MONTHYEARML0427102392004-10-18018 October 2004 Ctr, RAI, TS Change Request (TSCR-029) to Adopt Four NRC-Approved Generic Changes to Improved Technical Specifications Project stage: RAI NG-04-0037, Response to Staffs Request for Additional Information (RAI) Re Technical Specification Change Request (TSCR-029) to Adopt Four Nuclear Regulatory Commission - Approved Generic Chances to Improved Technical Specifications2004-11-22022 November 2004 Response to Staffs Request for Additional Information (RAI) Re Technical Specification Change Request (TSCR-029) to Adopt Four Nuclear Regulatory Commission - Approved Generic Chances to Improved Technical Specifications Project stage: Request ML0511106922005-05-12012 May 2005 License Amendment, Issuance of Amendment to Revise the Technical Specifications by Adopting TSTF Nos. 273, 284, and 299 Project stage: Approval ML0513301812005-05-12012 May 2005 Technical Specifications, Issuance of Amendment to Revise the Technical Specifications by Adopting TSTF Nos. 273, 284, and 299 Project stage: Approval ML0513804822005-06-14014 June 2005 NRC Staff Denial of Licensee Request to Adopt Technical Specification Traveler (TSTF) 264 Project stage: Other ML0517404312005-06-24024 June 2005 (TS) - Correction to Amendment No. 258 Dated May 12, 2005 Project stage: Acceptance Review ML0517300052005-06-24024 June 2005 Correction to Amendment No. 258 Dated May 12, 2005 Project stage: Other 2005-05-12
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML21067A6422021-05-13013 May 2021 Cyber Security License Amendment Approval ML19310C2042020-01-0202 January 2020 Issuance of Amendment No. 309 to Align Technical Specifications Staffing and Administrative Requirements NG-18-0041, Correction of Error in Final Technical Specification Page 1.1-3 for License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-03-28028 March 2018 Correction of Error in Final Technical Specification Page 1.1-3 for License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control NG-17-0233, Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers2017-12-15015 December 2017 Submittal of License Amendment Request (TSCR-178) Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers ML15310A0822015-12-22022 December 2015 Issuance of Amendment to Adopt Technical Specifications Task Force (TSTF)-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML15169A2612015-08-18018 August 2015 Issuance of Amendment Concerning Extension of Cyber Security Plan Milestone 8 Completion Date ML15014A2002015-02-10010 February 2015 Issuance of Amendment to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523 Generic Letter 2008-01, Managing Gas Accumulation (Tac No. MF4358) NG-14-0143, License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Proces2014-06-23023 June 2014 License Amendment Request (TSCR-146): Application to Revise Tech Specs to Adopt Technical Specifications Task Force (TSTF) Traveler-523,Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process NG-13-0297, License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42013-08-29029 August 2013 License Amendment Request (TSCR-145): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 NG-12-0434, Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.122012-11-13013 November 2012 Technical Specification Change Request (TSCR-141): License Amendment Request for Change to Renewed Operating License Condition C.12 NG-12-0256, Response to Request for Additional Information (RAI Regarding License Amendment Request (TSCR-135): Application for One-Time Technical Specification Change Regarding Core Spray Operability During Shutdown2012-06-27027 June 2012 Response to Request for Additional Information (RAI Regarding License Amendment Request (TSCR-135): Application for One-Time Technical Specification Change Regarding Core Spray Operability During Shutdown ML12107A1532012-04-13013 April 2012 NRR E-mail Capture - ME8251 - Duane Arnold - Preparations for Potential Bravo Diesel Generator LCO Extension TS 3.8.1 NG-12-0028, License Amendment Request (TSCR-132): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.42012-03-22022 March 2012 License Amendment Request (TSCR-132): Application for Technical Specification Change Regarding Battery Terminal and Charger Voltage and Amperage Section Affected: 3.8.4 ML1207402022012-03-21021 March 2012 Correction to Amendment No. 280 Regarding Adoption of Technical Specifications Task Force Traveler (TSTF-425) to Relocate Specific Surveillance Frequencies to a Licensee-Controlled Program NG-12-0054, Supplement to an Application to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2012-02-0303 February 2012 Supplement to an Application to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program