ML070380484
| ML070380484 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 02/05/2007 |
| From: | NRC/NRR/ADRO/DORL/LPLIII-1 |
| To: | |
| Karl Feintuch, LPL3-1 | |
| Shared Package | |
| ML063520420 | List: |
| References | |
| TAC MD0293 | |
| Download: ML070380484 (1) | |
Text
System Leakage and Hydrostatic Testing Operation 3.10.1 3.10 SPECIAL OPERATIONS 3.10.1 System Leakage and Hydrostatic Testing Operation LCO 3.10.1 The average reactor coolant temperature specified in Table 1.1-1 for MODE 4 may be changed to "NA," and operation considered not to be in MODE 3; and the requirements of LCO 3.4.8, "Residual Heat Removal (RHR) Shutdown Cooling System Cold Shutdown," may be suspended, to allow reactor coolant temperature > 212'F:
For performance of a system leakage or hydrostatic test,
- As a consequence of maintaining adequate pressure for a system leakage or hydrostatic test, or
" As a consequence of maintaining adequate pressure for control rod scram time testing initiated in conjunction with a system leakage or hydrostatic test, provided the following MODE 3 LCOs are met:
- a.
LCO 3.3.6.2, "Secondary Containment Isolation Instrumentation," Functions 1, 3, and 4 of Table 3.3.6.2-1;
- b.
LCO 3.6.4.1, "Secondary Containment";
- c.
LCO 3.6.4.2, "Secondary Containment Isolation Valves/Dampers (SCIV/Ds)"; and
- d.
LCO 3.6.4.3, "Standby Gas Treatment (SBGT) System."
MODE 4 with average reactor coolant temperature > 212 0 F.
APPLICABILITY:
DAEC 3.10-1 Amendment 264