuclear Power Plant Unit I CCNPPI-OAR-004-019 a ,enlure of FOURTH INSERVICE INSPECTION INTERVAL Rev. 00 0Com on '11 2010 OWNERS' ACTIVITY REPORT F-y N FOR Date: June 3, 2010 INSERVICE EXAMINATIONS Page 1-2of i-8 ABSTRACT This Owner's Activity Report summarizes the results of the Calvert Cliffs Nuclear Power Plant (CCNPP), Unit 1, American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code (B&PVC), Section Xl, In-service (ISI) Examinations performed in Refueling Outage Nineteen (RFO-19). during the period from February 22, 2010 through March 25, 2010, the First outage of the First In-service Inspection Period which began on July 1, 2009 and is scheduled to end on June 30, 2012 and the First outage of the Fourth Ten-Year In-service Inspection Interval (July 1, 2009 through June 30, 2019).
In addition, the CCNPP Unit 1 Third Ten-Year In-service Inspection Interval was extended to June 30, 2010 as allowed tby IWA-24N0(d)(1). The examinations being performed to satisfy the requirements of the extended third inspection interval were performed in conjunction with the examinations performed to satisfy the requirements of the first outage of the fourth inspection interval- The examinations performed to satisfy the requirements of either the extended third inspection interval or the fourth inspection interval were not credited to both intervals.
As an alternate to the requirements of the ASME, Boiler and Pressure Vessel Code (B&PVC),Section XI, Article IWA-6000, CCNP.P is implementing ASME Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1". Regulatory Guide 1.147, Revision 15, approved ASME Code Case N-532-4 for use. This Report complieswith the requirements of Code Case N-532-4.
In accordance with ASME Section Al, IW632412 (a)i IWC-2412, IWD-2412 and IWE-2412(a)., and with the exception of those examinations that are limited to components selected for examination under Examination Categories B-L-2 and B-M-2.and required onlywhen the pump or valve is disassembled as specified in Table IWB-2500-1, IWC-2500-1, IWD-2500-1, IWF-2500-1 and IWE-2500-1, including those examinations which CCNPP has requested and received approval in the form of requests for relief or alternates, the required examinations in each examination category have been completed for the Third Inspection Interval and the First outage of the First In-service Inspection Period, of the Fourth Inspection Interval in accordance with Tables IWB-2412-1, IWC-2412-1, IWD-2412-1, and IWE-2412-1.
OWNER'S ACTIVITY REPORTS - FORM OAR-1 Owner's Activity Reports Form OAR-I's were prepared and certified upon completion of the Calvert Cliffs Nuclear Power Plant Unit 1, 2010 refueling outage (RFO-19) examination activity in accordance with the following inspection plans:
CENG-CCNPP1-ISI-003, Third In-service Inspection Plan and Schedule CENG-CCNPPl-ISI-004, Fourth In-service Inspection Plan and Schedule In addition to the Owner's Activity Report, Form OAR-1, the following Tables are also included:.
- a. Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, provides a listing of item(s) with flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flawor relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300)."
CENG ap*1olvtuc .....
Calvert Cliffs Nuclear Power Plant Unit FOURTH INSERVICE INSPECTION INTERVAL 1 CCNPP1-OAR-004ý019 Rev. 00 2010 OWNERS' ACTIVITY REPORT S&O*. eoF FOR Date: June 3, 2010 INSERVICE EXAMINATIONS Page i-3of i-8
- b. Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, identifies those items containing flaws or relevant conditions that exceeded the ASME Section XI acceptance criteria (IWX-3000) or in the case of supports IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement or corrective measure, may not have resulted from an examination or test required by Section XI, and provides such information as Code Class, whether the item is a repair, replacement or corrective action, item description, description of work, if the flaw or relevant condition was found during a scheduled Section XI Examination or test, date completed and the repair replacement plan number.
