|
---|
Category:Technical Specifications
MONTHYEARML21067A6422021-05-13013 May 2021 Cyber Security License Amendment Approval ML19310C2042020-01-0202 January 2020 Issuance of Amendment No. 309 to Align Technical Specifications Staffing and Administrative Requirements NG-18-0041, Correction of Error in Final Technical Specification Page 1.1-3 for License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-03-28028 March 2018 Correction of Error in Final Technical Specification Page 1.1-3 for License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control NG-17-0233, Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers2017-12-15015 December 2017 Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers ML15310A0822015-12-22022 December 2015 Issuance of Amendment to Adopt Technical Specifications Task Force (TSTF)-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML15169A2612015-08-18018 August 2015 Issuance of Amendment Concerning Extension of Cyber Security Plan Milestone 8 Completion Date ML15014A2002015-02-10010 February 2015 Issuance of Amendment to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523 Generic Letter 2008-01, Managing Gas Accumulation (Tac No. MF4358) NG-14-0143, License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Proces2014-06-23023 June 2014 License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NG-13-0297, License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42013-08-29029 August 2013 License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 NG-12-0434, Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.122012-11-13013 November 2012 Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.12 NG-12-0256, Response to Request for Additional Information (RAI Regarding License Amendment Request (TSCR-135): Application for One-Time Technical Specification Change Regarding Core Spray Operability During Shutdown2012-06-27027 June 2012 Response to Request for Additional Information (RAI Regarding License Amendment Request (TSCR-135): Application for One-Time Technical Specification Change Regarding Core Spray Operability During Shutdown ML12107A1532012-04-13013 April 2012 NRR E-mail Capture - ME8251 - Duane Arnold - Preparations for Potential Bravo Diesel Generator LCO Extension TS 3.8.1 NG-12-0028, License Amendment Request (TSCR-132): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42012-03-22022 March 2012 License Amendment Request (TSCR-132): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 ML1207402022012-03-21021 March 2012 Correction to Amendment No. 280 Regarding Adoption of Technical Specifications Task Force Traveler (TSTF-425) to Relocate Specific Surveillance Frequencies to a Licensee-Controlled Program NG-12-0054, Supplement to an Application to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2012-02-0303 February 2012 Supplement to an Application to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program NG-11-0371, License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.52011-09-29029 September 2011 License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.5 NG-11-0299, Response to Request for Additional Information Related to an Amendment to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2011-08-15015 August 2011 Response to Request for Additional Information Related to an Amendment to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program NG-11-0037, License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3)2011-02-23023 February 2011 License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3) ML0530503092010-12-16016 December 2010 Current Facility Operating License DPR-49, Tech Specs, Revised 03/17/2018 ML1029305242010-12-16016 December 2010 Issuance of Renewed Facility Operating License No. DPR-49 for Duane Arnold Energy NG-09-0119, Request for Exemption from Certain Requirements of 10 CFR Part 50, Appendix J and Associated Changes to Technical Specifications for Main Steamline Isolation Valve Local Leakage Rate Testing (TSCR-096) Affected Technical Specification...2009-03-0404 March 2009 Request for Exemption from Certain Requirements of 10 CFR Part 50, Appendix J and Associated Changes to Technical Specifications for Main Steamline Isolation Valve Local Leakage Rate Testing (TSCR-096) Affected Technical Specification... ML0822601352008-09-0909 September 2008 Technical Specifications, Issuance of Amendment Regarding License Amendment Request to Remove the Emergency Diesel Generator Surveillance Requirement for Preplanned Preventive Maintenance and Testing ML0817805562008-06-24024 June 2008 Tech Spec Pages for Amendment 269 Adoption of Changes to TSTF-448, Revision 3, Control Room Habitability. NG-08-0312, Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications . .2008-05-0808 May 2008 Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications . . ML0808103592008-03-20020 March 2008 Technical Specifications, Amendment to Improve the Ranked Position Withdrawal Sequence Control Rod Insertion Process NG-07-0571, Application for Technical Specification Improvement to Adopt TSTF-476, Revision 1, Improved Banked Position Withdrawal Sequence (BPWS) Control Rod Insertion Process (NEDO-33091).2007-09-14014 September 2007 Application for Technical Specification Improvement to Adopt TSTF-476, Revision 1, Improved Banked Position Withdrawal Sequence (BPWS) Control Rod Insertion Process (NEDO-33091). NG-07-0493, Tscr: Consolidated Line Item Improvement, Adoption of Changes to STS Under TSTF-448, Revision 3 Regarding Control Room Envelopes Habitability2007-06-29029 June 2007 Tscr: Consolidated Line Item Improvement, Adoption of Changes to STS Under TSTF-448, Revision 3 Regarding Control Room Envelopes Habitability ML0717901682007-06-28028 June 2007 Tech Spec Pages for Amendment 265 Regarding Technical Specification Change Related to the Revised Rule for