NG-11-0371, License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.52011-09-29029 September 2011 License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.5 NG-11-0299, Response to Request for Additional Information Related to an Amendment to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2011-08-15015 August 2011 Response to Request for Additional Information Related to an Amendment to Adopt Technical Specifications Task Force Traveler TSTF-425, Revision 3, to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program NG-11-0037, License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3)2011-02-23023 February 2011 License Amendment Request (TSCR-120): Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425, Rev. 3) ML0530503092010-12-16016 December 2010 Current Facility Operating License DPR-49, Tech Specs, Revised 03/17/2018 ML1029305242010-12-16016 December 2010 Issuance of Renewed Facility Operating License No. DPR-49 for Duane Arnold Energy NG-09-0119, Request for Exemption from Certain Requirements of 10 CFR Part 50, Appendix J and Associated Changes to Technical Specifications for Main Steamline Isolation Valve Local Leakage Rate Testing (TSCR-096) Affected Technical Specification...2009-03-0404 March 2009 Request for Exemption from Certain Requirements of 10 CFR Part 50, Appendix J and Associated Changes to Technical Specifications for Main Steamline Isolation Valve Local Leakage Rate Testing (TSCR-096) Affected Technical Specification... ML0822601352008-09-0909 September 2008 Technical Specifications, Issuance of Amendment Regarding License Amendment Request to Remove the Emergency Diesel Generator Surveillance Requirement for Preplanned Preventive Maintenance and Testing ML0817805562008-06-24024 June 2008 Tech Spec Pages for Amendment 269 Adoption of Changes to TSTF-448, Revision 3, Control Room Habitability. NG-08-0312, Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications . .2008-05-0808 May 2008 Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications . . ML0808103592008-03-20020 March 2008 Technical Specifications, Amendment to Improve the Ranked Position Withdrawal Sequence Control Rod Insertion Process NG-07-0571, Application for Technical Specification Improvement to Adopt TSTF-476, Revision 1, Improved Banked Position Withdrawal Sequence (BPWS) Control Rod Insertion Process (NEDO-33091).2007-09-14014 September 2007 Application for Technical Specification Improvement to Adopt TSTF-476, Revision 1, Improved Banked Position Withdrawal Sequence (BPWS) Control Rod Insertion Process (NEDO-33091). NG-07-0493, Tscr: Consolidated Line Item Improvement, Adoption of Changes to STS Under TSTF-448, Revision 3 Regarding Control Room Envelopes Habitability2007-06-29029 June 2007 Tscr: Consolidated Line Item Improvement, Adoption of Changes to STS Under TSTF-448, Revision 3 Regarding Control Room Envelopes Habitability ML0717901682007-06-28028 June 2007 Tech Spec Pages for Amendment 265 Regarding Technical Specification Change Related to the Revised Rule for Combustible Gas Control ML0703804842007-02-0505 February 2007 Technical Specification, System Leakage and Hydrostatic Testing Operation ML0635405782006-12-14014 December 2006 Tech Spec Pages for Amendment 263 Regarding Inoperability of Snubbers ML0632500392006-11-15015 November 2006 Technical Specifications, Revises TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation, to Eliminate the Main Steamline Radiation Monitor Trip Function NG-06-0472, Technical Specification Change Request (TSCR-083): Adoption of TSTF-478, Rev. 0, 'Bwr Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Affected Tech Specs: Section 3.6.3.1 and 3.6.3.22006-07-17017 July 2006 Technical Specification Change Request (TSCR-083): Adoption of TSTF-478, Rev. 0, 'Bwr Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Affected Tech Specs: Section 3.6.3.1 and 3.6.3.2 NG-06-0250, Technical Specification Change Request (TSCR-078): Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities, Affected Technical Specifications: Section 3.10.12006-03-0101 March 2006 Technical Specification Change Request (TSCR-078): Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities, Affected Technical Specifications: Section 3.10.1 ML0627102722006-01-27027 January 2006 Technical Specifications, Transfer of License to FPL Energy Duane Arnold, LLC ML0603201602006-01-27027 January 2006 Appendix B - Additional Conditions Operating License No. DPR-49 ML0517404312005-06-24024 June 2005 (TS) - Correction to Amendment No. 258 Dated May 12, 2005 ML0517503432005-06-23023 June 2005 Technical Specifications, Revised Action for Scram Discharge Volume Vent and Drain Values ML0513301812005-05-12012 May 2005 Technical