Technical Specifications, Issuance of Amendment Regarding License Amendment Request to Remove the Emergency Diesel Generator Surveillance Requirement for Preplanned Preventive Maintenance and Testing
ML082260135
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/09/2008
From:
Division of Operating Reactor Licensing
To:
Feintuch K, NRR/DORL/LPL3-1, 415-3079
Shared Package
ML082260041 List:
References
TAC MD8173
Download: ML082260135 (2)


Text

AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B13 Determine'OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG is not inoperable due to common cause failure.

AND


-------------- NOTE --------------

Not required to be performed when the cause of the inoperableDG is pre-planned, preventive maintenance and testing.

B.4 Perform SR 3.8.1.2 for Once per 72 OPERABLE DG. hours AND B.5 Restore DG to 7 days OPERABLE status.

AND 8 days from discovery of failure to meet LCO expect for Condition A

4. 4.

C. Two offsite circuits C.1 Declare required 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from inoperable. feature(s) inoperable discovery of Condition when the redundant C concurrent with required feature(s) are inoperability of inoperable. redundant required IV(oLUI tnud AND (continued)

DAEC 3.8-3 Amendment No. 270

AC Sources - Operating 3.8.1 CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2 Restore one offsite 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> circuit to OPERABLE status. AND 8 days from discovery of failure to meet LCO except for Condition A D. Two DGs inoperable. D.1 Restore one DG to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> OPERABLE status.

E. Required Action and E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time of Condition A, B, AND C, or D not met.

E.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F. Three or more AC F. 1 Enter LCO 3.0.3. Immediately sources inoperable.

DAEC 3.8-4 Amendment No. 270