ML051750343

From kanterella
Jump to navigation Jump to search

Technical Specifications, Revised Action for Scram Discharge Volume Vent and Drain Values
ML051750343
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/23/2005
From:
NRC/NRR/DLPM
To:
Spaulding D, NRR/DE/EEIB, 415-2928
Shared Package
ML051750031 List:
References
TAC MC5136
Download: ML051750343 (1)


Text

SDV Vent and Drain Valves 3.1.8 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves LCO 3.1.8 Each SDV vent and drain valve shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS


NOTES-----------------------------------

1. Separate Condition entry is allowed for each SDV vent and drain line.
2. An isolated line may be unisolated under administrative control to allow draining and venting of the SDV.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SDV vent A.1 Isolate the 7 days or drain lines with associated line.

pne valve inoperable.

B. One or more SDV vent B.1 Isolate the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or drain lines with associated line.

both valves inoperable.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

DAEC 3.1-25 DE35A dt ib. 259