Specifications, Issuance of Amendment to Revise the Technical Specifications by Adopting TSTF Nos. 273, 284, and 299 ML0503401522005-01-31031 January 2005 Technical Specifications, Deletion Requirements for Submittal of Occupational Radiation and Monthly Operating Reports ML0501200762005-01-10010 January 2005 TS Pages for Amendment 255 Regarding Technical Specifications Adopt TSTF-359, Increased Flexibility in Mode Restraints NG-04-0689, Application for Technical Specification Improvement to Revise the Required Action within TS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process2004-10-29029 October 2004 Application for Technical Specification Improvement to Revise the Required Action within TS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process ML0324004962003-08-25025 August 2003 Technical Specification Page, Updating Reactor Coolant System Pressure and Temperature Limit Curves (TS Figure 3.4.9-1) and Extends Applicability to 32 Effective full-power Years ML0314100482003-05-16016 May 2003 License Amendment 251, License Page 4a, Pertaining to Reactor Building Crane and single-failure Proof NG-03-0304, Revision of Technical Specification Change Request (TSCR-059A): Update to Reactor Coolant System Pressure and Temperature Limit Curves.2003-05-0202 May 2003 Revision of Technical Specification Change Request (TSCR-059A): Update to Reactor Coolant System Pressure and Temperature Limit Curves. NG-03-0332, 2002 Annual Radioactive Materials Release Report2003-04-30030 April 2003 2002 Annual Radioactive Materials Release Report ML0308505872003-03-21021 March 2003 TS Page for Amendment No. 249 ML0229501072002-10-28028 October 2002 Correction to Issuance of Amendment No. 248, TAC MB4269 ML0227703442002-10-0202 October 2002 Tech Spec for Amendment No. 248, Organization 5.2 for Duane Arnold ML0227703312002-10-0101 October 2002 Technical Specifications, Extends On-line Battery Replacement Time ML0210800482002-05-30030 May 2002 License Amendment No. 246, Issuance of Amendment Missed Surveillance, Consolidated Line Item Improvement 2021-05-13
[Table view] |
Text
Frequency 1.4 1.0 USE AND APPLICATION 1.4 Frequency PURPOSE The purpose of this section is to define the proper use and application of Frequency requirements.
DESCRIPTION Each Surveillance Requirement (SR) has a specified Frequency in which the Surveillance must be met in order to meet the associated LCO. An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.
The "specified Frequency" is referred to throughout this section and each of the Specifications of Section 3.0.
Surveillance Requirement (SR) Applicability. The "specified Frequency" consists of the requirements of the Frequency column of each SR. as well as certain Notes in the Surveillance column that modify performance requirements.
Sometimes special situations dictate when the requirements of a Surveillance are to be met. They are "otherwise stated" conditions allowed by SR 3.0.1. They may be stated as clarifying Notes in the Surveillance, as part of the Surveillance, or both.
Situations where a Surveillance could be required (i.e., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 3.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only "required" when it can be and should be performed. With an SR satisfied, SR 3.0.4 imposes no restriction.
The use of "met" or "performed" in these instances conveys specific meanings. A Surveillance is "met" only when the acceptance criteria are satisfied. Known failure of the requirements of a Surveillance, even without a Surveillance specifically being "performed," constitutes a Surveillance not "met." "Performance" refers only to the requirement to specifically determine the ability to meet the acceptance (continued)
DAEC 1.4-1 Amendment 258
Frequency 1.4 1.4 Frequency DESCRIPTION criteria. Some Surveillances contain notes that modify (continued) the Frequency of performance or the conditions during which the acceptance criteria must be satisfied. For these Surveillances, the MODE-entry restrictions of SR 3.0.4 may not apply. Such a Surveillance is not required to be performed prior to entering a MODE or other specified condition in the Applicability of the associated LCO if any of the following three conditions are satisfied:
- a. The Surveillance is not required to be met in the MODE or other specified condition to be entered; or
- b. The Surveillance is required to be met in the MODE or other specified condition to be entered, but has been performed within the specified Frequency (i.e.,
it is current) and is known not to be fail6d; or
- c. The Surveillance is required to be met, but not performed, in the MODE or other specified condition to be entered, and is known not to be failed.
