Category:Letter type:NG
MONTHYEARNG-24-0004, 2023 Annual Radiological Environmental Operating Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Operating Report NG-24-0003, Submittal of 2023 Annual Radioactive Material Release Report2024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Material Release Report NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update NG-24-0002, 2023 Annual Exposure Report - Form 5s2024-03-0606 March 2024 2023 Annual Exposure Report - Form 5s NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0021, Registration of Independent Spent Fuel Installation Storage Casks2022-02-24024 February 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0014, Registration of Independent Spent Fuel Installation Storage Casks2022-02-10010 February 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0009, Registration of Independent Spent Fuel Installation Storage Casks2022-01-20020 January 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0001, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister2022-01-0606 January 2022 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister NG-21-0038, Registration of Independent Spent Fuel Installation Storage Casks2021-12-22022 December 2021 Registration of Independent Spent Fuel Installation Storage Casks NG-21-0035, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister2021-12-10010 December 2021 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister NG-21-0030, Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister2021-10-21021 October 2021 Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister NG-21-0028, Request for Approval of NextEra Energy Duane Arnold, Llc'S Decommissioning Quality Assurance Program Revision 02021-07-30030 July 2021 Request for Approval of NextEra Energy Duane Arnold, Llc'S Decommissioning Quality Assurance Program Revision 0 NG-21-0010, License Amendment Request (TSCR-192): Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2021-06-28028 June 2021 License Amendment Request (TSCR-192): Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme NG-21-0026, CFR 72.48 Report of Changes. Tests. and Experiments2021-06-16016 June 2021 CFR 72.48 Report of Changes. Tests. and Experiments NG-21-0011, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0404 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report NG-21-0009, Report of Facility Changes. Tests and Experiments. and Commitment Changes2021-04-27027 April 2021 Report of Facility Changes. Tests and Experiments. and Commitment Changes NG-21-0021, Supplement to License Amendment Request (TSCR-185): Application to Revise Operating License to Remove Cyber Security Plan Requirements2021-04-22022 April 2021 Supplement to License Amendment Request (TSCR-185): Application to Revise Operating License to Remove Cyber Security Plan Requirements NG-21-0006, 2021 Annual Decommissioning and Spent Fuel Management Funding Status Report2021-03-31031 March 2021 2021 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-21-0005, NextEra Energy Duane Arnold, LLC - Transmittal of the DAEC Defueled Safety Analysis Report Revision 02021-03-29029 March 2021 NextEra Energy Duane Arnold, LLC - Transmittal of the DAEC Defueled Safety Analysis Report Revision 0 NG-20-0094, License Amendment Request (TSCR-189): Revision to Facility License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool2021-02-19019 February 2021 License Amendment Request (TSCR-189): Revision to Facility License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool NG-21-0004, Response to Request for Additional Information Related to Post Shutdown Decommissioning Activities Report2021-02-0505 February 2021 Response to Request for Additional Information Related to Post Shutdown Decommissioning Activities Report NG-20-0078, Update to Spent Fuel Management Plan Pursuant to 10 CFR 50.54(bb)2021-01-13013 January 2021 Update to Spent Fuel Management Plan Pursuant to 10 CFR 50.54(bb) NG-20-0101, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 Pandemic2020-12-29029 December 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 Pandemic NG-20-0099, Response to Request for Additional Information Relating to License Amendment Request (TSCR-187): Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2020-12-0101 December 2020 Response to Request for Additional Information Relating to License Amendment Request (TSCR-187): Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme NG-20-0093, Supplement to License Amendment Request (TSCR-187): Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2020-10-29029 October 2020 Supplement to License Amendment Request (TSCR-187): Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme NG-20-0090, Certification of Permanent Removal of Fuel from the Reactor Vessel for Duane Arnold Energy Center2020-10-12012 October 2020 Certification of Permanent Removal of Fuel from the Reactor Vessel for Duane Arnold Energy Center NG-20-0083, Registration of Independent Spent Fuel Installation Storage Casks2020-10-12012 October 2020 Registration of Independent Spent Fuel Installation Storage Casks NG-20-0069, Response to Request for Additional Information Relating to Request for Exemption from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E2020-10-0707 October 2020 Response to Request for Additional Information Relating to Request for Exemption from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E NG-20-0082, Registration of Independent Spent Fuel Installation Storage Casks2020-09-28028 September 2020 Registration of Independent Spent Fuel Installation Storage Casks NG-20-0071, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Evaluated Exercise Requirements Due to COVID-19 Pandemic2020-09-22022 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Evaluated Exercise Requirements Due to COVID-19 Pandemic NG-20-0077, Registration of Independent Spent Fuel Installation Storage Casks2020-09-10010 September 2020 Registration of Independent Spent Fuel Installation Storage Casks 2024-05-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML22033A0802022-02-0202 February 2022 Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition NG-21-0010, License Amendment Request (TSCR-192): Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2021-06-28028 June 2021 License Amendment Request (TSCR-192): Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme ML21167A1862021-06-0303 June 2021 License Amendment Request (TSCR-191): Proposed Change to the Physical Security Plan for the Isfsl Only Condition ML21105A7452021-04-0707 April 2021 Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition NG-20-0094, License Amendment Request (TSCR-189): Revision to Facility License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool2021-02-19019 February 2021 License Amendment Request (TSCR-189): Revision to Facility License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool NG-20-0022, License Amendment Request (TSCR-185): Application to Revise Operating License to Remove Cyber Security Plan Requirements2020-05-15015 May 2020 License Amendment Request (TSCR-185): Application to Revise Operating License to Remove Cyber Security Plan Requirements NG-20-0021, Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition2020-03-11011 March 2020 Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition NG-20-0017, License Amendment Request (TSCR-184) Non-SGI Document Retransmittal2020-02-24024 February 2020 License Amendment Request (TSCR-184) Non-SGI Document Retransmittal NG-20-0011, Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition2020-02-21021 February 2020 Supplement to License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition ML20049A8222020-02-13013 February 2020 NextEra Energy Duane Arnold, LLC - License Amendment Request (TSCR-184): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition ML20044C8642020-02-0707 February 2020 License Amendment Request (TSCR-184): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition L-2019-161, License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection Program2019-09-25025 September 2019 License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection Program L-2019-157, Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition2019-09-12012 September 2019 Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition L-2019-105, License Amendment Request (TSCR-183): Application to Revise Operating License and Technical Specifications for Permanently Defueled Condition2019-06-20020 June 2019 License Amendment Request (TSCR-183): Application to Revise Operating License and Technical Specifications for Permanently Defueled Condition L-2019-050, License Amendment Request (TSCR-181): Application to Align Technical Specification Staffing and Administrative Requirements for Permanently Defueled Condition2019-04-19019 April 2019 License Amendment Request (TSCR-181): Application to Align Technical Specification Staffing and Administrative Requirements for Permanently Defueled Condition ML19101A2622019-04-0909 April 2019 License Amendment Request (TSCR-182): Proposed Changes to the Emergency Plan for Permanently Defueled Condition NG-17-0236, License Amendment Request (TSCR-179) Application to Add Technical Specification 3.2.3. Linear Heat Generation Rate.2017-12-19019 December 2017 License Amendment Request (TSCR-179) Application to Add Technical Specification 3.2.3. Linear Heat Generation Rate. NG-17-0235, Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 22017-12-15015 December 2017 Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 2 NG-17-0235, Duane Arnold Energy Center, License Amendment Request TSCR-166, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2017-12-15015 December 