Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 Nuclear Generation Group Constellation Energy June 12, 2009 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Inservice Inspection Reoort

REFERENCE:

(a) American Society of Mechanical Engineers, Boiler & Pressure Vessel Code,Section XI, Article IWA-6000 Pursuant to Reference (a), please find enclosed the Inservice Inspection Report for the Calvert Cliffs Nuclear Power Plant Unit 2. This inspection fulfilled the intentions and requirements stated in our commitment to comply with the American Society of Mechanical Engineers, Boiler & Pressure Vessel Code,Section XI, Inservice Inspection Requirements.

Should you have questions regarding this matter, please contact Mr. Jay S. Gaines at (410) 495-5219.

Very truly yours, Mark D. Flaherty Manager - Engineering Services MDF/RDW/bjd

Enclosure:

(1) 2009 Owner's Activity Report for RFO-17 Inservice Examinations cc: Mr. Craig Lowry (Without Enclosure)

D. V. Pickett, NRC Resident Inspector, NRC S. J. Collins, NRC S. Gray, DNR

~A047

ENCLOSURE (1) 2009 OWNER'S ACTIVITY REPORT FOR RFO-17 INSERVICE EXAMINATIONS Calvert Cliffs Nuclear Power Plant, Inc.

June 12, 2009.

JNuclear Calvert Gliffs Nuclear Power Plant A AMfttc CateltonW 04 tho Eft~ruy Group Constellation Energy 750 East Pratt Street Baltimore, Maryland 21202 THIRD INSERVICE INSPECTION INTERVAL THIRD INSERVICE INSPECTION PERIOD 2009 OWNER'S ACTIVITY REPORT FOR RFO-17 INSERVICE EXAMINATIONS Prepared For Calvert Cliffs Nuclear Power Plant 1660 Calvert Cliffs Parkway Lusby, MD 20657 Commercial Service Date: April 1, 1977 NRC Docket Number: 50-318 Document Number: CCN PP2-OAR-003-017 Revision Number: 00 Date: May 19, 2009 Prepared by:, 00 Roy.a - Principal Engineer Analyst Corporate Engine ing Programs Reviewed by - cie-a'-d ard L. Anderson - Principal Engineer Analyst Corporft% Engineering Programs Approved by:( 2 1 . . 6cr V//1/, JLIC ^04tell c//fr '/reee.f, 5/z2o/wocl William J. Campbell - G eral Supervisor Corporate Engineering Programs Reviewed by: ;;-o-Tim .,k-)iteS ram Implementer Approved by: <- z_ -0 Brian S. Hailer- General Supervisor - Engineering Programs Unit

Calvert Cliffs Nuclear Power Plant, Unit 2 CCNPP2-OAR-003-17 0 THIRD INSERVICE INSPECTION INTERVAL Rev. 00 uNK 2009 OWNER'S ACTIVITY REPORT FOR Date: May 19, 2009 Calvert. Clis INSERVICE EXAMINATIONS Nuclear Power Piant Page i-2of 1-8 A UMobo, o0 triv TABLE OF CONTENTS T a ble of Co nte nts ................................................................................................................................................ i-2 A bs tra ct .................................................................................................................................................................... i-3 Form OAR-1 Owner's Activity Report for Inservice Inspection Plan (Includes RI-ISI) ....................................... i-4 Form OAR-1 Owner's Activity Report for Containment Inservice Inspection Plan ................................................. i-5 Table 1 Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service ......................... i-6 Table 2,Abstract of Repair/Replacement Activities Required for Continued Service ............................................ i-7

Calvert Cliffs Nuclear Power Plant, Unit 2 CCNPP2-OAR-003-17 THIRD INSERVICE INSPECTION INTERVAL Rev. 00 N1)dear 2009 OWNER'S FOR ACTIVITY REPORT Date: May 19, 2009 Crvert Cliffs INSERVICE EXAMINATIONS Nuclear Power Plani Page i-3of i-8 14AkvslXrOat 00 ABSTRACT This Owner's Activity Report summarizes the results of the Calvert Cliffs Nuclear Power Plant (CCNPP), Unit 2, American Society of Mechanical Engineers (ASME) Section Xl Inservice Inspection, Risk-Informed Inspection and Containment Inservice Examinations performed during Refueling Outage Seventeen (RFO-17), from February 22; 2009 through March 17, 2009, and the Second and final outage of the Third Inservice Inspection Period that started on July 1, 2006 and is scheduled to end on October 9, 2009.