Combustible Gas Control ML0703804842007-02-0505 February 2007 Technical Specification, System Leakage and Hydrostatic Testing Operation ML0635405782006-12-14014 December 2006 Tech Spec Pages for Amendment 263 Regarding Inoperability of Snubbers ML0632500392006-11-15015 November 2006 Technical Specifications, Revises TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation, to Eliminate the Main Steamline Radiation Monitor Trip Function NG-06-0472, Technical Specification Change Request (TSCR-083): Adoption of TSTF-478, Rev. 0, 'Bwr Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Affected Tech Specs: Section 3.6.3.1 and 3.6.3.22006-07-17017 July 2006 Technical Specification Change Request (TSCR-083): Adoption of TSTF-478, Rev. 0, 'Bwr Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Affected Tech Specs: Section 3.6.3.1 and 3.6.3.2 NG-06-0250, Technical Specification Change Request (TSCR-078): Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities, Affected Technical Specifications: Section 3.10.12006-03-0101 March 2006 Technical Specification Change Request (TSCR-078): Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities, Affected Technical Specifications: Section 3.10.1 ML0627102722006-01-27027 January 2006 Technical Specifications, Transfer of License to FPL Energy Duane Arnold, LLC ML0603201602006-01-27027 January 2006 Appendix B - Additional Conditions Operating License No. DPR-49 ML0517404312005-06-24024 June 2005 (TS) - Correction to Amendment No. 258 Dated May 12, 2005 ML0517503432005-06-23023 June 2005 Technical Specifications, Revised Action for Scram Discharge Volume Vent and Drain Values ML0513301812005-05-12012 May 2005 Technical Specifications, Issuance of Amendment to Revise the Technical Specifications by Adopting TSTF Nos. 273, 284, and 299 ML0503401522005-01-31031 January 2005 Technical Specifications, Deletion Requirements for Submittal of Occupational Radiation and Monthly Operating Reports ML0501200762005-01-10010 January 2005 TS Pages for Amendment 255 Regarding Technical Specifications Adopt TSTF-359, Increased Flexibility in Mode Restraints NG-04-0689, Application for Technical Specification Improvement to Revise the Required Action within TS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process2004-10-29029 October 2004 Application for Technical Specification Improvement to Revise the Required Action within TS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process ML0324004962003-08-25025 August 2003 Technical Specification Page, Updating Reactor Coolant System Pressure and Temperature Limit Curves (TS Figure 3.4.9-1) and Extends Applicability to 32 Effective full-power Years ML0314100482003-05-16016 May 2003 License Amendment 251, License Page 4a, Pertaining to Reactor Building Crane and single-failure Proof NG-03-0304, Revision of Technical Specification Change Request (TSCR-059A): Update to Reactor Coolant System Pressure and Temperature Limit Curves.2003-05-0202 May 2003 Revision of Technical Specification Change Request (TSCR-059A): Update to Reactor Coolant System Pressure and Temperature Limit Curves. NG-03-0332, 2002 Annual Radioactive Materials Release Report2003-04-30030 April 2003 2002 Annual Radioactive Materials Release Report ML0308505872003-03-21021 March 2003 TS Page for Amendment No. 249 ML0229501072002-10-28028 October 2002 Correction to Issuance of Amendment No. 248, TAC MB4269 ML0227703442002-10-0202 October 2002 Tech Spec for Amendment No. 248, Organization 5.2 for Duane Arnold ML0227703312002-10-0101 October 2002 Technical Specifications, Extends On-line Battery Replacement Time ML0210800482002-05-30030 May 2002 License Amendment No. 246, Issuance of Amendment Missed Surveillance, Consolidated Line Item Improvement 2021-05-13
[Table view] |
Text
FPL ENERGY DUANE ARNOLD, LLC CENTRAL IOWA POWER COOPERATIVE CORN BELT POWER COOPERATIVE DOCKET 50-331 DUANE ARNOLD ENERGY CENTER FACILITY OPERATING LICENSE License No. DPR-49
- 1. The Atomic Energy Commission (the Commission) having found that:
A. The application for license filed by FPL Energy Duane Arnold, LLC, Central Iowa Power Cooperative and Corn Belt Power Cooperative (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B. Construction of the Duane Arnold Energy Center (facility) has been substantially completed in conformity with Construction Permit No. DPPR-70; the application, as amended; the provisions of the Act; and the rules and regulations of the Commission; C. The facility will operate in conformity with the application, as amended; the provisions of the Act; and the rules and regulations of the Commission; D. There Is reasonable assurance: (i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public; and (ii)that such activities will be conducted In compliance with the rules and regulations of the Commission; E. FPL Energy Duane Arnold, LLC Is technically qualified and FPL Energy Duane Arnold, LLC, Central Iowa Power Cooperative and Corn Belt Power Cooperative Iare financially qualified to engage in the activities authorized by this operating license In accordance with the rules and regulations of the Commission; F. The licensees have satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements", of the Commission's regulations; ; !
kBT1et Nb. 260
(3. The issuance of this operating license will not be inimical to the common defense and security or to the health and safety of the public; H. After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available alternatives, the issuance of Facility Operating License No. DPR-49 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; The recelpt, possession, and use of source, by-product and special nuclear material as authorized by this license will be In accordance with the Commisslon*'-regulations In 10 CFR Part 30 and 70, Including 10 CFR Section 30.33,70.23 and 70.31.