2017 Duane Arnold Energy Center, License Amendment Request TSCR-166, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. NG-17-0235, Attachment 2: Duane Arnold Energy Center, License Amendment Request TSCR-166, Clean Copy of the Proposed DAEC EAL Scheme2017-12-15015 December 2017 Attachment 2: Duane Arnold Energy Center, License Amendment Request TSCR-166, Clean Copy of the Proposed DAEC EAL Scheme NG-17-0235, Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 22017-12-15015 December 2017 Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 2 NG-17-0233, Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers2017-12-15015 December 2017 Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers ML17363A0692017-12-15015 December 2017 Duane Arnold Energy Center, License Amendment Request TSCR-166, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. ML17363A0712017-12-15015 December 2017 Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 2 ML17363A0722017-12-15015 December 2017 Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 2 ML17363A0742017-12-15015 December 2017 Attachment 2: Duane Arnold Energy Center, License Amendment Request TSCR-166, Clean Copy of the Proposed DAEC EAL Scheme NG-17-0127, License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating2017-09-0505 September 2017 License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating NG-17-0169, License Amendment Request TSCR-175, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2017-08-31031 August 2017 License Amendment Request TSCR-175, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors NG-17-0093, License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-06-0909 June 2017 License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control NG-17-0084, License Amendment Request (TSCR-164), Revision to Technical Specification 3.1.2, Reactivity Anomalies2017-04-20020 April 2017 License Amendment Request (TSCR-164), Revision to Technical Specification 3.1.2, Reactivity Anomalies NG-17-0037, Duane Arnold Energy Center - Submittal of License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan2017-03-31031 March 2017 Duane Arnold Energy Center - Submittal of License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan NG-17-0037, Duane Arnold Energy Center - Evaluation of Proposed Amendment for License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan2017-03-31031 March 2017 Duane Arnold Energy Center - Evaluation of Proposed Amendment for License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan ML17102B1842017-03-31031 March 2017 Duane Arnold Energy Center - Evaluation of Proposed Amendment for License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan ML17102B1832017-03-31031 March 2017 Duane Arnold Energy Center - Submittal of License Amendment Request (TSCR-165) for Revision to Emergency Planning Zone in the Duane Arnold Energy Center Emergency Plan NG-17-0069, License Amendment Request (TSCR-169), Revision to Technical Specification Table 3.3.2.1-1, Control Rod Block Instrumentation2017-03-24024 March 2017 License Amendment Request (TSCR-169), Revision to Technical Specification Table 3.3.2.1-1, Control Rod Block Instrumentation NG-17-0037, Kld TR-910, Duane Arnold Energy Center Development of Evacuation Time Estimates for Revised EPZ Boundary (in Support of License Amendment Request (TSCR-165))2017-03-0909 March 2017 Kld TR-910, Duane Arnold Energy Center Development of Evacuation Time Estimates for Revised EPZ Boundary (in Support of License Amendment Request (TSCR-165)) NG-16-0102, License Amendment Request (TSCR-161) to Revise Technical Specifications 2.1.1.2 Safety Limit Minimum Critical Power Ratio, and to Remove an Outdated Historical Footnote from Table 3.3.5.1-12016-05-18018 May 2016 License Amendment Request (TSCR-161) to Revise Technical Specifications 2.1.1.2 Safety Limit Minimum Critical Power Ratio, and to Remove an Outdated Historical Footnote from Table 3.3.5.1-1 ML16145A1832016-04-30030 April 2016 Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR Cycle 26 NG-16-0052, License Amendment Request (TSCR-159) to Revise Technical Specifications Fuel Storage Requirements2016-03-15015 March 2016 License Amendment Request (TSCR-159) to Revise Technical Specifications Fuel Storage Requirements NG-15-0284, License Amendment Request (TSCR-1 30) for Amendment to Technical Specifications Section 5.5.6 for the Inservice Testing Program2015-10-14014 October 2015 License Amendment Request (TSCR-1 30) for Amendment to Technical Specifications Section 5.5.6 for the Inservice Testing Program NG-15-0234, License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency2015-08-18018 August 2015 License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency NG-15-0048, License Amendment Request (TSCR-153) to Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits2015-08-0606 August 2015 License Amendment Request (TSCR-153) to Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits NG-15-0230, License Amendment Request (TSCR-1 54) to Correct Examples in Technical Specifications Section 1.4, Frequency.2015-07-24024 July 2015 License Amendment Request (TSCR-1 54) to Correct Examples in Technical Specifications Section 1.4, Frequency. NG-14-0291, License Amendment Request (TSCR-1 51) for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2015-01-26026 January 2015 License Amendment Request (TSCR-1 51) for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control NG-14-0150, License Amendment Request (TSCR-147): Application to Revise Cyber Security Plan Milestone 8 Completion Date2014-08-28028 August 2014 License Amendment Request (TSCR-147): Application to Revise Cyber Security Plan Milestone 8 Completion Date NG-14-0143, License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Proces2014-06-23023 June 2014 License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NG-13-0297, License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42013-08-29029 August 2013 License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 NG-13-0110, License Amendment Request (TSCR-140): Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, Section Affected: 1.12013-03-14014 March 2013 License Amendment Request (TSCR-140): Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, Section Affected: 1.1 NG-12-0483, License Amendment Request (TSCR-142): Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hrs Per Month, Using Consolidated Line Item Improvement Process2012-12-21021 December 2012 License Amendment Request (TSCR-142): Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hrs Per Month, Using Consolidated Line Item Improvement Process NG-12-0434, Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.122012-11-13013 November 2012 Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.12 2022-02-02
[Table view] Category:Technical Specification
MONTHYEARL-2019-157, Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition2019-09-12012 September 2019 Supplement to License Amendment Request (TSCR-183): Application to Revise Technical Specifications for the Permanently Defueled Condition NG-17-0093, License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-06-0909 June 2017 License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control NG-17-0086, Transmittal of Revision 24 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases2017-04-28028 April 2017 Transmittal of Revision 24 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases ML16145A1832016-04-30030 April 2016 Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR Cycle 26 NG-15-0315, Technical Specification 5.6.6 Post Accident Monitoring (PAM) Report, October 20152015-10-22022 October 2015 Technical Specification 5.6.6 Post Accident Monitoring (PAM) Report, October 2015 ML15253A3102015-07-30030 July 2015 License Amendment Request (TSCR-144) to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report NG-15-0230, License Amendment Request (TSCR-1 54) to Correct Examples in Technical Specifications Section 1.4, Frequency.2015-07-24024 July 2015 License Amendment Request (TSCR-1 54) to Correct Examples in Technical Specifications Section 1.4, Frequency. NG-14-0291, License Amendment Request (TSCR-1 51) for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2015-01-26026 January 2015 License Amendment Request (TSCR-1 51) for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control NG-13-0297, License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42013-08-29029 August 2013 License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 ML13004A1132012-12-0404 December 2012 Technical Update Instructions Specifications ML13004A1142012-11-19019 November 2012 Technical Update Instructions Specifications ML12283A3442012-10-0202 October 2012 Technical Update Instructions Specifications ML12277A1682012-09-21021 September 2012 Amendment No. 282 (Tscr No. 129) Revising Surveillance Requirements for Srvs, ADS, and LLS Values to No Longer Require Testing with Live Steam During Plant Startup NG-12-0028, License Amendment Request (TSCR-132): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42012-03-22022 March 2012 License Amendment Request (TSCR-132): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 NG-12-0034, Supplemental Information to an Application to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2012-01-19019 January 2012 Supplemental Information to an Application to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program NG-11-0371, License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.52011-09-29029 September 2011 License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.5 NG-11-0299, Response to Request for Additional Information Related to an Amendment to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2011-08-15015 August 2011 Response to Request for Additional Information Related to an Amendment to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program NG-11-0037, License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3)2011-02-23023 February 2011 License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3) NG-10-0372, Application for Technical Specification Change to Add LCO 3.0.9 on the Unavailability of Barriers (TSTF-427) Using the Consolidated Line Item Improvement Process (TSCR-122)2010-08-12012 August 2010 Application for Technical Specification Change to Add LCO 3.0.9 on the Unavailability of Barriers (TSTF-427) Using the Consolidated Line Item Improvement Process (TSCR-122) NG-09-0047, Technical Specification Change Request (Tscr - 107) - License Amendment Request for Adoption of TSTF-51 1, Rev. 