As an alternate to the requirements of the ASME, Boiler and Pressure Vessel Code (B&PVC),Section XI, Article IWA-6000, CCNPP is implementing ASME Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1". Regulatory Guide 1.147, Revision 15, approved ASME Code Case N-532-4 for use. This Report complies with the requirements of Code Case N-532-4.

OWNER'S ACTIVITY REPORTS - FORM OAR-I Owner's Activity Reports Form OAR-I's were prepared and certified upon completion of the CCNPP Unit 2, 2009 refueling outage (RFO-1 7) examination activity in accordance with the following inspection plans and schedules:

N Inservice Inspection Program Plan(s) for the Third and successive Inspection Intervals for CCNPP Units 1 and 2 W Long Term Plan for CCNPP, Unit 2 E CCNP-002-004, Calvert Cliffs Nuclear Power Plant Risk-Informed Inservice Inspection Application to Class 1 and 2 Piping Final Report 2 ISI Program Plan ASME Xl, IWE/IWL First Inspection Interval In addition to the Owner's Activity Report, Form OAR-i, the following Tables are also included:

a. Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, provides a listing of item(s) with flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).
b. Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, identifies those items containing flaws or relevant conditions that exceeded the ASME Section XI acceptance criteria (IWX-3000) or in the case of supports IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement or corrective measure, may not have resulted from an examination or test required by Section Xl, and provides such information as Code Class, whether the item is a repair, replacement or corrective action, item description, description of work, if the flaw or relevant condition was found during a scheduled Section XI Examination or test, date completed and the repair replacement plan number.

Calvert Cliffs Nuclear Power Plant, Unit 2 CCNPP2-OAR-003-17 N

e lc c nsteada" THIRD INSERVICE INSPECTION INTERVAL 2009 OWNER'S ACTIVITY REPORT Rev. 00 0 FOR Date: May 19, 2009 Cailert Cliffs INSERVICE EXAMINATIONS N4udear Power Plant Page i-4of i-8 A cutrba oJiM FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-1 Report Number CCNPP2-OAR-003-17 Plant Calvert Cliffs Nuclear Power Plant, 1650 Calvert Cliffs Parkway, Lusby, Maryland 20657 (Name and Address of Plant)

Unit No. 2 Commercial Service Date April 1, 1977 Refueling Outage Number RFO-17 Current Inspection Interval Third Inservice Inspection Interval - July 1. 1999 to October 9. 2009 (1st, 2nd, 3rd, 4th, Other)

Current Inspection Period Third Inservice Inspection Period - July 1 2006 to October 9. 2009 (1st, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the Inspection Plan 1998 Edition, No Addenda Date and Revision of Inspection Plan Revision 04; Change 0, Dated May 12, 2009 Edition and Addenda of ASME Section XI applicable to repairs/replacements, ifdifferent than the Inspection Plan N/A Code Cases used:

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting completion of RFO-17 conform to the requirements of Section XI.

Certificate of Auth.iization No. . N/A Expiration Date N/A (If applicable)

Signed Date f- /9"_f (Getie(al ,upeirvisof,-'%orporate-Engineering Programs)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Maryland and employed by Hartford Steam Boiler (HSBCT) of Hartford. Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signingthis certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Jeffrey P. Mclntyre 9 Commissions NB13074 Maryland - 1225, A, N. I Inspector's Signat re u . National Board, State, Province, and Endorsements Date"

