ML16012A468

From kanterella
Jump to navigation Jump to search
Inservice Inspection Reports
ML16012A468
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/08/2016
From: George Gellrich
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CCNPP-1-OAR-004-021, Rev. 1, CCNPP-2-OAR-004-019, Rev. 2
Download: ML16012A468 (16)


Text

~Exeton Generation George H. Gelirich Site Vice President Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5200 Office 717 497 3463 Mobile www.exeloncorp.com george.gellrich@exeloncorp.com January 8, 2016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Calvert Cliffs Nuclear Power Plant, Unit No. 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 Inservice Insp~ection Reports

1.

American Society of Mechanical Engineers, Boiler & Pressure Vessel Code, Section Xl, Article IWA-6000

Subject:

Reference:

Pursuant to Reference 1, please find enclosed the revised Inservice Inspection Reports for Calvert Cliffs Nuclear Power Plant Units 1 and 2.

There are no regulatory commitments contained in this letter.

Should you have questions regarding this matter, please contact Mr. Larry D. Smith at (410) 495-5219.

Respectfully, George H. Gellinch Site Vice President GHG/PSF/bjm

Enclosures:

(1) Unit 1 2014 Owner's Activity Report for RFO-21 Inservice Examinations, revision 1 (2) Unit 2 2013 Owner's Activity Report for RFO-19 Inservice Examinations, revision 2

Document Control Desk January 8, 2016 Page 2 cc:

(Without Enclosure)

NRC Project Manager, Calvert Cliffs NRC Regional Administrator, Region I NRC Resident Inspector, Calvert Cliffs S. Gray, MD-DNR

ENCLOSURE (1)

Unit 1 2014 OWNER'S ACTIVITY REPORT FOR RFO-21 INSERVICE EXAMINATIONS, REVISION 1 Calvert Cliffs Nuclear Power Plant January 8, 2016

Calvert Cliffs Nuclear Power Plant, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657 Exelton G~enerationo.

Fourth Interval I Second Period Inservice Inspection Program and Second Intervall/ Second Period Containment IWE/L Program 2014 Owner's Activity Report for RFO-21 Inservice Examinations Commercial Service Date: May 8, 1975 NRC Docket Number:

50-317 Document Number: CCNPP-1 -OAR-004-021 Revision Number:

01 Prepared by:

/1, Jeffrey 'Mclntyre - B-ackup Si teSI Program Owner Reviewed by:

  • .**?,*

m

.Lye

  • ,-C*,~?.*

e,* &.

~Angel Reyes-Cri1*

Site ISl Program Owner Reviewed by:

k(t*

Kurt Bodine - Manager Nuclear Engineering Programs

Calvert Cliffs Nuclear Power Plant Unit 1 Fouth nteva

/ irs Prio InervceInsectonCCN PP-i1-OAR-004-021 Fourh Iteral /Firt PriodInsrvie InpecionRev.

01 Second Interval / Second Period Containment January 5, 2016 SExelon Gener~tion, 2014 Owner's Activity ReportPae2o6 forPae2o6 RFO-21 Inservice Examinations Abstract________________________

This Owner's Activity Report (OAR) summarizes the results of the Calvert Cliffs Nuclear Power Plant (CCNPP),

Unit 1, American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (B&PVC), Section Xl, Inservice Inspection (ISI) examinations performed in Refueling Outage twenty one (RFO-21) during the period from April 9, 2012 through March 20, 2014 of the Second Inservice Inspection Period which began on October 10, 2012 and is scheduled to end on October 9, 2016, and the Third outage of the Fourth Ten-Year Inservice Inspection Interval which began on October 10, 2009 and is scheduled to end on June 30, 2019.

This report complies with the requirements set forth by ASME B&PVC,Section XI 2004 Edition, Article IWA-6000 as modified by ASME Code Case N-532-4, "Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission."

In accordance with ASME Section Xl, IWB-2400, IWC-2400, IWD-2400, IWE-2400, and IWF-2400, and with the exception of those examinations that are limited to components selected for examination under Examination Categories B-L-2 and B-M-2 and required only when the pump or valve is disassembled as specified in Table IWB-2500-1, IWC-2500-1, and IWD-2500-1, including those examinations which CCNPP has requested and received approval in the form of requests for relief or alternates, the required examinations in each examination category have been completed for the First outage of the Second Inspection Period of the Fourth Inspection Interval in accordance with Tables IWB-241 2-1, IWC-241 2-1, IWD-241 2-1, IWE-241 2-1 and IWF-241 0-2.

Owner's Activity Reports - Form OAR-i Owner's Activity Reports, Form OAR-i, were prepared and certified upon completion of the Calvert Cliffs Nuclear Power Plant Unit 1, 2014 Refueling Outage (RFO-21) examination activity in accordance with the following inspection plans:

Fourth Inservice Inspection Program Plan Second Interval Containment Inservice Inspection Program Plan Fourth Interval Inservice Inspection Pressure Testing Program Plan In addition to the Owner's Activity Reports, Form OAR-i, the following Tables are also included:

a.

Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, which provides a listing of item(s) with flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).

b.

Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, which identifies those items containing flaws or relevant conditions that exceeded the ASME XI acceptance criteria (IWB-3000, IWC-3000, and IWD-3000) or in the case of supports, IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement, or corrective measure, may not have resulted from an examination or test required by ASME Section Xl, and provides such information as Code Class, item description, description of work, date completed, and the repair replacement plan number.

Calvert Cliffs Nuclear Power Plant Unit 1

~~Exe[0n Generation, Faurth Interval / First Period Inservice Inspection Second Interval / Second Period Containment 2014 Owner's Activity Report for RFO-21 Inservice Examinations CCN PP-i1-OAR-004-021 Rev. 01 January 5, 2016 Page 3 of 6 FORM OAR-i OWNER'S ACTIVITY REPORT Fourth Interval/Second Period of Inservice Inspection Program As required by the provisions of the ASME Code Case N-532-4 Report Number CCNPP-1 -OAR-004-021 Plant Calvert Cliffs Nuclear Power Plant Unit No.