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26.2009-01-30030 January 2009 Technical Specification Change Request (Tscr - 107) - License Amendment Request for Adoption of TSTF-51 1, Rev. 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26. NG-08-0093, Response to Request for Additional Information Related to the Relief Request for Seal Weld Procedure Qualification2008-02-19019 February 2008 Response to Request for Additional Information Related to the Relief Request for Seal Weld Procedure Qualification NG-07-0729, Technical Specification Change Request, TSCR-094, Application for TS Improvement to Adopt TSTF-343, Revision 1,Affected Technical Specification: Section 5.5.122007-11-14014 November 2007 Technical Specification Change Request, TSCR-094, Application for TS Improvement to Adopt TSTF-343, Revision 1,Affected Technical Specification: Section 5.5.12 NG-07-0536, Technical Specification Change Request (TSCR-068): Add an Action Statement for Two Inoperable Control Building Chiller Subsystems to Technical Specifications Using Consolidated Line Item Improvement Process TSTF-477, Rev, 32007-07-20020 July 2007 Technical Specification Change Request (TSCR-068): Add an Action Statement for Two Inoperable Control Building Chiller Subsystems to Technical Specifications Using Consolidated Line Item Improvement Process TSTF-477, Rev, 3 NG-06-0338, Technical Specification Request: Adoption of TSTF-372, Rev. 4, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using Consolidated Line Item Improvement Process. Affected TS: Section 3.02006-04-28028 April 2006 Technical Specification Request: Adoption of TSTF-372, Rev. 4, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using Consolidated Line Item Improvement Process. Affected TS: Section 3.0 NG-05-0467, Technical Specification Change Request (TSCR-076): Relaxation of Emergency Diesel Generator Testing Criterion.2005-09-16016 September 2005 Technical Specification Change Request (TSCR-076): Relaxation of Emergency Diesel Generator Testing Criterion. ML0404204242004-01-30030 January 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process NG-02-0232, Technical Specification Change Request (TSCR-055): Deferral of Type a Containment Integrated Leak Rate Test (ILRT)2002-03-29029 March 2002 Technical Specification Change Request (TSCR-055): Deferral of Type a Containment Integrated Leak Rate Test (ILRT) 2019-09-12
[Table view] Category:Bases Change
MONTHYEARNG-17-0086, Transmittal of Revision 24 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases2017-04-28028 April 2017 Transmittal of Revision 24 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases ML16145A1832016-04-30030 April 2016 Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR Cycle 26 NG-15-0315, Technical Specification 5.6.6 Post Accident Monitoring (PAM) Report, October 20152015-10-22022 October 2015 Technical Specification 5.6.6 Post Accident Monitoring (PAM) Report, October 2015 ML15253A3102015-07-30030 July 2015 License Amendment Request (TSCR-144) to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report NG-15-0230, License Amendment Request (TSCR-1 54) to Correct Examples in Technical Specifications Section 1.4, Frequency.2015-07-24024 July 2015 License Amendment Request (TSCR-1 54) to Correct Examples in Technical Specifications Section 1.4, Frequency. NG-13-0297, License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42013-08-29029 August 2013 License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 NG-12-0028, License Amendment Request (TSCR-132): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42012-03-22022 March 2012 License Amendment Request (TSCR-132): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 NG-11-0371, License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.52011-09-29029 September 2011 License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.5 NG-11-0299, Response to Request for Additional Information Related to an Amendment to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2011-08-15015 August 2011 Response to Request for Additional Information Related to an Amendment to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program NG-11-0037, License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3)2011-02-23023 February 2011 License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3) NG-10-0372, Application for Technical Specification Change to Add LCO 3.0.9 on the Unavailability of Barriers (TSTF-427) Using the Consolidated Line Item Improvement Process (TSCR-122)2010-08-12012 August 2010 Application for Technical Specification Change to Add LCO 3.0.9 on the Unavailability of Barriers (TSTF-427) Using the Consolidated Line Item Improvement Process (TSCR-122) NG-09-0047, Technical Specification Change Request (Tscr - 107) - License Amendment Request for Adoption of TSTF-51 1, Rev. 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26.2009-01-30030 January 2009 Technical Specification Change Request (Tscr - 107) - License Amendment Request for Adoption of TSTF-51 1, Rev. 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26. NG-08-0093, Response to Request for Additional Information Related to the Relief Request for Seal Weld Procedure Qualification2008-02-19019 February 2008 Response to Request for Additional Information Related to the Relief Request for Seal Weld Procedure Qualification NG-07-0729, Technical Specification Change Request, TSCR-094, Application for TS Improvement to Adopt TSTF-343, Revision 1,Affected Technical Specification: Section 5.5.122007-11-14014 November 2007 Technical Specification Change Request, TSCR-094, Application for TS Improvement to Adopt TSTF-343, Revision 1,Affected Technical Specification: Section 5.5.12 NG-06-0338, Technical Specification Request: Adoption of TSTF-372, Rev. 4, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using Consolidated Line Item Improvement Process. Affected TS: Section 3.02006-04-28028 April 2006 Technical Specification Request: Adoption of TSTF-372, Rev. 4, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using Consolidated Line Item Improvement Process. Affected TS: Section 3.0 NG-05-0467, Technical Specification Change Request (TSCR-076): Relaxation of Emergency Diesel Generator Testing Criterion.2005-09-16016 September 2005 Technical Specification Change Request (TSCR-076): Relaxation of Emergency Diesel Generator Testing Criterion. NG-02-0232, Technical Specification Change Request (TSCR-055): Deferral of Type a Containment Integrated Leak Rate Test (ILRT)2002-03-29029 March 2002 Technical Specification Change Request (TSCR-055): Deferral of Type a Containment Integrated Leak Rate Test (ILRT) 2017-04-28
[Table view] Category:Technical Specifications
MONTHYEARML21067A6422021-05-13013 May 2021 Cyber Security License Amendment Approval ML19310C2042020-01-0202 January 2020 Issuance of Amendment No. 309 to Align Technical Specifications Staffing and Administrative Requirements NG-18-0041, Correction of Error in Final Technical Specification Page 1.1-3 for License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-03-28028 March 2018 Correction of Error in Final Technical Specification Page 1.1-3 for License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control NG-17-0233, Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers2017-12-15015 December 2017 Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers ML15310A0822015-12-22022 December 2015 Issuance of Amendment to Adopt Technical Specifications Task Force (TSTF)-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML15169A2612015-08-18018 August 2015 Issuance of Amendment Concerning Extension of Cyber Security Plan Milestone 8 Completion Date ML15014A2002015-02-10010 February 2015 Issuance of Amendment to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523 Generic Letter 2008-01, Managing Gas Accumulation (Tac No. MF4358) NG-14-0143, License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Proces2014-06-23023 June 2014 License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NG-13-0297, License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42013-08-29029 August 2013 License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 NG-12-0434, Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.122012-11-13013 November 2012 Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.12 NG-12-0256, Response to Request for Additional Information (RAI Regarding License Amendment Request (TSCR-135): Application for One-Time Technical Specification Change Regarding Core Spray Operability During Shutdown2012-06-27027 June 2012 Response to Request for Additional Information (RAI Regarding License Amendment Request (TSCR-135): Application for One-Time Technical Specification Change Regarding Core Spray Operability During Shutdown ML12107A1532012-04-13013 April 2012 NRR E-mail