CEN GCalvert Cliffs Nuclear Power Plant Unit I CC.NPPI-OAR-004-019 lgjct venture 01 FOURTH INSERVICE INSPECTION INTERVAL Rev. 00 2010 OWNERS' ACTIVITY REPORT OEte _j.4 DF FOR Date: June 3, 2010 INSERVICE EXAMINATIONS Page i -4 of i -8 FORM,OAR-.i OWNERIS ACTIVITY REPORT As-required by. the :provisionsoofthe ASME Code Gase N532-4.
Repport Number CCNPP-I-OAR-004-019:
Owner Constellation Energy Nuclear:Group. 100 Constellaiion Way.,Baltimore, Maryland.21202 (Name:and Addire§s:, of Owner)
Plant, Calvert Cliffs Nuciear Power.oPiant,.. 1650.CalvertCliff* Parkway, Lusby, Maryland 20657 (Naeiranbrd Addreýs~cof Plant)
Plant-.Urit I Commercial Service Date .May* '1975 Refueling.Outage.Numrber RFO-19g Current'.In.spection linterval Third-I nservice. inspection -interval- july 1, 1999 toJune.-30, 2009
"(1stt 2nd, 3rd, 41th, Qther)y Third Inservi*:e lnsneCtirori Periodl- ~J:v1. .- 2006 to Current Inspectidn-Peiiod Ad J6ne:30 2009 Third ln§ervi6,6 lbspectiori Period:- JUIj-l 2006 Edition and Addenda.of Section XI applicable.to;theinspection Plan 11998 Edition, No Addend&a Dateahnd Revision of Inspection Plan Third Inteirval ihserviceinispectiori Progiaim Plan.RevisiOi* 04, Dated ,Apii127, 2009 Editi6n and Addenidaýdf.Section XI applicable to Re55airf/Replacemi ent-Activities, if different than..the Inspection Plan N/A Code Cases. used .NIA if appllicable CERTIFICATE OF CONFORMANCE I certify that(a),the statements made in thisreport are correct (b) the examinations and tests meet the Inspection Plan-as reluired by the ASME Code, Section;ý, and (c) tI erep.irjfepiacement activitie' .and evaiuations supporting the:completion of RFO-4-9 conform to the requirements of Sectiori .,/ /
Signed , Date- "- j ".
(Gendral Supo s- Cofo3 Rlet Engineering Programhs),
CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vesse.lInspectors-and th~tate or Province of R*-v Li L and employed by Hartford Steam Boiler (HSBCT) of Hartford, Connecticut have inspected the items described In this Owner's Activity Reportand state that to the of my Knowledge and belief, the Owner has<
-best performed all activities represented by this report in accordance-with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repairdreplacemeht activities and evaluation described in this report, Furthermore. neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss- of anykind arising from or connected with this inspection.
2V/. ý- ý , ,,, -- Commissions A(13 1304*/ 4W ,ý A*/b.Z.?ý Ih
,nipttor'Cignat~urFe- Qj National Board, State. Province, and Endorsements Date
CENG,.
aior.,,tur-eol Calvert Cliffs Nuclear Power Plant, Unit FOURTH INSERVICE INSPECTION INTERVAL 1
Rev.
CCNPPI-OAR-'004-019 00 0 - 2010 OWNERS' ACTIVITY REPORT VEn .eDF FOR Date.: June3, 2010 INSERVICE EXAMINATIONS Page i-5of i-8 FORM OAR-I OWNER'S ACTIVITY REPO'RT As .required*btythe provisionsmof theASME .Code"Case N532-4 Report Number C'CNPP 1-OAR-004-01 9ý Owner Constellation Energy Nuclear Group, 100 Constellation Way, Baltimore, Maryland.,21202 (Name and Address 6f Owne'i)
Plant Calvert!Cliffs Nuclear Power Plant; 1650 Calvert Cliffs. Parkway, Lusby, Maryland 20657 (Name and Address of Plant)
Plant Unit: -Commercial Service Date May 8, 1975 Refueling O(utage Number . RFO-19 Current Inspection Inter 11ýt I C:.JU 1 . 1k 'l-V ;I UI ~ LUi IlLI lI J~V I.4V1 L ,JII~~,£~
"(.t 2d'3rd, 4th; Other)
Current Inspection Period Firstrinservice Inspection Period - July-1, 2009 to June.30. 2012 (I st, 2nd,;3rd)'
Edition-and Addenda of Sectibn.XIapplic-able'tQoithe Inspection Plan 2004 Edition,.No Addenda ..