1 (if applicable)

Current Inspection Interval Current Inspection Period Commercial Service Date May 8, 1975 Refueling Outage Number RFO-21 Fourth Inservice Inspection Interval - October 10, 2009 to June 30, 2019 (1* 2nd 3ra, 4tr, other)

Second Inservice Inspection Period - October 10, 2012 to October 9, 2016 Edition and Addenda of Section XI applicable to the Inspection Plans Date!/ Revision of Inspection Plans______________

2004 Edition, No addenda Rev. 1 Ch. 1 Dated June 4, 2013 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used:

N-460, N-532-4, N-566-2, N-61 6, N-624, N-639, N-686-1, N-71 6. N-722-1, N-729-1, N-753, N-770-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of RFO-21 conform to the requirements of Section Xl (refueling outage number)

Signed Kurt Bodine -

i>

  • L2 Date Manager, CCNPP Nuclear Engineering Programs CERTIFICATE OF INSER VICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB Global Standards of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repair!

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal mnjLlrY or property damage or a loss of any kind arising from or connected with this inspection 4

L CommisSions j(npctrs*'atr)*'

I53"oa-TA "'t1*

A*)

  • 1*

I (Insectr's natre)National Board, State, Province, and Endor~ements Date

\\/./ '

C Calvert Cliffs Nuclear Power Plant Unit 1 Fourth Interval / First Period Inservice Inspection CNP-ORev.01 402 SSecond Interval / Second Period Containment Januar 52016 SExe~on Generation, 2014 Owner's Activity ReportPae4o6 forPae4o6 RFO-21 Inservice Examinations FORM OAR-i OWNER'S ACTIVITY REPORT Second Interval/Second Period of Containment IWEIL Inservice Inspection Program As required by the provisions of the ASME Code Case N-532-4 Report Number CCNPP-1 -OAR-004-021 Plant Calvert Cliffs Nuclear Power Plant Unit No.

1 Commercial Service Date May 8, 1975 Refueling Outage Number RFO-21 (if applicable)

Current Inspection interval Current Inspection Period Second Inservice Inspection Interval - September 9, 2009 to September 9, 2018 (1V', 2"=, 3'a, 4th, other)

Second Inservice Inspection Period - September 9, 2011 to September 9. 2015 Edition and Addenda of Section Xl applicable to the Inspection Plans Date / Revision of Inspection Plans (1o,, 2,% 3,)

2004 Edition, No addenda Rev. 1 Dated Feb. 6, 2014 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used:

N-532-4, N-624, N-686-1, N-739, N-753 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of RFO-21 conform to the requirements of Section Xl (refueling outage number)

Signed Kurt Bodine -" b*...,*

Date i.1 Manager, CCNPP Nuclear Engineering Programs CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB Global Standards of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repairl replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection A.*i CoL."'*'Ispc*Sgaur)

Commissions

,.j (\\

1i-IS*O

-JA-~I51*" A}NiI (lnpecd~Sigatue)National Board, State, Province, and Endorsementsa Date

Calvert Cliffs Nuclear Power Plant Unit 1 Fourth Interval / First Period Inservice Inspection CNP1ORev.01 402 Second Interval/ISecond Period Containment Januar 52016 SExeton Generation.

2014 Owner's Activity Report Pagear 5, of16 forPae5o6 RFO-21 Inservice Examinations Table 1 Items with Flaws or Relevant Condition that Require Evaluation for Continued Service As required by the provisions of the ASME Code Case N-532-4

,Examination Item Number Item Description Evaluation Description,

Category.

F-

l.

BComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-11B(2-CV-1005-R-17)

(Accepted 'as is' per ESR-14-000251)

Fl1BComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-A F11B(2-CV-1005-H-14)

(Accepted 'as is' per ESR-14-000251)

Component Support Acceptance by Design Evaluation per IWF-31 12.3 F-A Fl1.400 (11 iA-i1SC)

(Accepted 'as is' per Attachment 2 of ES-002)

F-l 4CComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-14C(1 1A-2SC)

(Accepted 'as is' per Attachment 2 of ES-002)

F-l 4CComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-14C(11 A-3SC)

(Accepted 'as is' per Attachment 2 of ES-002)

F-l 4CComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-14C(11lA-4SC)

(Accepted 'as is' per Attachment 2 of ES-002)

Component Support Acceptance by Design Evaluation per IWF-31 12.3 F-A F1.20A (8-CS-1205-H-5,R-3)

(Accepted 'as is' per CR-2014-001 553)

F.2BComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-A F12B(12-SC-1208-H-3)

(Accepted 'as is' per ECP-l14-000291 )

E-l.1Primary Containment Acceptance by Design Evaluation per IWE-351 0.4

-AE.1 Liner (Elevation 69'-1 18')

(Accepted 'as is' per ESR-1 4-000208)

Calvert Cliffs Nuclear Power Plant Unit 1 Fourth Interval / First Period Inservice Inspection CNP1ORev.01 402 Second Interval / Second Period Containment Januar 52016 SExeton Genlerationl, 2014 Owner's Activity Report Panagey of 206 forPae6o6 RFO-21 Inservice Examinations Table 2 Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service as required by the provisions of the ASME Code Case N-532-4 Code item Description Description of Work Date' R&R Plan Class ComPleted Number 1

Snubber 1-52-42 Replace worn pin and weld bracket at the pin connection to the steel 3/5/14 2014-1-013 I-Beam.

1 Snubber 1 42A Replace worn pin and weld bracket at the pin connection to the steel 3/5/14 2014-1-014 I-Beam.

1 Snubber 1-41-09 Install missing nut on snubber bracket 3/11/14 2014-1-021 1

CC-8-1003-H-1 Restore piping support Hi on 3/4," CC-8-1003 to original configuration.

3/7/14 2014-1-023 Piping Support 1

2-CV-1005-R-15, Spring can adjusted to within tolerance per CR-2014-002460.

3/11/14 N/A R-16, H-12 Component Support 1

1-H VRC-265 Support Restore supports in accordance with drawing FSK-M-0063SH0014 3/8/14 2014-1-026 and replace missing bolting material.

1 1-RC-267 Reinstallation of 2n tubing support clamp downstream of 1-RC-267 3/8/14 2014-1-025 Tubing Support per ECP-14-000232 1

1 -HVRC-1 42 Support Modify tubing support for 1 PDT1 23A downstream of 1 -RC-1 42 per 3/10/14 2014-1-028 ECP-1 4-000232.

1 1-CV-628 Replacement of studs from Boric Acid degradation 3/2/14 2014-1-015 2

Line Class Replace fastener material on a 1 HC3-1 007 piping class flanged 3/10/14 2014-1-029 HC-3-1 007 connection below 1 HVSI-31 1.