Examples 1.4-3. 1.4-4, 1.4-5. and 1.4-6 discusses these special situations.
(continued) 1.4-2 Amendment 258 DAEC DAEC 1.4-2 Amendment 258
. 1. a;. . .
Frequency 1.4 1.4 Frequency EXAMPLES EXAMPLE 1.4-3 (continued)
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
NOTE-----------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 2 25% RTP.
Perform channel adjustment. 7 days The interval continues whether or not the unit operation is < 25% RTP between performances.
As the Note'modifies the required performance of the Surveillance, it is construed to be part of the "specified Frequency." Should the 7 day interval be exceeded while operation is < 25% RTP, this Note allows 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after power reaches 2 25% RTP to perform the Surveillance. The Surveillance is still considered to be within the "specified Frequency." Therefore, if the Surveillance were not performed within the 7 day interval (plus the extension allowed by SR 3.0.2). but operation was < 25%
RTP. it would not constitute a failure of the SR or failure to meet the LCO. Also, no violation of SR 3.0.4 occurs when changing MODES, even with the 7 day Frequency not met, provided operation does not exceed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with power > 25% RTP.
Once the unit reaches 25% RTP. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> would be allowed for completing the Surveillance. If the Surveillance were not performed within this 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval, there would then be a failure to perform a Surveillance within the specified Frequency, and the provisions of SR 3.0.3 would apply.
(continued)
DAEC 1.4-5 Amendment 258
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.1 Offsite Dose Assessment Manual (OD4M) (continued) markings in the margin of the affected pages, clearly indicating the area of the page that was changed, and shall indicate the date (i.e., month and year) the change was implemented.
5.5.2 Primary Coolant Sources Outside Containment This program provides controls to minimize leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to levels as low as practicable. The systems include Core Spray, HighWPressure Coolant Injection, Residual Heat Removal, Reactor Core Isolation Cooling. Reactor Water Cleanup (only to second isolation valve). Post Accident Sampling (until such time as a modification eliminates PASS as a potential leakage path),
Containment Atmospheric Monitoring. Control Rod Drive (scram discharge volume only) and Liquid Radwaste (only Reactor Building Floor and Equipment Drain sump pumps, piping, and tanks up to and including collector tanks). The program shall include the following:
- a. Preventive maintenance and periodic visual inspection requirements; ahd
- b. System leak test requirements for each system at least once per 24 months.
The provisions of SR 3.0.2 are applicable.
5.5.3 [Deleted]
(continued)
DAEC 5.0-8 Amendment 258
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.11 Safety Function Determination Prograi (SFDP) (continued)
- 2. Provisions for ensuring the plant is maintained in a safe condition if a loss of function condition exists;
- 3. Provisions to ensure that an inoperable supported system's Completion Time is not inappropriately extended as a result of multiple support system inoperabilities; and
- 4. Other appropriate limitations and remedial or compensatory actions.
- b. A loss of safety function exists when, assuming no concurrent single failure, no concurrent loss of offsite power or no concurrent loss of onsite diesel generator(s), a safety function assumed in the accident analysis cannot be performed. For the purpose of this program, a loss of safety function may exist when a support system is inoperable, and:
- 1. A required system redundant to system(s) supported by the inoperable support system is also inoperable; or
- 2. A required system redundant to systemts) in turn supported by the inoperable supported system is also inoperable; or
- 3. A required system redundant to support system(s) for the supported systems (1)and (2)above is also inoperable.
- c. The SFDP identifies where a loss of safety function exists.
If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of he LCO in which the loss of safety function exists are required to be entered. When a loss of safety function is caused by the inoperability of a single Technical Specification support system, the appropriate Conditions and Required Actions to enter are those of the support system.
5.5.12 Primary Containment Leakage Rate Testing Program A program shall be established to implement the leakage rate testing of the primary containment as required by 10 CFR 50.54(o) and 10 CFR 50, Appendix J, Option B. as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163. "Performance-Based Containment Leak-Test Program," dated September 1995, as modified (continued)