Calvert Cliffs Nuclear Power Plant, Unit 2 CCNPP2-OAR-003-17

'* Ccnl~r n THIRD INSERVICE INSPECTION INTERVAL Rev. 00 Nucw 2009 OWNER'S ACTIVITY REPORT W FOR Date: May 19, 2009 Calvert Cliffs INSERVICE EXAMINATIONS Nuclear Power Plant Page i-5of i-8 A MtnlbW 01 0 FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-1 Report Number CCNPP2-OAR-003-17 Plant Calvert Cliffs Nuclear Power Plant, 1650 Calvert Cliffs Parkway, Lusby, Maryland 20657 (Name and Address of Plant)

Unit No; 2 Commercial Service Date April 1, 1977 Refueling Outage Number RFO-17 Current Inspection Interval First Containment Inspection Interval - July 1. 1999 to September 8, 2009 (1st, 2nd, 3rd, 4th, Other)

Current Inspection Period Third Inservice Inspection Period - July 1. 2006 to September 8, 2009 (1st, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the Inspection Plans 1992 Edition, 1992 Addenda Date and Revision of Inspection Plans Revision 03, Change 0. Dated May 29, 2008 Edition and Addenda of ASME Section XI applicable to repairs/replacements, if different than the Inspection Plan N/A Code Cases used:

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) thestatements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting completion of RFO-17 conform to the requirements of Section XI.

Certificate of A4thorization No. N/A Expiration Date N/A (f J / (Ifapplicable)

Signed '4!M, LFZ Date ~II CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Maryland and employed by Hartford Steam Boiler (HSBCT) of Hartford. Connecticut have inspected the items described in this Owners Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Jeffrey P. McIntvre Commissions NB1 3074, Maryland - 1225, A, N, I Inspector's Signature - (Cr National Board, State, Province, and Endorsements Date 6 09

Calvert Cliffs Nuclear Power Plant, Unit 2 CCNPP2-OAR-003-17 Canzta]aftn THIRD INSERVICE INSPECTION INTERVAL Rev. 00 cL-ear 2009 OWNER'S ACTIVITY REPORT FOR Date: May 19, 2009 Calvert Clifs INSERVICE EXAMINATIONS Nvctear Power Plant Page i-6of i-8 A .*dnbarG1b14 TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE As reouired by the provisions of the ASME Code Case N-532-4 EXAMINATION ITEM EVALUATION DESCCRIPTION CATEGORY AND ITEM NUMBER DESCRIPTION None

_____ t_______ 1.________

4 4.

4 +

4 4.

& 1.

4 .4.

4 4.

4.

1 .4.

i .' I t "t Calvert Cliffs Nuclear Power Plant, Unit 2 CCNPP2-OAR-003-17

,THIRD INSERVICE INSPECTION INTERVAL Rev. 00 3 t2009 w OWNER'S ACTIVITY REPORT FOR Date: May 19, 2009 Calvert Cliffs INSERVICE EXAMINATIONS Nuclear Power Plant Page i -7of i - 8 TABLE 2 ABSTRACT OF REPAIRIREPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE As required by the provisions of the ASME Code Case N-532-4 CODE ITEM DESCRIPTION DATE REPAIR/REPLACEMENT CLASS DESCRIPTION OF WORK COMPLETED PLAN NUMBER MC 2DOOR67 Restore about 1 1/2 inch March 2008-2-041 of knife edge on the 2009 (M02200701898)

Equipment Hatch Door.

One Snubber 2-52-53A Replace worn snubber March 2009-2-012 brackets. 2009 (M02200900690)

Calvert Cliffs Nuclear Power Plant, Unit 2 CCNPP2-OAR-003-17 os u THIRD INSERVICE INSPECTION INTERVAL Rev. 00 F NUCde..& 2009 OWNER'S FOR ACTIVITY REPORT Date: May 19, 2009 Calver Cliffs INSERVICE EXAMINATIONS Nuclear Power Plant Page i-8of i-8 A Afmm C1 f END OF INSERVICE INSPECTION OWNER'S ACTIVITY REPORT FOR REFUELING OUTAGE SEVENTEEN (RFO-17)