ML12178A444

From kanterella
Jump to navigation Jump to search
Submittal of Inservice Inspection Report
ML12178A444
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 06/25/2012
From: John Stanley
Calvert Cliffs, Constellation Energy Nuclear Group, EDF Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML12178A444 (8)


Text

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG a joint venture of Constellation "' eDF eDF Energy-CALVERT CLIFFS NUCLEAR POWER PLANT June 25, 2012 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit No. 1; Docket No. 50-317 Inservice Inspection Report

REFERENCE:

(a) American Society of Mechanical Engineers, Boiler & Pressure Vessel Code,Section XI, Article IWA-6000 Pursuant to Reference (a), please find enclosed the Inservice Inspection Report for the Calvert Cliffs Nuclear Power Plant Unit 1.

Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.

Manager - Engineering Services JJS/PSF/bjd

Enclosure:

(1) 2012 Owner's Activity Report for RFO-20 Inservice Examinations cc: Mr. Craig Lowry (Without Enclosure)

N. S. Morgan, NRC Resident Inspector, NRC W. M. Dean, NRC S. Gray, DNR Ac4-ý

ENCLOSURE (1) 2012 OWNER'S ACTIVITY REPORT FOR RFO-20 INSERVICE EXAMINATIONS Calvert Cliffs Nuclear Power Plant, LLC June 25, 2012

CENG

->ot O*,

Cahmrt aiffs Nudear Power Plant, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657 Fourth Interval / First Period Inservice Inspection Program and the Second Interval / Second Period Containment IWE/L Program 2012 Owners Activity Report for RFO-20 Inservice Examinations Commercial Service Date: May 8, 1975 NRC Docket Number: 50-317 Document Number: CCNPP1-OAR-004-020 Revision Number: 00 Prepared by: c ' iZ-rTimr y Beck - Site ISI Program Owner Reviewed by: M:? G.A.

Ar b .S Nuclear Engineering Programs Approved by: e (5nýJ Sti*rane Engineringservices

Calvert Cliffs Nudear Power Plant Unit 1 C E CEGSecond

.N Four* Intervl / First Period inservice Inspection intervall I Second Period Contalnmert CCNPPI-OAR-004-0Z0 Rev. 0(0 V 2012 Owner's Activity Report March 23, 2012 for Page 2 of 6 RFO-20 Inservice Examinations Abstract This Owner's Activity Report (OAR) summarizes the results of the Calvert Cliffs Nuclear Power Plant (CCNPP), Unit 1, American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code (B&PVC), Section Xl, Inservice Inspection examinations (151), performed in Refueling Outage 20 (RFO-20) during the period from March 26, 2010 through April 9, 2012, the First Inservice Inspection Period which began on October 10, 2009 and is scheduled to end on October 9, 2012 and the First outage of the Fourth Ten-Year Inservice Inspection Interval which began on October 10, 2009 and is scheduled to end on June 30, 2019.

As an alternate to the requirements of the ASME Boiler and Pressure Vessel Code (B&PVC), Section Xl, Article IWA-6000, CCNPP is implementing ASME Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000, Section Xl, Division 1." Regulatory Guide 1.147, Revision 16 (Oct. 2010), approved ASME Code Case N-532-4 for use. This report complies with the requirements of ASME Code Case N-532-4.

In accordance with ASME Section XA, IWB-2412(a), IWC-2412, and IWD-2412, including those examinations which CCNPP has requested and received approval in the form of requests for relief or alternates, the required examinations in each examination category have been completed for the Second outage of the First Inspection Period of the Fourth Inspection Interval in accordance with Tables IWB-2412-1, IWC-2412-1, and IWD-2412-1.

In accordance with ASME Section Xl, IWE-2412 and IWL-2400, including those examinations which CCNPP has requested and received approval in the form of requests for relief or alternates, the required examinations in each examination category have been completed for the Second Inspection Period through RFO-20 of the Second Inspection Interval in accordance with Table IWE-2412-1 and IWL-2400.

Owner's Activity Reports - Form OAR-1 Owner's Activity Reports, Form OAR-1 were prepared and certified upon completion of the Calvert Cliffs Nuclear Power Plant Unit 1, 2*12 Refueling Outage (RFO-20 examination activity in accordance with the following inspection plans:

Fourth Interval Inservice Inspection Program Plan Second Interval Containment Inservice Inspection Program Plan Fourth Interval Inservice Inspection Pressure Testing Program Plan Steam Generator Inspection Program In addition to the Owner's Activity Reports, Form OAR-i, the following Tables are also included:

Table 1 Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, provides a listing of item(s) with (laws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such Information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).

Table 2 Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Identifies those items containing flaws or relevant conditions that exceeded the ASME Xl acceptance criteria (IWH-30UU, IWC-3UUU, or IWD-30UU) or in the case of supports, IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement, or corrective measure, may not have resulted from an examination or test required by ASME Section XI, and provides such information as Code Class, whether the Item is a repair, replacement, or corrective action, item description, description of work, if the flaw or relevant condition was found during a scheduled ASME Section Xl examination or test, date completed, and the repair replacement plan number.