2 Line Class Modify 2" CC-7-1019 Charging Loop support #3 location box frame 3/4/14 2014-1-007 CC-7-1019 per ECP-13-000971.

2 Line Class Modification of supports #1, #3 & #10 on 2-EB-6-1 007 and #1 & #18 3/8/14 2014-1-010 EB-6 Supports on 2-EB-6-1 008 2

Snubber 1-83-69 Replace End Bracket. (CR-2014-002309) 3/9/14 2014-1-030 3

1-CV-3986 Evaluation of a hairline indication on the internal filament between the 3/14/14 2013-1-016 inside bottom surface of 11 AF--W Steam Control Valve and the drain line drilled into the valve body. This indication was evaluated using ECP-1 2-000224-CN-001 and ECP-1 2-000224.

3 Line Class Replace #14 CAC Concentric 8"x6" Reducer on HB-22-1228 line.

3/7/14 2014-1-012 H B-22-1 228 3

1 HXHVACCTCLR1 1 Restore 11 CAC Support Pedestal Column welds per ECP-1 4-3/2/14 2014-1-016 000197 3

1 HXHVACCTCLR12 Restore 12 CAC Support Pedestal Column welds per ECP 3/2/14 2014-1-017 000197 3

1HXHVACCTCLR13 Restore 13 CAC Support Pedestal Column welds per ECP 3/5/12 2014-1-018

_______________000197 3

1HXHVACCTCLR14 Restore 14 CAC Support Pedestal Column welds per ECP 3/4/14 2014-1-019

_______________000197 End of Owner's Activity Report for Refueling Outage 21 (RFO-21)

ENCLOSURE (2)

Unit 2 2013 OWNER'S ACTIVITY REPORT FOR RFO-19 INSERVICE EXAMINATIONS, REVISION 2 Calvert Cliffs Nuclear Power Plant January 8, 2016

Calvert Cliffs Nuclear Power Plant, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657 Exeto n Oc ncr a ton,.

Fourth Interval / Second Period Inservice Inspection Program and Second Interval I Second Period Containment IWEIL Program 2013 Owner's Activity Report for 2-RFO-19 Inservice Examinations Commercial Service Date: April 1, 1977 NRC Docket Number:

50-318 Document Number: CCNPP-2-OAR-004-01 9 Revision Number:

02 Prepared by:

A,,e-R.*

-S

,ite1

'},,

Angl a~s-Sit*SIProgram Owner P

Reviewed by:

I`5 t'.

Jeffrey Mcln~t~re'- I'ack'u..Si'te IS!"*Program Owner Approved by:

.t*

,]l*

Kurt Bodine - Manager Engineering Programs

Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Interval /First Period Inservice Inspection CNP2ORev.0240 SSecond Intervalf/ Second Period Containment January 5, 2016 SExeton Generation.

2013 Owner's Activity ReportPae2o6 for 2-RFO-19 Inservice Examinations Abstract This Owner's Activity Report (OAR) summarizes the results of the Calvert Cliffs Nuclear Power Plant (CCNPP),

Unit 2, American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code (B&PVC), Section Xl, Inservice Inspection examinations (ISI), performed in Refueling Outage nineteen (RFO-1 9) during the period from March 13, 2011 through March 25, 2013 of the Second Inservice Inspection Period which began on October 10, 2012 and is scheduled to end on October 9, 2016 and the Second outage of the Fourth Ten-Year Inservice Inspection Interval which began on October 10, 2009 and is scheduled to end on June 30, 2019.

This report complies with all requirements set forth by ASME B&PVC, Section Xl 2004 Edition, Article IWA-6000, and ASME Code Case N-532-4, "Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission."

In accordance with ASME Section Xl, IWB-2400, IWC-2400, IWD-2400, IWE-2400, IWF-2400, and IWL-2400, and with the exception of those examinations that are limited to components selected for examination under Examination Categories B-L-2 and B-M-2 and required only when the pump or valve is disassembled as specified in Table IWB-2500-1, IWC-2500-1, and IWD-2500-1, including those examinations which CCNPP has requested and received approval in the form of requests for relief or alternates, the required examinations in each examination category have been completed for the First outage of the Second Inspection Period of the Fourth Inspection Interval in accordance with Tables IWB-2412-1, IWC-2412-1, IWD-2412-1, IWE-2412-1, IWF-2410-1&2, and IWL-2521 -1.

Owner's Activity Reports - Form OAR-1 Owner's Activity Reports, Form OAR-i were prepared and certified upon completion of the Calvert Cliffs Nuclear Power Plant Unit 2, 2013 Refueling Outage (RFO-19) examination activity in accordance with the following inspection plans:

Fourth Inservice Inspection Program Plan Second Interval Containment Inservice Inspection Program Plan Fourth Interval Inservice Inspection Pressure Testing Program Plan In addition to the Owner's Activity Reports, Form OAR-i, the following Tables are also included:

a.

Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, which provides a listing of item(s) with flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).

b.

Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, which identifies those items containing flaws or relevant conditions that exceeded the ASME Xl acceptance criteria (IWB-3000, IWC-3000, IWD-3000, IWE-3000 and IWL-3000) or in the case of supports, IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement, or corrective measure, may not have resulted from an examination or test required by ASME Section Xl, and provides such information as Code Class, item description, description of work, date completed, and the repair replacement plan number.

Calvert Cliffs Nuclear Power Plant Unit 2 CCNPP-2-OAR-004-01 9 Fourth Interval / First Period Inservice InspectionRe.0 Ext~,.ertn,*0*OwersAcivt RpotPae f

I

.=Second Interval / Second Period Containment January 5, 2016 for 2-RF0-19 Inservice Examinations FORM OAR-i OWNER'S ACTIVITY REPORT Fourth Interval/Second Period of Inservice Inspection Program As required by the provisions of the ASME Code Case N-532-4 Report Number CCN PP-2-OAR-004-01 9 Plant Calvert Cliffs Nuclear Power Plant Unit No.