Capture - ME8251 - Duane Arnold - Preparations for Potential Bravo Diesel Generator LCO Extension TS 3.8.1 NG-12-0028, License Amendment Request (TSCR-132): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42012-03-22022 March 2012 License Amendment Request (TSCR-132): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 ML1207402022012-03-21021 March 2012 Correction to Amendment No. 280 Regarding Adoption of Technical Specifications Task Force Traveler (TSTF-425) to Relocate Specific Surveillance Frequencies to a Licensee-Controlled Program NG-12-0054, Supplement to an Application to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2012-02-0303 February 2012 Supplement to an Application to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program NG-11-0371, License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.52011-09-29029 September 2011 License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.5 NG-11-0299, Response to Request for Additional Information Related to an Amendment to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2011-08-15015 August 2011 Response to Request for Additional Information Related to an Amendment to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program NG-11-0037, License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3)2011-02-23023 February 2011 License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3) ML0530503092010-12-16016 December 2010 Current Facility Operating License DPR-49, Tech Specs, Revised 03/17/2018 ML1029305242010-12-16016 December 2010 Issuance of Renewed Facility Operating License No. DPR-49 for Duane Arnold Energy NG-09-0119, Request for Exemption from Certain Requirements of 10 CFR Part 50, Appendix J and Associated Changes to Technical Specifications for Main Steamline Isolation Valve Local Leakage Rate Testing (TSCR-096) Affected Technical Specification...2009-03-0404 March 2009 Request for Exemption from Certain Requirements of 10 CFR Part 50, Appendix J and Associated Changes to Technical Specifications for Main Steamline Isolation Valve Local Leakage Rate Testing (TSCR-096) Affected Technical Specification... ML0822601352008-09-0909 September 2008 Technical Specifications, Issuance of Amendment Regarding License Amendment Request to Remove the Emergency Diesel Generator Surveillance Requirement for Preplanned Preventive Maintenance and Testing ML0817805562008-06-24024 June 2008 Tech Spec Pages for Amendment 269 Adoption of Changes to TSTF-448, Revision 3, Control Room Habitability. NG-08-0312, Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications . .2008-05-0808 May 2008 Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications . . ML0808103592008-03-20020 March 2008 Technical Specifications, Amendment to Improve the Ranked Position Withdrawal Sequence Control Rod Insertion Process NG-07-0571, Application for Technical Specification Improvement to Adopt TSTF-476, Revision 1, Improved Banked Position Withdrawal Sequence (BPWS) Control Rod Insertion Process (NEDO-33091).2007-09-14014 September 2007 Application for Technical Specification Improvement to Adopt TSTF-476, Revision 1, Improved Banked Position Withdrawal Sequence (BPWS) Control Rod Insertion Process (NEDO-33091). NG-07-0493, Tscr: Consolidated Line Item Improvement, Adoption of Changes to STS Under TSTF-448, Revision 3 Regarding Control Room Envelopes Habitability2007-06-29029 June 2007 Tscr: Consolidated Line Item Improvement, Adoption of Changes to STS Under TSTF-448, Revision 3 Regarding Control Room Envelopes Habitability ML0717901682007-06-28028 June 2007 Tech Spec Pages for Amendment 265 Regarding Technical Specification Change Related to the Revised Rule for Combustible Gas Control ML0703804842007-02-0505 February 2007 Technical Specification, System Leakage and Hydrostatic Testing Operation ML0635405782006-12-14014 December 2006 Tech Spec Pages for Amendment 263 Regarding Inoperability of Snubbers ML0632500392006-11-15015 November 2006 Technical Specifications, Revises TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation, to Eliminate the Main Steamline Radiation Monitor Trip Function NG-06-0472, Technical Specification Change Request (TSCR-083): Adoption of TSTF-478, Rev. 0, 'Bwr Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Affected Tech Specs: Section 3.6.3.1 and 3.6.3.22006-07-17017 July 2006 Technical Specification Change Request (TSCR-083): Adoption of TSTF-478, Rev. 0, 'Bwr Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Affected Tech Specs: Section 3.6.3.1 and 3.6.3.2 NG-06-0250, Technical Specification Change Request (TSCR-078): Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities, Affected Technical Specifications: Section 3.10.12006-03-0101 March 2006 Technical Specification Change Request (TSCR-078): Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities, Affected Technical Specifications: Section 3.10.1 ML0627102722006-01-27027 January 2006 Technical Specifications, Transfer of License to FPL Energy Duane Arnold, LLC ML0603201602006-01-27027 January 2006 Appendix B - Additional Conditions Operating License No. DPR-49 ML0517404312005-06-24024 June 2005 (TS) - Correction to Amendment No. 258 Dated May 12, 2005 ML0517503432005-06-23023 June 2005 Technical Specifications, Revised Action for Scram Discharge Volume Vent and Drain Values ML0513301812005-05-12012 May 2005 Technical Specifications, Issuance of Amendment to Revise the Technical Specifications by Adopting TSTF Nos. 273, 284, and 299 ML0503401522005-01-31031 January 2005 Technical Specifications, Deletion Requirements for Submittal of Occupational Radiation and Monthly Operating Reports ML0501200762005-01-10010 January 2005 TS Pages for Amendment 255 Regarding Technical Specifications Adopt TSTF-359, Increased Flexibility in Mode Restraints NG-04-0689, Application for Technical Specification Improvement to Revise the Required Action within TS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process2004-10-29029 October 2004 Application for Technical Specification Improvement to Revise the Required Action within TS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process ML0324004962003-08-25025 August 2003 Technical Specification Page, Updating Reactor Coolant System Pressure and Temperature Limit Curves (TS Figure 3.4.9-1) and Extends Applicability to 32 Effective full-power Years ML0314100482003-05-16016 May 2003 License Amendment 251, License Page 4a, Pertaining to Reactor Building Crane and single-failure Proof NG-03-0304, Revision of Technical Specification Change Request (TSCR-059A): Update to Reactor Coolant System Pressure and Temperature Limit Curves.2003-05-0202 May 2003 Revision of Technical Specification Change Request (TSCR-059A): Update to Reactor Coolant System Pressure and Temperature Limit Curves. NG-03-0332, 2002 Annual Radioactive Materials Release Report2003-04-30030 April 2003 2002 Annual Radioactive Materials Release Report ML0308505872003-03-21021 March 2003 TS Page for Amendment No. 249 ML0229501072002-10-28028 October 2002 Correction to Issuance of Amendment No. 248, TAC MB4269 ML0227703442002-10-0202 October 2002 Tech Spec for Amendment No. 248, Organization 5.2 for Duane Arnold ML0227703312002-10-0101 October 2002 Technical Specifications, Extends On-line Battery Replacement Time ML0210800482002-05-30030 May 2002 License Amendment No. 246, Issuance of Amendment Missed Surveillance, Consolidated Line Item Improvement 2021-05-13
[Table view] |
Text
NEXTera M ENERGV~
~ DUANE ARNOLD March 22, 2012 NG-12-0028 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket No. 50-331 Renewed Op. License No. DPR-49 License Amendment Request (TSCR-132): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 Pursuant to 10 CFR 50.90, NextEra Energy Duane Arnold, LLC (hereafter NextEra Energy Duane Arnold) hereby requests revision to the Technical Specifications (TS) for the Duane Arnold Energy Center (DAEC).
The proposed amendment would revise the DAEC TS by modifying existing Surveillance Requirements (SRs) regarding the battery terminal and charger voltages and amperage provided in SR 3.8.4.1 and SR 3.8.4.6.
Attachment 1 provides a description of the proposed change. Attachment 2 provides the existing TS pages marked up to show the proposed changes. Attachment 3 provides the new typed TS pages showing the proposed changes. Attachment 4 provides the proposed TS Bases changes for information only.
NextEra Energy Duane Arnold requests NRC review and approval of the proposed license amendment by March 22, 2013. NextEra Energy Duane Arnold is requesting a 60 day implementation period to implement this license amendment.
This application has been reviewed by the DAEC Onsite Review Group. A copy of this submittal, along with the 10 CFR 50.92 evaluation of "No Significant Hazards Consideration," is being forwarded to our appointed state official pursuant to 10 CFR 50.91.
NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324
Document Control Desk NG-12-0028 March 22, 2012 Page 2 of 2 This letter makes no new commitments or changes to any existing commitments.
If you have any questions or require additional information, please contact Steve Catron at 319-851-7234.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on March 22, 2012.
Peter lis Vice P esident, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Attachments: 1. Description and Assessment
- 2. Proposed Technical Specification Changes (Mark-ups)
- 3. Proposed Technical Specification Changes (Clean, typed)
- 4. Proposed Technical Specification Bases Changes (Mark-ups, for information only) cc: M. Rasmusson (State of Iowa)
Attachment 1 to NG-12-0028 Page 1 of 11 TSCR-132: Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.