Date and:Revisionof lrInspection.Plari CENGýCCNPP1-ISI-004 inserlv.ice lnsopectioniplaiii Revision 00, Datedý Dec29. 2009 Edition and Addenda of Secti6n XI applicableto Repair/Replacement Actkvities, if differeint t'anthe Inrspection Plan' NIA:
Code Cases used N/A If applicable CERTIFICATE OF CONFORMANCE I certify, that (a) the statements made in this report are correct; (b) the examinations andstests meet the Inspection Plan awquired by the ASME'Code,Section XI;* .nd .c) the epairreplacement activities' and evaluations supporting the completion oRFO-1 9 conform to the requirements of.ctioh /. .
Signed Date,,1/__,_.._____
(Gen falAuu isor-- Corp ate teleet Erngiheering Programs)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdiqg a valid commission'issued by the National Board of Boiler and.ressure Vessel Inspectors and the State or Province of atrykwue- and empl oyedby Hartford Steam Boiler (HSBCT) of Hartford, Connecticut have: inspected the Items described -inthis OwnersActivity ftport, and state that to the best of my Knowledge and belief, the Ownerhas performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes aq warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector-nor his employer sml be liable in any manner for any personal injury or property damage or a loss tany kind arising from or connected with this inspection.
comsin lVd /SOH AMJ A161/zZ5 Ih qt(*o.s Signatue (J National Board, State, 'Province, and Endorsement Date'
CNCalvert Cliffs Nuclear Power Plant Unit I CCNPPI-OAR-004-019 "apjointltueof.. FOURTH INSERVICE INSPECTION Rev. 00 INTERVAL
- eF
%-D 2010 OWNERS' ACTIVITY REPORT Date: June 3, 2010 FOR INSERVICE EXAMINATIONS Page i -6 of i -8 TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE As required by the provisions of the ASME Code Case N-532-4 EXAMINATION ITEM EVALUATION DESCCRIPTION CATEGORY AND ITEM NUMBER DESCRIPTION R-A, R1.20 4-SR-1 006-1 Pressurizer Nozzle- Unacceptable per IWB-3514-2, to-Safe End Performed Analytical Evaluation per IWB-3600, F-A, FI.10A 12-SI-1010-H-3, Component Performed Engineering Evaluation Support
CENG Calvert Cliffs Nuclear Power Plant Unit I CCNPP1-OAR-004-:019 aJ(mil ventre ol D FOURTH INSERVICE INSPECTION INTERVAL Rev. 00 Ocmgffl" d*'e2010 OWNERS' ACTIVITY REPORT EWV -- FOR Date: June 3, 2010 INSERVICE EXAMINATIONS Page i-7of i-8 TABLE 2 ABSTRACT OF REPAIRREPLACEMENTACTIVITIES REQUIRED FOR CONTINUED SERVICE As required by the provisims of the ASME Code Case N-532-4 CODE ITEM DESCRIPTION DATE REPAIRIREPLACEMENT CLASS DESCRIPTION OF WORK COMPLETED PLAN NUMBER NONE Al
CENG joirtlventIuf.f Calvert Cliffs Nuclear Power Plant FOURTH INSERVICE INSPECTION INTERVAL Unit1 1 CCNPPl-OAR-004-019 Rev. 00 Omt 11ýeDF 2010 OWNERS' ACTIVITY REPORT EwW eDr FOR Date: June 3,2010 INSERVICE EXAMINATIONS Page i-8of 1-8 END OF OWNER'S ACTIVITY REPORT FOR REFUELING OUTAGE NINETEEN (RFO-19)