2 (if applicable)

Current Inspection Interval Current Inspection Period Commercial Service Date April 1, 1977 Refueling Outage Number RFO-1 9 Fourth Inservice Inspection Interval - October 10,2009 to June 30, 2019 (1=', 2"", 3'", 4"', other)

Second Inservice Inspection Period - October 10, 2012 to October 9, 2016 Edition and Addenda of Section Xl applicable to the Inspection Plans Date / Revision of Inspection Plans 2004 Edition, No addenda Rev. 1 Ch. 1 Dated June 4, 2013 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used:

N-460, N-532-4, N-566-2, N-61 6, N-624, N-639, N-686-1, N-71 6, N-722-1, N-729-1, N-753, N-770-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of RFO-19 conform to the requirements of Section Xl (refueling outage number)

Signed Kurt Bodine -

  • "> \\LJ-=
  • j***

Date

  • b/*.4*'=

Manager, CCNPP Nuclear Engineering Programs CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa Hartford Steam Boiler of Hartford, Connecticut and employed by (HSBCT) have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any:personal injury or property damage or a loss of any kind arising from or connected with this inspection

___________Commissions 0*

l*30'4,_.t.*

Io'1 A-, P* 1T" J(Inspecto(*Signature)

National Board, State, Province, and Endor~ements Date

Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Interval/ First Period Inservice Inspection CNP2ORev.02 40 SSecond Interval / Second Period Containment Januar 52016 SExeion Geni]eratiorn, 2013 Owner's Activity Report Page 4 of 6 for 2-RFO-19 Inservice Examinations FO RMOAR--IOWN ER'S-ACTIVITY~REPO RT Second Interval/Second Period of Containment IWE/L Inservice Inspection Program As required by the provisions of the ASME Code Case N-532-4 Report Number CvetClifsNucle-ar-Power 9ln Plant Calvert Cliffs Nuclear Power Plant Unit No.

2 Commercial Service Date April 1, 1977 Refueling Outage Number RFO-19 (if applicable)

Current Inspection Interval Current Inspection Period Second Inservice Inspection Interval - September 9, 2009 to September 9, 2018 (1°, 2, 3'", 4', other)

Second Inservice Inspection Period - September 9, 2011 to September 9, 2015 Edition and Addenda of Section Xl applicable to the Inspection Plans Date I Revision of Inspection Plans 2004 Edition, No addenda Rev. 1 Dated Feb. 6, 2014 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used:

N-532-4, N-624, N-686-1, N-739, N-753 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code, Section Xl; and © the repair/replacement activities and evaluations supporting the completion of RFO-1 9 conform to the requirements of Section Xl (refueling outage number)

Signed Kurt Bodine -

  • \\-.--
  • -----L,*,**

Date Manager, CCP Nuclear Engineering Programs CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa Hartford Steam Boiler of Hartford, Connecticut and employed by (HSBCT)________________

have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any persona* injury or property damage or a loss of any kind arising from or connected with this inspection f

)

inspecto Nignature)

National Board, Statte, Province, and Endoraeniients Date

Calvert Cliffs Nuclear Power Plant Unit 2 CCNPP-2-OAR-004-01 9 Fourth Interval / First Period Inservice InspectionRe.0 Second Interval / Second Period Containment Januar 52016 SExet0n Generation.

2013 Owner's Activity Report Page 5 of 6 for 2-RFO-19 Inservice Examinations Table 1 Items with Flaws or Relevant Condition that Require Evaluation for Continued Service As required by the provisions of the ASME Code Case N-532-4 Examination Item *D~r'too*

Dsto,,

Category NumberItmDsrpinEautoDecpin E-A E1.30 IWE Moisture Barrier Acceptance by Design Evaluation per IWE-3510.4 (ECP-1 2-000207)

E-A 1.11MC LnerAcceptance by Design Evaluation per IWE-351 0.4 E-A 1.l1MC Lner(ESR-13-000303)

FAFl1.200 Component Support Acceptance by Design Evaluation per IWF-31 12.3 F-A (ES-002)

Accepted by Responsible Engineer (RPE)

L-B L2.10 Tendon 42H28 (Evaluation per IWL-3300 and documented in CR-201 2-009456)

Tendons 42H26, 42H27, Accepted by Responsible Engineer (RPE)

L-B L2.10 4H9(Evaluation per IWL-3300 and documented in 42H29CR-2012-009438)

4, 4'

Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Interval/IFirst Period Inservice Inspection CNP2ORev

-02 401 Second Interval / Second Period Containment Januar 52016 Exeto Generationl, 2013 Owner's Activity Report Page 6 of 6 for 2-RFO-19 Inservice Examinations

_________________________________-Table-2 Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service as required by the provisions of the ASME Code Case N-532-4

... Code Date R&R Plan Class

,Item Description Description.. of Work..

Completed

.Numb~er One 2SNUB2-52-53 Replace top worn bracket 4/14/11 2011-2-014 One 2#3/4"CC9 Replace missing/broken Girard Clamp Stud 3/7/13 201 3-2-027 One 3/4"Clamp/2PDT122B Modification of tubing support 4/22/13 201 3-2-030 One 3/4"Clamp/2PDT122B Replacement of missing Girard Clamp Bolts 3/20/13 201 3-2-038 Ona25 lve00 Bolting20 Replacement of bolting due to thread damage 4/23/2013 2012-2-050 Two EB820--31Replace

/Modify Base Plate Hanger Al13-1 on 21/3 21--2 EB-8-2001-A-13-1 ~Line Class EB-8-2001 21/3 21--2 Two 2#DC1 -2002 Repair/Replace base plates on R7 Hanger 3/19/13 201 3-2-032 Three 2HXHVACCTCLR21 Restore CAC supports to design 4/5/13 2013-2-022 Three 2HXHVACCTCLR22 Restore CAC supports to design 3/27/13 201 3-2-023 Three 2HXHVACCTCLR23 Restore CAC supports to design 3/26/13 2013-2-024 Three 2HXHVACCTCLR24 Restore CAC supports to design 3/26/13 201 3-2-025 Three 2PUMPSW21 Repair volute plug on #21 SW Pump 8/6/12 201 2-2-095A CC Containment Tendons Containment tendon re-tensioned to above 95%

(4226)thepreictd frceperCR-01200938 10/17/2012 2012-2-049 (42H27) the predicted force per CR-2012-009438 CC Containment Tendons Containment tendon re-tensioned to above 95%

107/12 02-04 (42H28) the predicted force per CR-2012-009438 CC Containment Tendons Containment tendon re-tensioned to above 95%

107/12 02-04 (42H28) the predicted force per CR-2012-009438 107/12 02-04 End of Owner's Activity Report for Refueling Outage 19 (RFO-1 9)

~Exeton Generation George H. Gelirich Site Vice President Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5200 Office 717 497 3463 Mobile www.exeloncorp.com george.gellrich@exeloncorp.com January 8, 2016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Calvert Cliffs Nuclear Power Plant, Unit No. 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 Inservice Insp~ection Reports

1.

