TS Pages for Amendment 255 Regarding Technical Specifications Adopt TSTF-359, Increased Flexibility in Mode Restraints
ML050120076
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/10/2005
From:
NRC/NRR/DLPM
To:
Beaulieu, David, NRR/DLPM, 415-3243
Shared Package
ML050120445 List:
References
TAC MC1711
Download: ML050120076 (15)


Text

LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (RCO)APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and LCO 3.0.7.

, I LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise )

stated.

LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a. MODE 2 within 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />;
b. MODE 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
c. MODE 4 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1, 2, and 3.

LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time; (continued)

DAEC 3.0-1 AMD 255

LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 b. After performance of a risk assessment addressing (continued) inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or

c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

I LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system LCO ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, an evaluation shall be performed in accordance with Specification 5.5.11, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.

(continued)

DAEC 3.0-2 AMID 255 1

SR Applicability 3.0 3.0 SR APPLICABILITY (continued)

SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

I DAEC 3.0-5 AM." 255 I

PAM Instrumentation 3.3.3.1 3.3 INSTRUMENTATION 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3.1 The PAM instrumentation for each Function in Table 3.3.3.1-1 shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS


----------------NOTE------------------------------------

Separate Condition entry is allowed for each Function. For Function 6, Separate I Condition entry is allowed for each penetration flow path.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable. status.

B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A Specification 5.6.6.

not met.

C. One or more Functions C.1 Restore one required 7 days with two required channel to OPERABLE channels inoperable. status.

(continued)

AMD 255 DAEC 3.3-21 I

Remote Shutdown System 3.3.3.2 3.3 INSTRUMENTATION 3.3.3.2 Remote Shutdown System LCO 3.3.3.2 The Remote Shutdown System Functions shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS Separate Condition entry is allowed for each Function. I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required 30 days Functions inoperable. Function to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.2.1 Verify each required control circuit and 24 months transfer switch is capable of performing the intended function.

(continued)

DAEC 3.3-25 AMD 255 l

LLS Instrumentation 3.3.6.3 3.3 INSTRUMENTATION 3.3.6.3 Low-Low Set CLLS) Instrumentation LCO 3.3.6.3 The LLS valve instrumentation for each Function in Table 3.3.6.3-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One LLS valve A.1 Restore channel(s) to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable due to OPERABLE status.

inoperable channel(s).

B. One or more Safety B.1 Restore channel(s) to Prior to I Relief Valves (SRVs) OPERABLE status. entering MODE 2 with one Function 3 or 3 from MODE 4 channel inoperable.

C. -------- NOTE-------- C.1 Restore at least two 14 days Separate Condition channels per SRV to entry is allowed for OPERABLE status.

each SRV.

One or more SRVs with two or more Function 3 channels inoperable.

(continued)

DAEC 3.3-66 AMD 255 1

RCS Leakage Detection Instrumentation 3.4.5 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Leakage Detection Instrumentation LCO 3.4.5 The following RCS leakage detection instrumentation shall be OPERABLE:

a. One channel of the Drywell Sump System; and
b. One channel of the Primary Containment Air Sampling System.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required Drywell Sump A.1 Restore required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> System inoperable. Drywell Sump System to OPERABLE status. Il B. Required Primary B.1 Initiate action to Immediately Containment Air restore required Sampling System Primary Containment inoperable. Air Sampling System to OPERABLE status.

(continued)

DAEC 3.4-10 I AMD 255

RCS Leakage Detection Instrumentation 3.4.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Drywell Sump C.1 Restore required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> System inoperable. Drywell Sump System to OPERABLE status.

AND DB Required Primary Containment C.2 Restore required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Air Sampling Primary Containment System inoperable. Air Sampling System to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or AND C not met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> DAEC 3.4-11 AIMD 255 1

RCS Specific Activity 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.6 RCS Specific Activity LCO 3.4.6 The specific activity of the reactor coolant shall be limited to DOSE EQUIVALENT 1-131 specific activity

  • 0.2 jCi/gm.

APPLICABILITY: MODE 1, MODES 2 and 3 with any main steam line not isolated.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor coolant -------------NOTE-----------

specific activity LCO 3.0.4.c is applicable.

> 0.2 liCi/gm and

< 2.0 pCi/gm DOSE EQUIVALENT I-131. A.1 Determine DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT I-131.

AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 to within limits.

B. Required Action and B.1 Determine DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion EQUIVALENT I-131.

Time of Condition A not met. AND DR B.2.1 Isolate all main 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> steam lines.