8.4 DESCRIPTION
AND ASSESSMENT 1.0
SUMMARY
DESCRIPTION 2.0 DETAILED DESCRIPTION
3.0 TECHNICAL EVALUATION
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements 4.2 Precedent 4.3 No Significant Hazards Consideration 4.4 Conclusions
5.0 ENVIRONMENTAL CONSIDERATION
Attachment 1 to NG-12-0028 Page 2 of 11 1.0
SUMMARY
DESCRIPTION The proposed amendment would modify Technical Specifications (TS) by revising the Duane Arnold Energy Center (DAEC) TS by modifying existing Surveillance Requirements (SRs) regarding the battery terminal and charger voltages and amperage provided in SR 3.8.4.1 and SR 3.8.4.6.
The proposed amendment modifies SR 3.8.4.1 to verify battery terminal voltage is 130.5 V (instead of the current value of 126 V) on float charge for the 125 VDC batteries. The proposed amendment also modifies SR 3.8.4.6 to verify each required battery charger supplies 293 amps at 132.5 V (instead of the current value of 300 amps at 129 V) for the 125 VDC system.
NextEra Energy Duane Arnold requests NRC review and approval of the proposed license amendment by March 22, 2013.
2.0 DETAILED DESCRIPTION The proposed amendment modifies SR 3.8.4.1 to verify battery terminal voltage is 130.5 V (instead of the current value of 126 V) on float charge for the 125 VDC batteries. The proposed amendment also modifies SR 3.8.4.6 to verify each required battery charger supplies 293 amps at 132.5 V (instead of the current value of 300 amps at 129 V) for the 125 VDC system.
TS Bases associated with these Surveillance Requirements will be revised to describe revised voltage limits. Revised Bases pages are attached for information only and do not require NRC approval. The final TS Bases pages will be submitted with a future update in accordance with TS 5.5.10, "Technical Specifications (TS) Bases Control Program." It should be noted that Bases pages B 3.8-46 and B 3.8.49 have no changes associated with this amendment request, but are included for clarity.
A Site Engineering Change (EC) proposes to add two additional cells to each of the existing DAEC 125 VDC Safety Related Station Batteries (1D1 & 1D2). The existing DAEC 125 VDC Electrical Power Supply calculation indicates that for the present 58 Cell batteries, there is an insufficient voltage to allow a single cell to be taken out of service on either battery and still maintain the battery operable.
Adding two cells will provide that margin.
However, to maintain the batteries with 60 cells within their optimum per cell voltage range it has been determined that the charging voltages need to be raised, which require changes to DAEC Technical Specifications (TS) SRs 3.8.4.1 and 3.8.4.6.
Attachment 1 to NG-12-0028 Page 3 of 11 It is proposed to revise SR 3.8.4.1 to state:
Verify battery terminal voltage is 130.5 V on float charge for the 125 VDC battery and 252 V for the 250 VDC battery.
It is proposed to revise SR 3.8.4.6 to state:
Verify each required battery charger supplies 293 amps at 132.5 V for the 125 VDC subsystem and 200 amps at 258 V for the 250 VDC subsystem.
3.0 TECHNICAL EVALUATION
3.1 System Description
A Site EC proposes to add two additional cells to each of the existing DAEC 125 VDC Safety Related Station Batteries (1D1 & 1D2). The existing DAEC 125 VDC Electrical Power Supply calculation indicates that for the present 58 Cell batteries, there is an insufficient voltage to allow a single cell to be taken out of service on either battery and still maintain the battery operable. Adding two cells will provide that margin.
Two separate 125 V plant batteries are furnished, each with its own static-type battery charger, circuit breakers, and bus. One spare battery charger is provided that can be connected to either of the two batteries for servicing and as a backup to the normal power supply charger.
Each battery (currently with a minimum of 58 cells for the 125 VDC batteries) has adequate storage capacity to carry the control and essential instrumentation power continuously for approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and the emergency motor loads for their required length of time.
3.2 Operating Experience A Site EC proposes to add two additional cells to each of the existing DAEC 125 VDC Safety Related Station Batteries (1D1 & 1D2). The existing DAEC 125 VDC Electrical Power Supply calculation indicates that for the present 58 Cell batteries, there is an insufficient voltage to allow a single cell to be taken out of service on either battery and still maintain the battery operable. Adding two cells will provide that margin.
Attachment 1 to NG-12-0028 Page 4 of 11 By adding two cells, the battery voltage margin will be improved and a single cell will be able to be taken out of service, leaving 59 cells, without declaring the battery inoperable. Per the calculation and 10 CFR 50.59 screening performed for the EC, the batteries themselves as well as the equipment that supply power to or receive power from the 125 VDC batteries will remain within their design requirements after the new cells are added.
During normal operation, the DC loads are powered from the battery chargers with the batteries floating on the system, acting as a voltage regulator. If a battery is disconnected from its distribution bus and only a charger is supplying bus voltage, the associated Distribution System shall be considered inoperable, as it cannot supply the peak power required for some event scenarios. In case of loss of power to any battery charger, the DC loads are automatically powered from the battery until the redundant charger or swing charger is placed in service by operator action.
3.3 Technical Evaluation SR 3.8.4.1:
Technical Specification Surveillance Requirement SR 3.8.4.1 presently requires that the battery terminal voltage be 126 V in float charge for the 125 VDC Battery (1D1 and 1D2). The TS Bases indicate that this voltage is based on the nominal design voltage of the battery. Exactly how the nominal design voltage of the battery is determined is not explained further in the TS Bases.
The actual minimum design voltage for the DAEC battery needs to be based on the manufacturers recommendations of the voltage which will allow for optimum service from the battery.
The DAECs existing battery cells were manufactured by C&D Charter Power System. They are type LCR-17 (Lead Calcium Cells - 17 Plates per Cell) with a Specific Gravity of 1.215. Per the C&D Instruction Manual (Publication Number 12-800, Dated 1994), the recommended average charge voltage per cell (Vpc) should be as follows:
Minimum Float = 2.17 Vpc Nominal Float = 2.20-2.25 Vpc Minimum Equalize = 2.13 Vpc Nominal Equalize = 2.33-2.38 Vpc The Float Voltage is the voltage that the batteries are normally charged to and the Equalize Voltage is the voltage used for short periods of time to charge or recharge the batteries after they have been used/discharged. The new LRC-17
Attachment 1 to NG-12-0028 Page 5 of 11 cells are identical to the existing cells and have the same recommended nominal voltage values as above (with the exception that the minimum equalize voltage has been improved to 2.12 Vpc), as documented on the manufacturers current Instruction Manuals (Publication Number RS-1476, Section 12-800, Dated 2003
& 2010).
Thus, per the manufacturer, the battery cells should be maintained 2.17 Vpc for long term charging and at 2.20-2.25 Vpc for long term use.
Thus, while NextEra Energy Duane Arnold should base its nominal battery voltage value on the manufacturers nominal recommendation, NextEra Energy Duane Arnolds SR requirement should be based on the manufacturers minimum float value. Float voltages below the minimum float could potentially mean that the battery would operate outside of its optimum performance range, upon which the various manufacturer battery analyses and DAEC 125 VDC System calculations are based. The minimum technical specification value should be based on 2.17 Vpc.
Existing SR 3.8.4.1:
For the existing 58 Cell batteries. the 2.17 Vpc equates to a total battery voltage of 125.86 V (58 x 2.17). Since the instrumentation used to verify this voltage is accurate to at least 0.1 V, at least that much voltage should be added to the requirement, resulting in 125.96 V. Rounding the voltage up from 125.96 results in a required voltage of 126 V. The existing Surveillance Requirement for the battery terminal voltage is 126 V on float charge for the 125 VDC battery.
Proposed SR 3.8.4.1:
For the new 60 Cell batteries, the 2.17 Vpc equates to a total battery voltage of 130.2 V (60 x 2.17). Since the instrumentation used to verify this voltage is accurate to at least 0.1 V, at least that much voltage should be added to the requirement, resulting in 130.3 V. Rounding up to the nearest 0.5 volts results in a required voltage of 130.5 V.
The 250 VDC Battery is not impacted by the EC and the portion of the surveillance requirement dealing with it is unaffected.