American Society of Mechanical Engineers, Boiler & Pressure Vessel Code, Section Xl, Article IWA-6000

Subject:

Reference:

Pursuant to Reference 1, please find enclosed the revised Inservice Inspection Reports for Calvert Cliffs Nuclear Power Plant Units 1 and 2.

There are no regulatory commitments contained in this letter.

Should you have questions regarding this matter, please contact Mr. Larry D. Smith at (410) 495-5219.

Respectfully, George H. Gellinch Site Vice President GHG/PSF/bjm

Enclosures:

(1) Unit 1 2014 Owner's Activity Report for RFO-21 Inservice Examinations, revision 1 (2) Unit 2 2013 Owner's Activity Report for RFO-19 Inservice Examinations, revision 2

Document Control Desk January 8, 2016 Page 2 cc:

(Without Enclosure)

NRC Project Manager, Calvert Cliffs NRC Regional Administrator, Region I NRC Resident Inspector, Calvert Cliffs S. Gray, MD-DNR

ENCLOSURE (1)

Unit 1 2014 OWNER'S ACTIVITY REPORT FOR RFO-21 INSERVICE EXAMINATIONS, REVISION 1 Calvert Cliffs Nuclear Power Plant January 8, 2016

Calvert Cliffs Nuclear Power Plant, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657 Exelton G~enerationo.

Fourth Interval I Second Period Inservice Inspection Program and Second Intervall/ Second Period Containment IWE/L Program 2014 Owner's Activity Report for RFO-21 Inservice Examinations Commercial Service Date: May 8, 1975 NRC Docket Number:

50-317 Document Number: CCNPP-1 -OAR-004-021 Revision Number:

01 Prepared by:

/1, Jeffrey 'Mclntyre - B-ackup Si teSI Program Owner Reviewed by:

  • .**?,*

m

.Lye

  • ,-C*,~?.*

e,* &.

~Angel Reyes-Cri1*

Site ISl Program Owner Reviewed by:

k(t*

Kurt Bodine - Manager Nuclear Engineering Programs

Calvert Cliffs Nuclear Power Plant Unit 1 Fouth nteva

/ irs Prio InervceInsectonCCN PP-i1-OAR-004-021 Fourh Iteral /Firt PriodInsrvie InpecionRev.

01 Second Interval / Second Period Containment January 5, 2016 SExelon Gener~tion, 2014 Owner's Activity ReportPae2o6 forPae2o6 RFO-21 Inservice Examinations Abstract________________________

This Owner's Activity Report (OAR) summarizes the results of the Calvert Cliffs Nuclear Power Plant (CCNPP),

Unit 1, American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (B&PVC), Section Xl, Inservice Inspection (ISI) examinations performed in Refueling Outage twenty one (RFO-21) during the period from April 9, 2012 through March 20, 2014 of the Second Inservice Inspection Period which began on October 10, 2012 and is scheduled to end on October 9, 2016, and the Third outage of the Fourth Ten-Year Inservice Inspection Interval which began on October 10, 2009 and is scheduled to end on June 30, 2019.

This report complies with the requirements set forth by ASME B&PVC,Section XI 2004 Edition, Article IWA-6000 as modified by ASME Code Case N-532-4, "Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission."

In accordance with ASME Section Xl, IWB-2400, IWC-2400, IWD-2400, IWE-2400, and IWF-2400, and with the exception of those examinations that are limited to components selected for examination under Examination Categories B-L-2 and B-M-2 and required only when the pump or valve is disassembled as specified in Table IWB-2500-1, IWC-2500-1, and IWD-2500-1, including those examinations which CCNPP has requested and received approval in the form of requests for relief or alternates, the required examinations in each examination category have been completed for the First outage of the Second Inspection Period of the Fourth Inspection Interval in accordance with Tables IWB-241 2-1, IWC-241 2-1, IWD-241 2-1, IWE-241 2-1 and IWF-241 0-2.

Owner's Activity Reports - Form OAR-i Owner's Activity Reports, Form OAR-i, were prepared and certified upon completion of the Calvert Cliffs Nuclear Power Plant Unit 1, 2014 Refueling Outage (RFO-21) examination activity in accordance with the following inspection plans:

Fourth Inservice Inspection Program Plan Second Interval Containment Inservice Inspection Program Plan Fourth Interval Inservice Inspection Pressure Testing Program Plan In addition to the Owner's Activity Reports, Form OAR-i, the following Tables are also included:

a.

Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, which provides a listing of item(s) with flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).

b.

Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, which identifies those items containing flaws or relevant conditions that exceeded the ASME XI acceptance criteria (IWB-3000, IWC-3000, and IWD-3000) or in the case of supports, IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement, or corrective measure, may not have resulted from an examination or test required by ASME Section Xl, and provides such information as Code Class, item description, description of work, date completed, and the repair replacement plan number.

Calvert Cliffs Nuclear Power Plant Unit 1

~~Exe[0n Generation, Faurth Interval / First Period Inservice Inspection Second Interval / Second Period Containment 2014 Owner's Activity Report for RFO-21 Inservice Examinations CCN PP-i1-OAR-004-021 Rev. 01 January 5, 2016 Page 3 of 6 FORM OAR-i OWNER'S ACTIVITY REPORT Fourth Interval/Second Period of Inservice Inspection Program As required by the provisions of the ASME Code Case N-532-4 Report Number CCNPP-1 -OAR-004-021 Plant Calvert Cliffs Nuclear Power Plant Unit No.

