December 4, 2012 TO: TECHNICAL SPECIFICATION DISTRIBUTION Attached is a Renewed Operating License page associated with TSCR-1 36 and Amendment 284 which revises License Condition 2.C.(5) to add supplemental information regarding Cyber Security Milestone 6. Also attached is page 2 of Appendix B, Additional Conditions, of the License which' adds changes for Amendment 279 which were inadvertently omitted in a previous distribution.

Please update your copy of the Technical Specifications as indicated in the attached Update Instructions.

THIS CHANGE BECOMES EEEECTIVE12/07/2012-.

IMPORTANT:

Holders of Technical Specification Copies are required to sign and date the Notice of Receipt Form below, detach it at the dotted line and:

RETURN IT TO THE ADDRESSEE ALONG WITH THE SHEETS REMOVED FROM THE TECHNICAL SPECIFICATIONS.

Tom Byrne Acting Regulatory Affairs Manager Copy No: 14 NRC REGION III Issued To: REGIONAL LIBRARY NOTICE OF RECEIPT OF TECHNICAL SPECIFICATION REVISION To:

Pat Vandersee, Licensing Department Duane Arnold Energy Center, 3277 DAEC Road, Palo, IA 52324 This acknowledges receipt of TSCR-1 36 to the Duane Arnold Energy Center Technical Specifications.

Signature:

DATE 00o)

P 14-,_

December 4, 2012 Page 1 of 1 DUANE ARNOLD ENERGY CENTER TECHNICAL SPECIFICATIONS UPDATE INSTRUCTIONS FOR AMENDMENT 284 REMOVE INSERT Technical Specifications:

Technical Specifications:

License Page 4 License Page 2 of Appendix B (Additional Conditions)

License Page 4 License Page 2 of Appendix B (Additional Conditions) and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Duane Arnold Energy Center Physical Security Plan," submitted by letter dated May 16, 2006.

NextEra Energy Duane Arnold, LLC shall fully implement and maintain in effect all provisions of the Commission-approved Duane Arnold Energy Center/NextEra Energy Duane Arnold, LLC Cyber Security Plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Duane Arnold Energy Center/NextEra Energy Duane Arnold, LLC CSP was approved by License Amendment No. 278, as supplemented by a change approved by license Amendment No. 284.

(6) Deleted (7) Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 279, are hereby incorporated into this license. NextEra Energy Duane Arnold, LLC shall operate the facility in accordance with the Additional Conditions.

(8) The licensee is authorized to revise the Updated Final Safety Analysis Report by deleting the footnote for Section 9.1.4.4.5 which states: "*The NRC has not endorsed the reactor building crane as single-failure proof (Reference 9)," and by deleting Reference 9 of the references for Section 9.1.

(9) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2.

Assessment of mutual aid fire fighting assets

3.

Designated staging areas for equipment and materials

4.

Command and control

5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2.

Communications

3.

Minimizing fire spread

4.

Procedures for implementing integrated fire response strategy

5.

Identification of readily-available pre-staged equipment

6.

Training on integrated fire response strategy

7.

Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:

1. Water spray scrubbing
2.

Dose to onsite responders (10) The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.

Renewed License No. DPR-49 Amendment 284

A Amendment Number Additional Conditions Implementation Date 260 (2)

DELETED 260 (3)

NextEra Energy Duane Arnold shall take no action to cause FPL Group Capital, or its successors and assigns, to void, cancel, or modify its $50 million contingency commitment to NextEra Energy Duane Arnold, as represented in the license transfer application, or cause it to fail or perform or impair its performance under the commitment, or remove or interfere with NextEra Energy Duane Arnold's ability to draw upon the commitment, without the prior written consent from the NRC. An executed copy of the Support Agreement shall be submitted to the NRC no later than 30 days after completion of the license transfer. Also, NextEra Energy Duane Arnold shall inform the NRC in writing any time that it draws upon the $50 million commitment.

Amendment No. 279