Calvert Cliffs Nudear Power Plant Unit 1 C ENG Fourth Second Interval Interval / First

/ Second pection Inse Containment PeriolPeriod CCNPPI-OAR-0-020 Rev. 00 2012 Owner's Actvty Report March 23. 2012 I tP* for Page 3 of 6 RFO-20 Inservlce Examinations FORM OAR-1 OWNER'S ACTIVITY REPORT as required by the provisions of the ASME Code Case N-532-4 Report Number CCNPPl-OAR-004-020 Plant Calvert Cliffs Nuclear Power Plant Unit No. 1 Commercial service date__ May 8, 1975 __ Refueling outage no. __ RFO-20 (ifapplicable)

Current inspection interval __ Fourth Inservice Inspection Interval - October 10, 2009 to June 30, 2019 (1st, 2nd. 3rd, 4th, other)

Current inspection period _ First Inservice Inspection Period - October 10, 2009 to October 9, 2012 (1st, 2nd, 3rd)

Edition and Addenda of Section Xl applicable to the inspection plans _ 2004 Edition, No Addenda Date and revision of inspection plans Fourth Interval Inservice Inspection Program Plan Rev. 0 Dated Dec. 28, 2009 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used: N-460, N-526, N-53Z-4.N-552, N-566-2, N-586-1. N-593, N-613-1. N-bib. N-619, N-624, N-639, N-641, N-648-1. N-665. N-686-1. N-716. N-722-1. N-729-1. N-747. N-753, N-770-1.

(If ,pplkidbh*)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement actiuities and evaluations supporting the completion of RFO-20 conform to the requirements o Sectio 1.

Signed Date -

Ge'nero~upervisor, CCNPP Nuclear Engineering Programs CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of -Maryland __and employed by -Hartford Steam Boiler (HSBCT) __ of -Hartford. Connecticut -

have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.

s wty* ' - - Commissions - NB 13074 ANI, MD 1225 r In s gctofs Slgna-*ure National Board. State, Province. and Endorsements Date 0(0 - i .)a

Calvert ClIff Nuclear Power Plant Unit 1 CENG Fourth Interval / First Period Inservice Inspectlon Second Interval / Second Period Containment CCNP*l-OAR-004-020 Rev. 00 2012 Owner's Activity Report March 23, 2012 for Page 4 of 6 RFO-20 Insernice Examinations FORM OAR-i OWNEWS ACTNVITY REPORT as required by the provisions of the ASME Code Case N-532-4 Report Number CCNPPI-OAR-004-020 Plant Calvert Cliffs Nuclear Power Plant Unit No. 1 Commercial service date __ May 8, 1975 __ Refueling outage no. _ RFO-20 (if applicable)

Current inspection interval __ Second Inservice Inspection Interval - September 9, 2009 to September 9, 2018 (1st, 2nd, 3rd, 4th, other)

Current inspection period __ Second Inservice Inspection Period - September 9, 2011 to September 9, 2015 (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans __ 2004 Edition, No Addenda Date and revision of inspection plans Second Interval Containment Inservice Inspection Program Rev. 0 Dated Sep. 4, 2009 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used: N-532-4. N-624, N-686-1. N-739. and N-753 (If applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made In this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of RFO-20 conform to the requirements of Sectionil, Signd-/ WZIW1&&UZ--Date 0Y.45. 47 VGeneral*Jpervisor, CCNPP Nuclear Engineering Programs CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of _ Maryland -_andemployed by - Hartford Steam Boiler (HSBCT) _ of - Hartford, Connecticut have inspected the items described In this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report In accordance with the requirements of Section XA.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair, replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.

Commissions __ NB 13074 ANI, MO 1225

Ins~ectoYs signature' 1 Q National Board, State, Province, and Endorsements Da te 0 6 12 -

Calvert Cliffs Nudear Power Plant Unit 1 C ENG Fourth Interval / First Period Inservice Inspection Second Interval / Second Period Containment CClPPI-OAR-004-20 Rev. 00 2012 Owner's Activity Report March 23, 2012 VOfor Page S of 6 RFO-20 Insenvice Examinations Table 1 Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service as required by the provisions of the ASME Code Case N-532-4 Examination Item Item Evaluation Category Number Description Description N/A N/A Class III Valve Body - 1CV-3988 AcceptanceiD30by Design EP1-024 Engineering Evaluation per I IWD-3600 (ECP-12-000224)

Acceptance by Design Engineering Evaluation per E-A E1.30 IWE Moisture Barrier(ECP 207)

Calvert Cliffs Nudear Power Plant Unit 1 C ENG Fourth Interval / First Period Inservice Inspection Second Interval / Second Period Containment CCNPP1-OAR-0044020 Rev. 00 I 2012 Owner's Activity Report March 23, 2012 R n for PageE6mofi6 RFO-20 Insenhlce Examinations Table 2 Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service as required by the provisions of the ASME Code Case N-532-4 Code Item Description Date Repair/Replacement Class Description of Work Completed Plan Number 1 1SNUB1-83-12 Replace worn rear snubber bracket 3/8/12 2012-1-014 1 1SNUB1-83-11 Replace worn snubber bracket 3/8/12 2012-1-013 1 1SNUB1-52-39 Replace worn snubber bracket 3/14/12 2012-1-023 1 1SNUB1-52-39A Replace worn snubber bracket 3/14/12 2012-1-023 1 1SNUB1-83-18 Replace worn rear snubber bracket 3/26/12 2012-1-012 1 ISNUB1-52-42 Replace worn snubber bracket 3/28/12 2012-1-024 1 1SNUB1-S2-42A Replace worn snubber bracket 3/28/12 2012-1-024 3 1CV-3988 Indication arrest hole in internal ligament 3/24/12 2011-1-058

__ I ____ I __________ I ___ .1 ________

4 4 .5 .5

.5 1 ___________________________________ .1 __________________________

End of Owner's Activity Report