ML063250039

From kanterella
Jump to navigation Jump to search

Technical Specifications, Revises TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation, to Eliminate the Main Steamline Radiation Monitor Trip Function
ML063250039
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 11/15/2006
From: Richard Ennis
NRC/NRR/ADRO/DORL/LPLIII-1
To: Vanmiddlesworth G
Florida Power & Light Co
R. Ennis
Shared Package
ML063100635 List:
References
TAC MC8883
Download: ML063250039 (1)


Text

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page I of 5)

Primary Containment Isolation instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE

1. Main Steam Line Isolation
a. Reactor Vessel Water 1,2,3 2 D SR 3.3.6.1.1 > 38.3 inches Level - Low Low Low SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9
b. Main Steam Line 1 2 E SR 3.3.6.1.4 > 821 pslg Pressure - Low SR 3.3.6.1.5 SR 3.3.6.1.9
c. Main Steam Line 1,2,3 2 per D SR 3.3.6.1.1 < 138% rated Flow - High MSL SR 3.3.6.1.4 steam flow SR 3.3.6.1.5 SR 3.3.6.1.9
d. Condenser 1, 2(a), 2 D SR 3.3.6.1.4 > 7.2 inches Backpressure - High (a) SR 3.3.6.1.8 Hg vacuum 3 SR 3.3.6.1.9
e. Main Steam Une Tunnel 1,2,3 4 D SR 3.3.6.1.2 < 205.1°F Temperature - High SR 3.3.6.1.4 SR 3.3.6.1.7 SR 3.3.6.1.9 I
f. Turbine Building 1,2,3 4 D SR 3.3.6.1.2 < 205.1°F Temperature - High SR 3.3.6.1.4 SR 3.3.6.1.7 SR 3.3.6.1.9 (continued)

(a) When any turbine stop valve is greater than 90% open or when the key-locked bypass switch Is In the NORM Position.

DAEC 3.3-57 Amendment No. 261