1 (if applicable)

Current Inspection Interval Current Inspection Period Commercial Service Date May 8, 1975 Refueling Outage Number RFO-21 Fourth Inservice Inspection Interval - October 10, 2009 to June 30, 2019 (1* 2nd 3ra, 4tr, other)

Second Inservice Inspection Period - October 10, 2012 to October 9, 2016 Edition and Addenda of Section XI applicable to the Inspection Plans Date!/ Revision of Inspection Plans______________

2004 Edition, No addenda Rev. 1 Ch. 1 Dated June 4, 2013 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used:

N-460, N-532-4, N-566-2, N-61 6, N-624, N-639, N-686-1, N-71 6. N-722-1, N-729-1, N-753, N-770-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of RFO-21 conform to the requirements of Section Xl (refueling outage number)

Signed Kurt Bodine -

i>

  • L2 Date Manager, CCNPP Nuclear Engineering Programs CERTIFICATE OF INSER VICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB Global Standards of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repair!

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal mnjLlrY or property damage or a loss of any kind arising from or connected with this inspection 4

L CommisSions j(npctrs*'atr)*'

I53"oa-TA "'t1*

A*)

  • 1*

I (Insectr's natre)National Board, State, Province, and Endor~ements Date

\\/./ '

C Calvert Cliffs Nuclear Power Plant Unit 1 Fourth Interval / First Period Inservice Inspection CNP-ORev.01 402 SSecond Interval / Second Period Containment Januar 52016 SExe~on Generation, 2014 Owner's Activity ReportPae4o6 forPae4o6 RFO-21 Inservice Examinations FORM OAR-i OWNER'S ACTIVITY REPORT Second Interval/Second Period of Containment IWEIL Inservice Inspection Program As required by the provisions of the ASME Code Case N-532-4 Report Number CCNPP-1 -OAR-004-021 Plant Calvert Cliffs Nuclear Power Plant Unit No.

1 Commercial Service Date May 8, 1975 Refueling Outage Number RFO-21 (if applicable)

Current Inspection interval Current Inspection Period Second Inservice Inspection Interval - September 9, 2009 to September 9, 2018 (1V', 2"=, 3'a, 4th, other)

Second Inservice Inspection Period - September 9, 2011 to September 9. 2015 Edition and Addenda of Section Xl applicable to the Inspection Plans Date / Revision of Inspection Plans (1o,, 2,% 3,)

2004 Edition, No addenda Rev. 1 Dated Feb. 6, 2014 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used:

N-532-4, N-624, N-686-1, N-739, N-753 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of RFO-21 conform to the requirements of Section Xl (refueling outage number)

Signed Kurt Bodine -" b*...,*

Date i.1 Manager, CCNPP Nuclear Engineering Programs CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB Global Standards of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repairl replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection A.*i CoL."'*'Ispc*Sgaur)

Commissions

,.j (\\

1i-IS*O

-JA-~I51*" A}NiI (lnpecd~Sigatue)National Board, State, Province, and Endorsementsa Date

Calvert Cliffs Nuclear Power Plant Unit 1 Fourth Interval / First Period Inservice Inspection CNP1ORev.01 402 Second Interval/ISecond Period Containment Januar 52016 SExeton Generation.

2014 Owner's Activity Report Pagear 5, of16 forPae5o6 RFO-21 Inservice Examinations Table 1 Items with Flaws or Relevant Condition that Require Evaluation for Continued Service As required by the provisions of the ASME Code Case N-532-4

,Examination Item Number Item Description Evaluation Description,

Category.

F-

l.

BComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-11B(2-CV-1005-R-17)

(Accepted 'as is' per ESR-14-000251)

Fl1BComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-A F11B(2-CV-1005-H-14)

(Accepted 'as is' per ESR-14-000251)

Component Support Acceptance by Design Evaluation per IWF-31 12.3 F-A Fl1.400 (11 iA-i1SC)

(Accepted 'as is' per Attachment 2 of ES-002)

F-l 4CComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-14C(1 1A-2SC)

(Accepted 'as is' per Attachment 2 of ES-002)

F-l 4CComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-14C(11 A-3SC)

(Accepted 'as is' per Attachment 2 of ES-002)

F-l 4CComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-14C(11lA-4SC)

(Accepted 'as is' per Attachment 2 of ES-002)

Component Support Acceptance by Design Evaluation per IWF-31 12.3 F-A F1.20A (8-CS-1205-H-5,R-3)

(Accepted 'as is' per CR-2014-001 553)

F.2BComponent Support Acceptance by Design Evaluation per IWF-31 12.3 F-A F12B(12-SC-1208-H-3)

(Accepted 'as is' per ECP-l14-000291 )

E-l.1Primary Containment Acceptance by Design Evaluation per IWE-351 0.4

-AE.1 Liner (Elevation 69'-1 18')

(Accepted 'as is' per ESR-1 4-000208)

Calvert Cliffs Nuclear Power Plant Unit 1 Fourth Interval / First Period Inservice Inspection CNP1ORev.01 402 Second Interval / Second Period Containment Januar 52016 SExeton Genlerationl, 2014 Owner's Activity Report Panagey of 206 forPae6o6 RFO-21 Inservice Examinations Table 2 Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service as required by the provisions of the ASME Code Case N-532-4 Code item Description Description of Work Date' R&R Plan Class ComPleted Number 1

Snubber 1-52-42 Replace worn pin and weld bracket at the pin connection to the steel 3/5/14 2014-1-013 I-Beam.

1 Snubber 1 42A Replace worn pin and weld bracket at the pin connection to the steel 3/5/14 2014-1-014 I-Beam.

1 Snubber 1-41-09 Install missing nut on snubber bracket 3/11/14 2014-1-021 1

CC-8-1003-H-1 Restore piping support Hi on 3/4," CC-8-1003 to original configuration.

3/7/14 2014-1-023 Piping Support 1

2-CV-1005-R-15, Spring can adjusted to within tolerance per CR-2014-002460.

3/11/14 N/A R-16, H-12 Component Support 1

1-H VRC-265 Support Restore supports in accordance with drawing FSK-M-0063SH0014 3/8/14 2014-1-026 and replace missing bolting material.

1 1-RC-267 Reinstallation of 2n tubing support clamp downstream of 1-RC-267 3/8/14 2014-1-025 Tubing Support per ECP-14-000232 1

1 -HVRC-1 42 Support Modify tubing support for 1 PDT1 23A downstream of 1 -RC-1 42 per 3/10/14 2014-1-028 ECP-1 4-000232.

1 1-CV-628 Replacement of studs from Boric Acid degradation 3/2/14 2014-1-015 2

Line Class Replace fastener material on a 1 HC3-1 007 piping class flanged 3/10/14 2014-1-029 HC-3-1 007 connection below 1 HVSI-31 1.