SR 3.8.4.6:
Technical Specification Surveillance Requirement SR 3.8.4.6 presently requires that the battery charger testing verify each required battery charger supplies 300 amps at 129 V for each 125 VDC subsystem. The bases states that the requirements are based on the design capacity of the chargers.
Attachment 1 to NG-12-0028 Page 6 of 11 The nominal design capacity output ratings for the chargers are: 300 amps; 130 V; 39,000 Watts per the Charger Instruction Manual, Product Specification A9186200018E.
As indicated in the discussion for SR 3.8.4.1 above, the manufacturers recommended nominal float for a battery is 2.20-2.25 Vpc. For the surveillance requirement to demonstrate that the chargers can supply the electrical output for which they are designed and required, it needs to show that they can provide the design capacity current at the nominal voltage that the chargers are normally set to, which is the float voltage. Under high current demand applications, the chargers are designed to automatically lower the output current to the maximum current that will not overburden the chargers.
Existing SR 3.8.4.6:
For the existing 58 Cell batteries, the 2.20-2.25 Vpc recommendation equates to a total battery voltage of 127.6-130.5 V (58 x 2.20-2.25). NextEra Energy Duane Arnold chose to set the plant requirement at 129.0-130.5 V which is where the plant maintenance procedures set and test the charger float voltage. In addition, for this design the nominal battery voltage is considered to be 130 V. Thus the charger design capacity for the demand becomes 300 amps (39000 W ÷ 130 V =
300 A). The existing Surveillance Requirement is to verify each required battery charger supplies 300 amps at 129 V for each 125 VDC subsystem.
Proposed SR 3.8.4.6:
For the proposed 60 Cell batteries, the 2.20-2.25 Vpc recommendation equates to a total battery voltage of 132.0-135.0 V (60 x 2.20-2.25). NextEra Energy Duane Arnold plans to set the plant requirement (which is where the plant maintenance procedures set and test the charger float voltage) to 132.5-133.5V for a nominal voltage of 133 V. This range will minimize the voltage increase on the battery system while still providing a 0.5 V margin between the minimum plant required voltage (132.5 V) and the minimum vendor recommended voltage (132.0 V). Thus the charger design capacity for the 60 Cell battery becomes 293 amps (39000 W ÷ 133 V = 293 A).
The 250 VDC Battery is not impacted by the EC and the portion of the surveillance requirement dealing with it is unaffected.
Attachment 1 to NG-12-0028 Page 7 of 11
==
Conclusions:==
A calculation was performed to evaluate the impacts on the current system described in the calculation of record for adding the two additional cells to each 125 VDC Battery on the Duane Arnold Safety Related 125VDC electrical distribution system during worst case design conditions.
Analyses include the following:
Load flow analyses were performed for the DC system to determine the bus voltages for the most limiting design basis conditions.
Voltage drop calculations were performed using the ETAP Control System Diagrams (CSD) module to determine the voltages for selected safety related components. These calculations are used to determine the minimum volt/cell value used to size the battery.
Battery sizing calculations were performed to verify adequate battery capacity exists for the most limiting design basis conditions. Sizing was performed using the most conservative battery temperature and the highest aging factor value for each scenario that still results in positive margin remaining for the battery, up to a maximum of 125%. The battery will be sized to the minimum required battery terminal voltage determined as part of the voltage drop section described above. The battery sizing will be evaluated with 60 cells.
Short circuit analyses were performed for the worst case scenarios. The available short circuit currents are compared to the protective device settings to ensure the short circuit ratings of buses and protective devices are not exceeded by the available fault currents.
Selective coordination was evaluated between the various breakers and fuses on the main DC buses and distribution panels. This analysis verified that a fault downstream of a load breaker/fuse on the main buses and the distribution panels will not result in tripping of the entire bus. Cables in the system were evaluated to ensure they are protected against thermal damage.
Battery charger sizing was evaluated to determine the ability of each battery charger to power its DC system and to recharge the associated battery within a reasonable time.
These analyses were performed on a 60 Cell Battery as it will exist after the two additional cells are installed.
The sizing and voltage drop results were determined to be valid for 60 cell batteries with an aging factor of 125% and a minimum battery temperature of 18.3C. Reviews of sizing and voltage drop results for Station Blackout (SBO) and Small Break Loss of Coolant Accident (SBLOCA) revealed that all loads
Attachment 1 to NG-12-0028 Page 8 of 11 have adequate voltage and each battery has positive margin. The short circuit analysis revealed that no breakers were identified as overdutied. Each battery charger is capable of recharging the battery within 3.8 hrs following a worst case 4 hr emergency discharge while supplying normal steady state load on the 125V system.
Heating, Ventilation and Air Conditioning (HVAC) system impacts, Appendix R impacts, hydrogen generation, and heat up calculations have been documented.
The addition of the new battery cells will not require any design changes to the battery room or its ventilation system.
Walkdowns and analyses have been performed that verify that the existing battery racks were designed for and can accommodate the two additional cells.
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements 10 CFR 50.36 requires in part that the operating license of a nuclear production facility include technical specifications. Paragraph (c)(2)(ii) of that part requires that a Limiting Condition For Operation (LCO) of a nuclear reactor must be established for each item meeting one or more of four criteria. The DC Sources identified in LCO 3.8.4 meet Criterion 3, "A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier." Paragraph (c)(3) further requires the establishment of Surveillance Requirements, "relating to test, calibration, or inspection to assure ... that the limiting conditions for operation will be met." As discussed above, the proposed changes in the SRs for the 125 V batteries and chargers are sufficient to demonstrate Operability of the battery and chargers and therefore, are sufficient to ensure that the LCO is met.
4.2 Precedent Plants have performed battery modifications that have affected these SRs. For example:
Letter from Patrick D. Milano (USNRC) to Michael Kansler (Entergy) dated January 17, 2002, Indian Point Nuclear Generating Unit No. 3 - Issuance of Amendment Re: Technical Specifications Surveillance Requirement Regarding Station Battery 31 Terminal Voltage (TAC NO. MB3356)
(ML20090661).
Attachment 1 to NG-12-0028 Page 9 of 11 Letter from Lawrence W. Rossbach (USNRC) to John L. Skolds (Exelon) dated June 6, 2002, Dresden Nuclear Power Station, Unit 2 - Issuance of Amendment for Alternate Battery Float Charge (TAC NO. MB2880)
(ML021230651) 4.3 No Significant Hazards Consideration Determination NextEra Energy Duane Arnold has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) using the three standards set forth in 10 CFR 50.92, Issuance of amendment, as discussed below:
- 1) Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes modify Surveillance Requirements (SRs) regarding the battery terminal and charger voltages and amperage provided in SR 3.8.4.1 and SR 3.8.4.6. Accidents are initiated by the malfunction of plant equipment, or the catastrophic failure of plant structures, systems, or components. The performance of battery testing is not a precursor to any accident previously evaluated and does not change the manner in which the batteries are operated. The proposed testing requirements will not contribute to the failure of the batteries nor any plant structure, system, or component.
NextEra Energy Duane Arnold has determined that the proposed change in testing provides an equivalent level of assurance that the batteries are capable of performing their intended safety functions. Thus, the proposed changes do not affect the probability of an accident previously evaluated.
Verifying battery terminal voltage while on float charge for the batteries helps to ensure the effectiveness of the charging system and the ability of the batteries to perform their intended function. The proposed changes involve the manner in which the subject batteries are tested or maintained, and have no effect on the types or amounts of radiation released or the predicted offsite doses in the event of an accident. The proposed testing requirements are sufficient to provide confidence that these batteries are capable of performing their intended safety functions. Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2) Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Attachment 1 to NG-12-0028 Page 10 of 11 Response: No.