- 2. Facility Operating License No. DPR-49 Is hereby issued to FPL Energy Duane Arnold, LLC,: Central Iowa Power Cooperative (CIPCO) and Corn Belt Power Cooperative (Corn Belt) to read as follows:
A. This license applies to the Duane Arnold Energy Center, a boiling water reactor and associated equipment (the facility), owned by FPL Energy Duane Arnold, LLC, Central Iowa Power Cooperative and Corn Belt Power Cooperative and operated by FPL Energy Duane Arnold, LLC. The facility is located on FPL Energy Duane Arnold, LLC's, Central Iowa Power Cooperative's and Corn Belt Power Cooperative's site near Palo InLinn County, Iowa. This site consists of approximately 500 acres adjacent to the Cedar River and Is described in the "Final Safety Analysis Report", as supplemented and amended (Amendments 1 through 14) and the Environmental Report as supplemented and amended (Supplements i through 5).
B Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
(1) FPL Energy Duane Arnold, LLC, pursuant to Section 104b of the 'Act and 10 CFR Part 50, "Licensing of Production and Utilization Facilities, to possess, use and operate the facility;' and CIPCO and Corn Belt to possess the facility at the designated location in Linn County, Iowa, in accordance with the procedures and limitations set forth In this license; Ala-lilmt ZNi 260
2.13.(2) FPL Energy Duane Arnold, LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance vvth the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended as of June 1992 and as supplemented by letters dated March 26, 1993, and November 17, 2000.
2.11.(3) FPL Energy Duane Arnold, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; 2.E;.(4) FPL Energy Duane Arnold, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated radioactive apparatus components; 2.El.(5) FPL Energy Duane Arnold, LLC, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations iri10 CFR Chapter 1; Part 20, Section 30.34 of Part 3C0, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified orincorporated below:.
Ma dImum Power Level 2.C.(1) FPL Energy Duane Arnold, LLC is authorized to operate the Duane Arnold Energy Center at steady state reactor core power levels not in excess of 1912 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained In Appendix A, as revised through Amendment No. 2M_, are hereby Incorporated in the license. FPL Energy Duane Arnold, LLC shall operate the facility In accordance with the Technical Specifications.
AramInat M. 2W
(a) For Surveillance Requirements (SRs) whose acceptance criteria are modified, either directly or indirectly, by the Increase Inauthorized maximum power level in 2.C.(1) above, Inaccordance with Amendment No. 243 to Facility Operating License DPR-49, those SRs are not required to be performed until their next scheduled performance, which Isdue at th& end of the first surveillance interval that begins on the date the Surveillance was last performed prior to Implementation of Amendment No. 243.
(b) The licensee will perform the generator load reject transients test required by the General Electric Licensing Topical Report for Extended Power Uprate (NEDC-32424P-A) - ELTR-1, Including the allowances described In Section L.2.4 (2) of ELTR-1 regarding credit for unplanned plant transient events, using the thermal power level (1658 MWt) to establish the ELTR-1 power level limit. The testing shall be performed at an Initiating power level greater than the steady-state operation power level exceeding the ELTR-1 power level limit for the generator load reject transient.
(3) Fire Protection FPL Energy Duane Arnold, LLC shall Implement and maintain In effect all provisions of the approved fire protection program as described Inthe Final Safety Analysis Report for the Duane Arnold Energy Center and as approved in the SER dated June 1, 1978, and Supplement dated February 10, 1981, subject to the following provision:
FPL Energy Duane Arnold, LLC may make changes to the approved fire protection program without prior approval of the Commission only If those changes would not adversely affect the ability to achieve and maintain safe shutdown Inthe event of a fire.
(4) The licensee Is authorized to operate the Duane Arnold Energy Center following Installation of modified safe-ends on the eight primary recirculation system Inlet lines which are described In the licensee letter dated July 31, 1978. and supplemented by letter dated December 8, 1978.
(5) Physical Protection FPL Energy Duane Arnold, LLC shall fully Implement and maintain Ineffect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans Including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, Is entitled: ONuclear Management Company Duane Arnold Energy Center Physical Security Plan, Revision 0" submitted by letter dated October 18, as supplemented by letter dated October 21, 2004.
AnanreB-t t~b. 260
-4a-2.C.(6) Deleted 2.C.(7) Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 260 are hereby Incorporated Into this license. FPL Energy Duane Arnold, LLC shall operate the facility in accordance with the Additional Conditions.
2.(;.(8) The License is authorized to revise the Updated Final Safety Analysis Report by deleting the footnote for Section 9.1.4.4.5 which states: "*The NRC has not endorsed the reactor building crane as single-failure proof (Reference 9),' and by deleting Reference 9 of the references for Section 9.1.
D. This license is effective as of the date of issuance and shall expire at midnight February 21, 2014.
FOR THE ATOMIC ENERGY COMMISSION Originalsignedby Roger Boyd for A. Giambuso, Deputy Director for Reactor Projects Directorate of ULcensing Enclosure~s:
Appendix A Technical Specifications Appendix B Additional Conditions Date of Issuance: February 22, 1974 Anamhent 1'b. 260