2 Line Class Modify 2" CC-7-1019 Charging Loop support #3 location box frame 3/4/14 2014-1-007 CC-7-1019 per ECP-13-000971.

2 Line Class Modification of supports #1, #3 & #10 on 2-EB-6-1 007 and #1 & #18 3/8/14 2014-1-010 EB-6 Supports on 2-EB-6-1 008 2

Snubber 1-83-69 Replace End Bracket. (CR-2014-002309) 3/9/14 2014-1-030 3

1-CV-3986 Evaluation of a hairline indication on the internal filament between the 3/14/14 2013-1-016 inside bottom surface of 11 AF--W Steam Control Valve and the drain line drilled into the valve body. This indication was evaluated using ECP-1 2-000224-CN-001 and ECP-1 2-000224.

3 Line Class Replace #14 CAC Concentric 8"x6" Reducer on HB-22-1228 line.

3/7/14 2014-1-012 H B-22-1 228 3

1 HXHVACCTCLR1 1 Restore 11 CAC Support Pedestal Column welds per ECP-1 4-3/2/14 2014-1-016 000197 3

1 HXHVACCTCLR12 Restore 12 CAC Support Pedestal Column welds per ECP 3/2/14 2014-1-017 000197 3

1HXHVACCTCLR13 Restore 13 CAC Support Pedestal Column welds per ECP 3/5/12 2014-1-018

_______________000197 3

1HXHVACCTCLR14 Restore 14 CAC Support Pedestal Column welds per ECP 3/4/14 2014-1-019

_______________000197 End of Owner's Activity Report for Refueling Outage 21 (RFO-21)

ENCLOSURE (2)

Unit 2 2013 OWNER'S ACTIVITY REPORT FOR RFO-19 INSERVICE EXAMINATIONS, REVISION 2 Calvert Cliffs Nuclear Power Plant January 8, 2016

Calvert Cliffs Nuclear Power Plant, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657 Exeto n Oc ncr a ton,.

Fourth Interval / Second Period Inservice Inspection Program and Second Interval I Second Period Containment IWEIL Program 2013 Owner's Activity Report for 2-RFO-19 Inservice Examinations Commercial Service Date: April 1, 1977 NRC Docket Number:

50-318 Document Number: CCNPP-2-OAR-004-01 9 Revision Number:

02 Prepared by:

A,,e-R.*

-S

,ite1

'},,

Angl a~s-Sit*SIProgram Owner P

Reviewed by:

I`5 t'.

Jeffrey Mcln~t~re'- I'ack'u..Si'te IS!"*Program Owner Approved by:

.t*

,]l*

Kurt Bodine - Manager Engineering Programs

Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Interval /First Period Inservice Inspection CNP2ORev.0240 SSecond Intervalf/ Second Period Containment January 5, 2016 SExeton Generation.

2013 Owner's Activity ReportPae2o6 for 2-RFO-19 Inservice Examinations Abstract This Owner's Activity Report (OAR) summarizes the results of the Calvert Cliffs Nuclear Power Plant (CCNPP),

Unit 2, American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code (B&PVC), Section Xl, Inservice Inspection examinations (ISI), performed in Refueling Outage nineteen (RFO-1 9) during the period from March 13, 2011 through March 25, 2013 of the Second Inservice Inspection Period which began on October 10, 2012 and is scheduled to end on October 9, 2016 and the Second outage of the Fourth Ten-Year Inservice Inspection Interval which began on October 10, 2009 and is scheduled to end on June 30, 2019.

This report complies with all requirements set forth by ASME B&PVC, Section Xl 2004 Edition, Article IWA-6000, and ASME Code Case N-532-4, "Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission."

In accordance with ASME Section Xl, IWB-2400, IWC-2400, IWD-2400, IWE-2400, IWF-2400, and IWL-2400, and with the exception of those examinations that are limited to components selected for examination under Examination Categories B-L-2 and B-M-2 and required only when the pump or valve is disassembled as specified in Table IWB-2500-1, IWC-2500-1, and IWD-2500-1, including those examinations which CCNPP has requested and received approval in the form of requests for relief or alternates, the required examinations in each examination category have been completed for the First outage of the Second Inspection Period of the Fourth Inspection Interval in accordance with Tables IWB-2412-1, IWC-2412-1, IWD-2412-1, IWE-2412-1, IWF-2410-1&2, and IWL-2521 -1.

Owner's Activity Reports - Form OAR-1 Owner's Activity Reports, Form OAR-i were prepared and certified upon completion of the Calvert Cliffs Nuclear Power Plant Unit 2, 2013 Refueling Outage (RFO-19) examination activity in accordance with the following inspection plans:

Fourth Inservice Inspection Program Plan Second Interval Containment Inservice Inspection Program Plan Fourth Interval Inservice Inspection Pressure Testing Program Plan In addition to the Owner's Activity Reports, Form OAR-i, the following Tables are also included:

a.

Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, which provides a listing of item(s) with flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).

b.

Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, which identifies those items containing flaws or relevant conditions that exceeded the ASME Xl acceptance criteria (IWB-3000, IWC-3000, IWD-3000, IWE-3000 and IWL-3000) or in the case of supports, IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement, or corrective measure, may not have resulted from an examination or test required by ASME Section Xl, and provides such information as Code Class, item description, description of work, date completed, and the repair replacement plan number.

Calvert Cliffs Nuclear Power Plant Unit 2 CCNPP-2-OAR-004-01 9 Fourth Interval / First Period Inservice InspectionRe.0 Ext~,.ertn,*0*OwersAcivt RpotPae f

I

.=Second Interval / Second Period Containment January 5, 2016 for 2-RF0-19 Inservice Examinations FORM OAR-i OWNER'S ACTIVITY REPORT Fourth Interval/Second Period of Inservice Inspection Program As required by the provisions of the ASME Code Case N-532-4 Report Number CCN PP-2-OAR-004-01 9 Plant Calvert Cliffs Nuclear Power Plant Unit No.