This TS SR change for the batteries is based upon the addition of two additional cells to each of the existing DAEC 125 VDC Safety Related Station Batteries (1D1 & 1D2). The improved batteries with 60 cells are at least equivalent to the existing 58-cell batteries. The batteries, with the added cells, provide an acceptable design margin to the existing batteries. Battery circuit coordination is not adversely affected by the addition of this improved battery with 60 cells. The proposed changes to these TS SRs do not introduce any new accident initiators or precursors, or any new design assumptions for those components used to mitigate the consequences of an accident. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3) Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
The improvement of the existing batteries with the addition of 2 cells and the subsequent TS SR changes that verify higher minimum terminal voltage on float charge in SR 3.8.4.1 and higher 125 VDC battery charger voltage with lower amperage in SR 3.4.3.6, the improved batteries and, the requirements associated with verifying their design functionality will not involve a significant reduction in the margin of safety. The improved batteries are at least equivalent to the existing batteries. The additional cells in the proposed improved batteries provide an acceptable design margin. The increase in the number of cells from 58 to 60 will result in a small increase in battery terminal voltage on float charge. These proposed TS SRs simply document the verification of the new minimum voltage and amperage values. Accordingly, there is no significant reduction in the margin of safety. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, NextEra Energy Duane Arnold concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of no significant hazards consideration is justified.
4.4 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be
Attachment 1 to NG-12-0028 Page 11 of 11 conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
10 CFR Section 51.22(c)(9) identifies certain licensing and regulatory actions which are eligible for categorical exclusion from the requirement to perform an environmental assessment. A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; and (3) result in a significant increase in individual or cumulative occupational radiation exposure. NextEra Energy Duane Arnold has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR Section 51.22(c)(9). Pursuant to 10 CFR Section 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment. The basis for this determination follows.
Basis The change meets the eligibility criteria for categorical exclusion set forth in 10 CFR Section 51.22(c)(9) for the following reasons:
- 1. As demonstrated in the 10 CFR 50.92 evaluation included in Section 4.3, the proposed amendment does not involve a significant hazards consideration.
- 2. The proposed changes do not result in an increase in power level, do not increase the production, nor alter the flow path or method of disposal of radioactive waste or byproducts. There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite.
- 3. The proposed changes do not result in changes in the level of control or methodology used for processing of radioactive effluents or handling of solid radioactive waste nor will the proposal result in any change in the normal radiation levels within the plant. There is no significant increase in individual or cumulative occupational radiation exposure.
Attachment 2 to NG-12-0028 Attachment 2 TSCR-132 Technical Specification Pages (Markups) 2 pages to follow
DC Sources Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 130.5 126 V In accordance with on float charge for the 125 VDC battery and the Surveillance 252 V for the 250 VDC battery. Frequency Control Program SR 3.8.4.2 Verify no visible corrosion at battery terminals In accordance with and connectors. the Surveillance Frequency Control OR Program Verify battery connection resistance within limits.
SR 3.8.4.3 Verify battery cells, cell plates, and racks show In accordance with no visual indication of physical damage or the Surveillance abnormal deterioration that could degrade Frequency Control battery performance. Program SR 3.8.4.4 Remove visible corrosion and verify battery cell to In accordance with cell and terminal connections are coated with the Surveillance anti-corrosion material. Frequency Control Program SR 3.8.4.5 Verify battery connection resistance within limits. In accordance with the Surveillance Frequency Control Program (continued)
DAEC 3.8-18 TSCR-132
DC Sources Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY
NOTE--------------------------------
This Surveillance shall not be performed on the required battery chargers in MODE 1, 2 or 3.
However, credit may be taken for unplanned events that satisfy this SR.
In accordance with SR 3.8.4.6 Verify each required battery charger supplies the Surveillance 293 300 amps at 132.5 129 V for the 125 Frequency Control VDC subsystem and 200 amps at 258 V for Program the 250 VDC subsystem.
SR 3.8.4.7 --------------------------NOTES-----------------------------
- 1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7.
- 2. This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is adequate to supply, In accordance with and maintain in OPERABLE status, the Surveillance the required emergency loads for the design Frequency Control duty cycle when subjected to a battery service Program test.
(continued)
DAEC 3.8-19 TSCR-132
Attachment 3 to NG-12-0028 Attachment 3 TSCR-132 Technical Specification Pages (Clean, typed) 2 pages to follow
DC Sources Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 130.5 V on In accordance with float charge for the 125 VDC battery and the Surveillance 252 V for the 250 VDC battery. Frequency Control Program SR 3.8.4.2 Verify no visible corrosion at battery terminals In accordance with and connectors. the Surveillance Frequency Control OR Program Verify battery connection resistance within limits.
SR 3.8.4.3 Verify battery cells, cell plates, and racks show In accordance with no visual indication of physical damage or the Surveillance abnormal deterioration that could degrade Frequency Control battery performance. Program SR 3.8.4.4 Remove visible corrosion and verify battery cell to In accordance with cell and terminal connections are coated with the Surveillance anti-corrosion material. Frequency Control Program SR 3.8.4.5 Verify battery connection resistance within limits. In accordance with the Surveillance Frequency Control Program (continued)
DAEC 3.8-18 Amendment
DC Sources Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY
NOTE--------------------------------
This Surveillance shall not be performed on the required battery chargers in MODE 1, 2 or 3.
However, credit may be taken for unplanned events that satisfy this SR.
In accordance with SR 3.8.4.6 Verify each required battery charger supplies the Surveillance 293 amps at 132.5 V for the 125 VDC Frequency Control subsystem and 200 amps at 258 V for the Program 250 VDC subsystem.
SR 3.8.4.7 --------------------------NOTES-----------------------------
- 3. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7.
- 4. This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is adequate to supply, In accordance with and maintain in OPERABLE status, the Surveillance the required emergency loads for the design Frequency Control duty cycle when subjected to a battery service Program test.
(continued)
DAEC 3.8-19 Amendment
Attachment 4 to NG-12-0028 Attachment 4 TSCR-132 Technical Specification BASES pages (Markups)
FOR INFORMATION ONLY 6 pages to follow
DC Sources Operating B 3.8.4 BASES BACKGROUND During normal operation, the DC loads are powered from the (continued) battery chargers with the batteries floating on the system, acting as a voltage regulator. If a battery is disconnected from its distribution bus and only a charger is supplying bus voltage, the associated Distribution System shall be considered inoperable, as it cannot supply the peak power required for some event scenarios.
In case of loss of power to any battery charger, the DC loads are automatically powered from the battery until the redundant charger or swing charger is placed in service by operator action.
The DC Power Distribution System is described in more detail in Bases for LCO 3.8.7, "Distribution System Operating," and LCO 3.8.8, "Distribution System Shutdown."
Each battery (with a minimum of 598 cells for the 125 VDC batteries and 115 cells for the 250 VDC battery) has adequate storage capacity to carry the control and essential instrumentation power continuously for approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and the emergency motor loads for their required length of time.
Each DC battery is separately housed in a ventilated room apart from its charger and distribution centers. Each subsystem is located in an area separated physically and electrically from the other subsystems to ensure that a single failure in one subsystem does not cause a failure in a redundant subsystem. There is no sharing between redundant Class 1E subsystems such as batteries, battery chargers, or distribution panels except for the swing 125 VDC battery charger which is mechanically interlocked to prevent being simultaneously connected to both distribution buses with double isolation circuit breakers.
The batteries for DC electrical power subsystems are sized to produce required capacity at 80% of nameplate rating, corresponding to warranted capacity at the end of a nominal 20 year service cycle. The expected life of the batteries may exceed 20 years and will be adjusted based on engineering evaluations of each battery's capacity trend data as the batteries age. The minimum design voltage limits are 105V and 210V for the 125 VDC and 250 VDC subsystems, respectively.
(continued)
DAEC B 3.8-42 TSCR-132
DC Sources Operating B 3.8.4 BASES ACTIONS B.1 and B.2 (continued) is consistent with the time suggested in Regulatory Guide 1.93 (Ref. 6).
C.1 With the 250 VDC electrical power subsystem inoperable, the HPCI System and associated PCIVs may be incapable of performing their intended function and must be immediately declared inoperable.
The associated PCIVs referred to are: the RHR-SDC Isolation Valve (MO-1909), the RWCU Inlet Outboard Isolation Valve (MO-2701),
the HPCI Steam Supply Isolation Valve (MO-2239), the HCPI Feedwater Injection Isolation Valve (MO-2312), and Main Steam Drain Line Isolation Valve (MO-4424).
