ML082260135

From kanterella
Jump to navigation Jump to search

Technical Specifications, Issuance of Amendment Regarding License Amendment Request to Remove the Emergency Diesel Generator Surveillance Requirement for Preplanned Preventive Maintenance and Testing
ML082260135
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/09/2008
From:
Division of Operating Reactor Licensing
To:
Feintuch K, NRR/DORL/LPL3-1, 415-3079
Shared Package
ML082260041 List:
References
TAC MD8173
Download: ML082260135 (2)


Text

AC Sources -

Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.

(continued)

B13 Determine'OPERABLE DG is not inoperable due to common cause failure.

AND NOTE --------------

Not required to be performed when the cause of the inoperableDG is pre-planned, preventive maintenance and testing.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 7 days AND 8 days from discovery of failure to meet LCO expect for Condition A B.4 Perform SR 3.8.1.2 for OPERABLE DG.

AND B.5 Restore DG to OPERABLE status.

4.

4.

C.

Two offsite circuits inoperable.

C.1 Declare required feature(s) inoperable when the redundant required feature(s) are inoperable.

AND 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from discovery of Condition C concurrent with inoperability of redundant required IV(oLUI tnud (continued)

DAEC 3.8-3 Amendment No. 270

AC Sources -

Operating 3.8.1 CONDITION REQUIRED ACTION COMPLETION TIME C.

(continued)

C.2 Restore one offsite 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> circuit to OPERABLE status.

AND 8 days from discovery of failure to meet LCO except for Condition A D.

Two DGs inoperable.

D.1 Restore one DG to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> OPERABLE status.

E.

Required Action and E.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time of Condition A, B, AND C, or D not met.

E.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F.

Three or more AC F. 1 Enter LCO 3.0.3.

Immediately sources inoperable.

DAEC 3.8-4 Amendment No. 270