2 (if applicable)

Current Inspection Interval Current Inspection Period Commercial Service Date April 1, 1977 Refueling Outage Number RFO-1 9 Fourth Inservice Inspection Interval - October 10,2009 to June 30, 2019 (1=', 2"", 3'", 4"', other)

Second Inservice Inspection Period - October 10, 2012 to October 9, 2016 Edition and Addenda of Section Xl applicable to the Inspection Plans Date / Revision of Inspection Plans 2004 Edition, No addenda Rev. 1 Ch. 1 Dated June 4, 2013 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used:

N-460, N-532-4, N-566-2, N-61 6, N-624, N-639, N-686-1, N-71 6, N-722-1, N-729-1, N-753, N-770-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of RFO-19 conform to the requirements of Section Xl (refueling outage number)

Signed Kurt Bodine -

  • "> \\LJ-=
  • j***

Date

  • b/*.4*'=

Manager, CCNPP Nuclear Engineering Programs CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa Hartford Steam Boiler of Hartford, Connecticut and employed by (HSBCT) have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any:personal injury or property damage or a loss of any kind arising from or connected with this inspection

___________Commissions 0*

l*30'4,_.t.*

Io'1 A-, P* 1T" J(Inspecto(*Signature)

National Board, State, Province, and Endor~ements Date

Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Interval/ First Period Inservice Inspection CNP2ORev.02 40 SSecond Interval / Second Period Containment Januar 52016 SExeion Geni]eratiorn, 2013 Owner's Activity Report Page 4 of 6 for 2-RFO-19 Inservice Examinations FO RMOAR--IOWN ER'S-ACTIVITY~REPO RT Second Interval/Second Period of Containment IWE/L Inservice Inspection Program As required by the provisions of the ASME Code Case N-532-4 Report Number CvetClifsNucle-ar-Power 9ln Plant Calvert Cliffs Nuclear Power Plant Unit No.

2 Commercial Service Date April 1, 1977 Refueling Outage Number RFO-19 (if applicable)

Current Inspection Interval Current Inspection Period Second Inservice Inspection Interval - September 9, 2009 to September 9, 2018 (1°, 2, 3'", 4', other)

Second Inservice Inspection Period - September 9, 2011 to September 9, 2015 Edition and Addenda of Section Xl applicable to the Inspection Plans Date I Revision of Inspection Plans 2004 Edition, No addenda Rev. 1 Dated Feb. 6, 2014 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used:

N-532-4, N-624, N-686-1, N-739, N-753 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code, Section Xl; and © the repair/replacement activities and evaluations supporting the completion of RFO-1 9 conform to the requirements of Section Xl (refueling outage number)

Signed Kurt Bodine -

  • \\-.--
  • -----L,*,**

Date Manager, CCP Nuclear Engineering Programs CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa Hartford Steam Boiler of Hartford, Connecticut and employed by (HSBCT)________________

have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any persona* injury or property damage or a loss of any kind arising from or connected with this inspection f

)

inspecto Nignature)

National Board, Statte, Province, and Endoraeniients Date

Calvert Cliffs Nuclear Power Plant Unit 2 CCNPP-2-OAR-004-01 9 Fourth Interval / First Period Inservice InspectionRe.0 Second Interval / Second Period Containment Januar 52016 SExet0n Generation.

2013 Owner's Activity Report Page 5 of 6 for 2-RFO-19 Inservice Examinations Table 1 Items with Flaws or Relevant Condition that Require Evaluation for Continued Service As required by the provisions of the ASME Code Case N-532-4 Examination Item *D~r'too*

Dsto,,

Category NumberItmDsrpinEautoDecpin E-A E1.30 IWE Moisture Barrier Acceptance by Design Evaluation per IWE-3510.4 (ECP-1 2-000207)

E-A 1.11MC LnerAcceptance by Design Evaluation per IWE-351 0.4 E-A 1.l1MC Lner(ESR-13-000303)

FAFl1.200 Component Support Acceptance by Design Evaluation per IWF-31 12.3 F-A (ES-002)

Accepted by Responsible Engineer (RPE)

L-B L2.10 Tendon 42H28 (Evaluation per IWL-3300 and documented in CR-201 2-009456)

Tendons 42H26, 42H27, Accepted by Responsible Engineer (RPE)

L-B L2.10 4H9(Evaluation per IWL-3300 and documented in 42H29CR-2012-009438)

4, 4'

Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Interval/IFirst Period Inservice Inspection CNP2ORev

-02 401 Second Interval / Second Period Containment Januar 52016 Exeto Generationl, 2013 Owner's Activity Report Page 6 of 6 for 2-RFO-19 Inservice Examinations

_________________________________-Table-2 Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service as required by the provisions of the ASME Code Case N-532-4

... Code Date R&R Plan Class

,Item Description Description.. of Work..

Completed

.Numb~er One 2SNUB2-52-53 Replace top worn bracket 4/14/11 2011-2-014 One 2#3/4"CC9 Replace missing/broken Girard Clamp Stud 3/7/13 201 3-2-027 One 3/4"Clamp/2PDT122B Modification of tubing support 4/22/13 201 3-2-030 One 3/4"Clamp/2PDT122B Replacement of missing Girard Clamp Bolts 3/20/13 201 3-2-038 Ona25 lve00 Bolting20 Replacement of bolting due to thread damage 4/23/2013 2012-2-050 Two EB820--31Replace

/Modify Base Plate Hanger Al13-1 on 21/3 21--2 EB-8-2001-A-13-1 ~Line Class EB-8-2001 21/3 21--2 Two 2#DC1 -2002 Repair/Replace base plates on R7 Hanger 3/19/13 201 3-2-032 Three 2HXHVACCTCLR21 Restore CAC supports to design 4/5/13 2013-2-022 Three 2HXHVACCTCLR22 Restore CAC supports to design 3/27/13 201 3-2-023 Three 2HXHVACCTCLR23 Restore CAC supports to design 3/26/13 2013-2-024 Three 2HXHVACCTCLR24 Restore CAC supports to design 3/26/13 201 3-2-025 Three 2PUMPSW21 Repair volute plug on #21 SW Pump 8/6/12 201 2-2-095A CC Containment Tendons Containment tendon re-tensioned to above 95%

(4226)thepreictd frceperCR-01200938 10/17/2012 2012-2-049 (42H27) the predicted force per CR-2012-009438 CC Containment Tendons Containment tendon re-tensioned to above 95%

107/12 02-04 (42H28) the predicted force per CR-2012-009438 CC Containment Tendons Containment tendon re-tensioned to above 95%

107/12 02-04 (42H28) the predicted force per CR-2012-009438 107/12 02-04 End of Owner's Activity Report for Refueling Outage 19 (RFO-1 9)