D.1 Condition D corresponds to a level of degradation in the DC Electrical Power System that either causes a required safety function to be lost (e.g. when Division I and Division II of the 125 VDC electrical power subsystem are inoperable) or that results in a level of degradation that is severe enough to warrant an immediate shutdown (e.g. when one Division of the 125 VDC electrical power subsystem is inoperable concurrent with the 250 VDC electrical power subsystem being inoperable). When this situation exists, the plant may be in a condition outside the accident analysis. Therefore, no additional time is justified for continued operation. LCO 3.0.3 must be entered immediately to commence a controlled plant shutdown.
SURVEILLANCE SR 3.8.4.1 REQUIREMENTS Verifying battery terminal voltage while on float charge for the batteries helps to ensure the effectiveness of the charging system and the ability of the batteries to perform their intended function.
Float charge is the condition in which the charger is supplying the continuous charge required to overcome the internal losses of a battery (or battery cell) and maintain the battery (or a battery cell) in a fully charged state. The voltage requirements are based on (continued)
DAEC B 3.8-46 TSCR-132
DC Sources Operating B 3.8.4 BASES SURVEILLANCE SR 3.8.4.1 (continued)
REQUIREMENTS the nominal design voltage of the battery and are consistent with the manufacturers minimum float voltage recommendations initial voltages assumed in the battery margin calculations (Ref. 4). The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. The Frequency is consistent with manufacturer recommendations and with the intent of IEEE-450 (Ref. 7).
SR 3.8.4.2 Visual inspection to detect corrosion of the battery cells and connections, or measurement of the resistance of each inter-cell, inter-rack, inter-tier, and terminal connection, provides an indication of physical damage or abnormal deterioration that could potentially degrade battery performance.
The connection resistance limits established for this SR must be no more than 20% above the resistance as measured during installation or not above the ceiling value established by the manufacturer. The resulting limits are 5.0 E-5 ohms for inter-cell connections and 1.4 E-4 ohms for inter-rack connections, inter-tier connections and terminal connections. The Frequency for these inspections, which can detect conditions that can cause power losses due to resistance heating, is controlled under the Surveillance Frequency Control Program. This Frequency is considered acceptable based on operating experience related to detecting corrosion trends.
SR 3.8.4.3 Visual inspection of the battery cells, cell plates, and battery racks provides an indication of physical damage or abnormal deterioration that could potentially degrade battery performance.
The presence of physical damage or deterioration does not necessarily represent a failure of this SR, provided an evaluation determines that the physical damage or deterioration does not affect the OPERABILITY of the battery (its ability to perform its design function).
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. The Frequency for this SR is consistent with the intent of IEEE-450 (Ref. 7),
which recommends detailed visual (continued)
DAEC B 3.8-47 TSCR-132
DC Sources Operating B 3.8.4 BASES SURVEILLANCE SR 3.8.4.3 (continued)
REQUIREMENTS inspection of cell condition and rack integrity on a yearly basis.
SR 3.8.4.4 and SR 3.8.4.5 Visual inspection and resistance measurements of inter-cell, inter-rack, inter-tier, and terminal connections provide an indication of physical damage or abnormal deterioration that could indicate degraded battery condition. The anti-corrosion material is used to help ensure good electrical connections and to reduce terminal deterioration. The visual inspection for corrosion is not intended to require removal of and inspection under each terminal connection.
The removal of visible corrosion is a preventive maintenance SR.
The presence of visible corrosion does not necessarily represent a failure of this SR, provided visible corrosion is removed during performance of this Surveillance. The connection resistance limits for this SR must be no more than 20% above the resistance as measured during installation, or not above the ceiling value established by the manufacturer. The resulting limits are 5.0 E-5 ohms for inter-cell connections and 1.4 E-4 ohms for inter-rack connections, inter-tier connections and terminal connections.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. The Frequency of these SRs is consistent with the intent of IEEE-450 (Ref. 7), which recommends detailed visual inspection of cell condition and inspection of cell to cell and terminal connection resistance on a yearly basis.
SR 3.8.4.6 Battery charger capability requirements are based on the design capacity of the chargers (Ref. 3). According to the recommendations of Regulatory Guide 1.32 (Ref. 8), the battery charger supply is required to be based on the largest combined demands of the various steady state loads and the charging capacity to restore the battery from the design minimum charge state to the fully charged state, irrespective of the status of the unit during these demand occurences. The minimum required amperes ensures that these requirements can be satisfied. The minimum required voltage ensures that the requirements are satisfied at the minimum float voltage that the battery chargers are normally set for.
(continued)
DAEC B 3.8-48 TSCR-132
DC Sources Operating B 3.8.4 BASES SURVEILLANCE SR 3.8.4.6 (continued)
REQUIREMENTS The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. The Frequency is acceptable, given the unit conditions required to perform the test and the other administrative controls existing to ensure adequate charger performance during these 24 month intervals. In addition, this Frequency is intended to be consistent with expected fuel cycle lengths.
This SR is modified by a Note. The reason for the Note is that performing the Surveillance on a required battery charger would remove a required DC electrical power subsystem from service, perturb the electrical distribution system, and challenge safety systems. This Note does not preclude performance of this SR on the "spare" battery charger (i.e., a charger not in-service or "required"). This Note also acknowledges that credit may be taken for unplanned events that satisfy the Surveillance.
SR 3.8.4.7 A battery service test is a special test of the battery's capability, as found, to satisfy the design requirements (battery duty cycle) of the DC electrical power system. The discharge rate and test length corresponds to the design duty cycle requirements as specified in Reference 4. The voltage of each cell shall be determined after the discharge. Following discharge, battery cell parameters must be restored in accordance with LCO 3.8.6. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. The Frequency is consistent with the maximum length of an operating cycle.
This SR is modified by two Notes. Note 1 allows the performance of a performance discharge test in lieu of a service test.
The modified performance discharge test is a simulated duty cycle consisting of just two rates; the one minute rate published for the battery or the largest current load of the duty cycle, followed by the test rate employed for the performance test, both of which envelope the duty cycle of the service test. Since the ampere-hours removed by a rated one minute discharge represents a very small portion of the battery capacity, the test rate can be changed to that for the performance test without compromising the results of the performance discharge test. The battery terminal voltage (continued)
DAEC B 3.8-49 TSCR-060
DC Sources Operating B 3.8.4 BASES SURVEILLANCE SR 3.8.4.8 (continued)
REQUIREMENTS this test is normally controlled under the Surveillance Frequency Control Program.. However, if the battery shows degradation, or if the battery has reached 85% of its expected life and capacity is 100% of the manufacturer's rating, the Surveillance Frequency is reduced to 12 months. However, if the battery shows no degradation but has reached 85% of its expected life, the Surveillance Frequency is only reduced to 24 months for batteries that retain capacity 100% of the manufacturer's rating.
Degradation is indicated, according to IEEE-450 (Ref. 7), when the battery capacity drops by more than 10% relative to its capacity on the previous performance test or when it is 10% below the manufacturer's rating. All these Frequencies are consistent with the recommendations in IEEE-450 (Ref. 7).
This SR is modified by a Note. The reason for the Note is that performing the Surveillance would remove a required DC electrical power subsystem from service, perturb the Electrical Distribution System, and challenge safety systems. Credit may be taken for unplanned events that satisfy the Surveillance.
Following discharge, battery cell parameters must be restored in accordance with LCO 3.8.6.
REFERENCES 1. UFSAR, Section 3.1.2.2.8.
- 2. UFSAR, Section 1.8.6.
- 3. IEEE Standard 308, 1971.
- 4. Calculations: CAL-E08-007 and CAL-E08-008 CAL-E92-09, CAL-E92-08 and CAL-E92-07, latest approved revisions.
- 5. UFSAR, Chapter 15.
- 6. Regulatory Guide 1.93.
- 7. IEEE Standard 450, 1980.
- 8. Regulatory Guide 1.32, February 1977.
- 9. IEEE Standard 485, 1983.
- 10. UFSAR, Section 8.3.2 DAEC B 3.8-51 TSCR-132