Reactor Coolant specific activity > 2.0 OR pCi/gm DOSE EQUIVALENT I-131.

(continued)

DAEC 3.4-13 AMD 255- I

RHR Shutdown Cooling System - Hot Shutdown 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown LCO 3.4.7 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.


NOTES--------------------------

1. Both required RHR shutdown cooling subsystems and recirculation pumps may not be in operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One required RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the performance of Surveillances.

APPLICABILITY: MODE 3, with reactor steam dome pressure < the RCIC Steam Supply Line Pressure - Low isolation pressure.

ACTIONS


NOTE----------------------------------

Separate Condition entry is allowed for each RHR shutdown cooling subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required A.1 Initiate action to Immediately RHR shutdown cooling restore required RHR subsystems inoperable. shutdown cooling subsystem(s) to OPERABLE status.

AND (continued)

DAEC 3.4-15 I AMD 255

ECCS- Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS - Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of four safety/relief valves shall be OPERABLE.

APPLICABILITY: MODE 1, MODES 2 and 3, except High Pressure Coolant Injection (HPCI) is not required to be OPERABLE with reactor steam dome pressure < 150 psig and ADS valves are not required to be OPERABLE with reactor steam dome pressure < 100 psig.

ACTIONS


NOTE-----------------------------------

LCO 3.0.4.b is not applicable to HPCI.

CONDITION REQUIRED ACTION COMPLETION TIME A. One Residual Heat A.1 Restore RHR pump to 30 Days Removal (RHR) pump OPERABLE status.

inoperable.

B. One low pressure ECCS B.1 Restore low pressure 7 days subsystem inoperable ECCS subsystem to for reasons other than OPERABLE status.

Condition A.

C. One Core Spray C.1 Restore Core Spray 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> subsystem inoperable. subsystem to OPERABLE AND status.

One or two RHR pump(s) OR inoperable. C.2 Restore RHR pump(s) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to OPERABLE status.

D. Both Core Spray D.1 Restore one Core 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> subsystems inoperable. Spray subsystem to OPERABLE status.

(continued)

DAEC 3.5-1 AMD 255

RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE.

APPLICABILITY: MODE 1, MODES 2 and 3 with reactor steam dome pressure > 150 psig.

ACTIONS


NOTE-------------------------------

LCO 3.0.4.b is not applicable to RCIC.

CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System A.1 Verify by Immediately inoperable. administrative means High Pressure Coolant Injection System is OPERABLE.

ANED A.2 Restore RCIC System 14 days to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND B.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> dome pressure to

  • 150 psig.

DAEC 3.5-12 AMD 255-.

RHRSW System 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LCO 3.7.1 Two RHRSW subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHRSW pump A.1 Restore RHRSW pump to 30 days I inoperable. OPERABLE status.

B. One RHRSW pump in each B.1 Restore one RHRSW 7 days subsystem inoperable. pump to OPERABLE status.

C. One RHRSW subsystem C.1 ---- NOTE--------

inoperable for reasons Enter applicable other than Conditions and Condition A. Required Actions of LCO 3.4.7, "Residual Heat Removal (RHR)

Shutdown Cooling System-Hot Shutdown,"

for.RHR shutdown cooling made inoperable by RHRSW System.

Restore RHRSW 7 days subsystem to OPERABLE status.

(continued)

DAEC 3.7-1 AMD 255 I

CBC System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Control Building Chiller (CBC) System LCO 3.7.5 Two CBC subsystems shall be OPERABLE.

APPLICABILITY: MODES 1. 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During Operations with a Potential for Draining the Reactor Vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CBC subsystem A.1 Restore CBC subsystem 30 days I inoperable. to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AND not met in MODE 1, 2, or 3. B.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

I DAEC 3.7-11 A¢^D 255 I

AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources - Operating LCO 3.8.1 The following AC electrical power sources shall be OPERABLE:

a. Two qualified circuits between the offsite transmission network and the onsite Class lE AC Electrical Power Distribution System; and
b. Two diesel generators (DGs).

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOTE----------------------------------

LCO 3.0.4.b is not applicable to DGs.

CONDITION REQUIRED ACTION COMPLETION TIME A. One offsite circuit A.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. for OPERABLE offsite circuit. AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter AND A.2 Restore offsite Prior to circuit to OPERABLE entering MODE 2 status. from MODE 3 or 4 (continued)

DAEC 3.8-1 AMD 255 1