Letter Sequence Response to RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report, 3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re, 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip., 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C, 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip, 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250, ML11259A012, ML11300A226, ML11342A195, ML12031A032, ML12053A231, ML12107A068, ML12202A734, ML12205A357, ML12205A358, ML12240A119, ML12255A409, ML12262A385, ML12314A391, ML12314A392, ML12314A393, ML13032A540
|
MONTHYEAR3F0811-04, Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-02, Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-01, Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-18018 August 2011 Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-03, Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-25025 August 2011 Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11259A0122011-09-14014 September 2011 NRR E-mail Capture - Clarification for August 25 Emcb RAI Acceptance Review Letter Project stage: Other ML11286A0922011-10-11011 October 2011 Response to Request for Additional Information to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11300A2262011-10-25025 October 2011 Feedwater Line Break Overpressure Protection Analysis to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Update LAR and LAR Approval Schedule Project stage: Other 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip Project stage: Other ML11326A2312011-12-0707 December 2011 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 Project stage: Other 3F1211-05, Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F1211-06, Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F1211-10, Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-21021 December 2011 Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-04, Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12030A2092012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Instrumentation and Control Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11342A1952012-01-0606 January 2012 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-safeguards Information Project stage: Other ML12024A3002012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Component Performance and Testing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-06, Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report2012-01-31031 January 2012 Corrections to the Extended Power Uprate LAR #309 Vendor Affidavit and Technical Report Project stage: Other ML12003A2172012-02-0808 February 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12052A1302012-03-0202 March 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12053A2312012-03-0202 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related Extended Power Uprate Technical Report Project stage: Other 3F0312-02, Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR2012-03-19019 March 2012 Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0312-01, Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-03-22022 March 2012 Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12031A0322012-03-26026 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related to Extended Power Uprate Technical Report Project stage: Other ML12107A0682012-04-0404 April 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (Eptb) Project stage: Other 3F0412-05, Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0412-04, Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-07, Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-12012 April 2012 Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-06, Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-16016 April 2012 Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-09, Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-26026 April 2012 Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12102A0442012-05-0404 May 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 Project stage: Other ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. Project stage: Other 3F0612-05, Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-06-18018 June 2012 Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. Project stage: Other ML12184A3442012-07-0202 July 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Discussion/Clarification of Emcb Draft RAIs Project stage: Draft Other ML12174A2922012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12171A3472012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12205A3562012-07-17017 July 2012 Supplement to the Extended Power Uprate License Amendment Request #309 Project stage: Supplement 3F0712-06, Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-17017 July 2012 Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request ML12194A4172012-07-17017 July 2012 Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0712-07, Response to Third Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-31031 July 2012 Response to Third Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0712-08, Response to Second Request for Additional Information to Support NRC PRA Licensing Branch (Apla) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-31031 July 2012 Response to Second Request for Additional Information to Support NRC PRA Licensing Branch (Apla) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request ML12125A1622012-08-0101 August 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12202A7342012-08-0101 August 2012 Request for Withholding Proprietary Information from Public Disclosure Related to Extended Power Uprate Technical Report Project stage: Other ML12202A0602012-08-0202 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12213A3032012-08-0303 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request (Srxb) Project stage: RAI ML12219A1912012-08-16016 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0812-02, Response to Second Request for Additional Information to Support NRC Electrical Engineering Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR2012-08-21021 August 2012 Response to Second Request for Additional Information to Support NRC Electrical Engineering Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 2012-03-26
[Table View] |
|
---|
Category:Letter type:
MONTHYEAR3F0824-01, Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 52024-08-21021 August 2024 Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5 3F0824-02, Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 2622024-08-12012 August 2024 Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 262 3F0624-02, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-06-13013 June 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0624-01, Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 20242024-06-11011 June 2024 Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 2024 3F0524-03, Annual Financial Report and Certified Financial Statement2024-05-30030 May 2024 Annual Financial Report and Certified Financial Statement 3F0524-01, Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan2024-05-0909 May 2024 Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan 3F0424-03, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report 3F0424-02, – 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 – 2023 Annual Radioactive Effluent Release Report 3F0424-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-12012 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0224-04, Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 42024-02-23023 February 2024 Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 4 3F0224-05, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-22022 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0224-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-0808 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0124-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-19019 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0124-01, Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version)2024-01-18018 January 2024 Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version) 3F0623-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-06-0101 June 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0423-03, 2022 Annual Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Annual Radiological Environmental Operating Report 3F0423-02, 2022 Annual Radioactive Effluent Release Report2023-04-18018 April 2023 2022 Annual Radioactive Effluent Release Report 3F0423-01, 2022 Individual Monitoring NRC Form 5 Report2023-04-0404 April 2023 2022 Individual Monitoring NRC Form 5 Report 3F0323-03, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2023-03-31031 March 2023 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation 3F0323-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20222023-03-29029 March 2023 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2022 3F0323-01, Onsite Property Insurance Coverage2023-03-0202 March 2023 Onsite Property Insurance Coverage 3F0123-01, Proof of Financial Protection2023-01-26026 January 2023 Proof of Financial Protection 3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan2022-12-12012 December 2022 Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan 3F0522-03, Notification of Revised Decommissioning Cost Estimate2022-05-26026 May 2022 Notification of Revised Decommissioning Cost Estimate 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0422-02, 2021 Annual Radiological Environmental Operating Report2022-04-0606 April 2022 2021 Annual Radiological Environmental Operating Report 3F0322-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20212022-03-30030 March 2022 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2021 3F0322-03, Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1)2022-03-10010 March 2022 Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1) 3F0322-02, 2021 Individual Monitoring NRC Form 5 Report2022-03-0707 March 2022 2021 Individual Monitoring NRC Form 5 Report 3F0222-01, ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2022-02-0909 February 2022 ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) 3F0222-02, Onsite Property Insurance Coverage2022-02-0909 February 2022 Onsite Property Insurance Coverage 3F0122-01, License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications2022-01-26026 January 2022 License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications 3F0122-02, Proof of Financial Protection2022-01-17017 January 2022 Proof of Financial Protection 3F0122-03, Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report2022-01-17017 January 2022 Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report 3F1021-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-10-21021 October 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0921-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C)2021-09-29029 September 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C) 3F0921-01, To License Amendment Request, Revision 0, ISFSI Security Plan, Revision a2021-09-14014 September 2021 To License Amendment Request, Revision 0, ISFSI Security Plan, Revision a 3F0721-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-07-13013 July 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0621-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S2021-06-16016 June 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S 3F0421-05, 2020 Individual Monitoring NRC Form 5 Report2021-04-27027 April 2021 2020 Individual Monitoring NRC Form 5 Report 3F0421-04, ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2021-04-13013 April 2021 ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0421-03, Proof of Financial Protection2021-04-0707 April 2021 Proof of Financial Protection 3F0421-01, 2020 Annual Radioactive Effluent Release Report2021-04-0606 April 2021 2020 Annual Radioactive Effluent Release Report 3F0421-02, 2020 Annual Radiological Environmental Operating Report2021-04-0606 April 2021 2020 Annual Radiological Environmental Operating Report 3F0321-07, (XEG)-DOE/NRC Forms 741 742 and 743C2021-03-30030 March 2021 (XEG)-DOE/NRC Forms 741 742 and 743C 3F0321-06, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20202021-03-29029 March 2021 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2020 3F0321-01, License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual2021-03-17017 March 2021 License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual 3F0321-02, License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a2021-03-17017 March 2021 License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a 3F0321-05, Onsite Property Insurance Coverage2021-03-15015 March 2021 Onsite Property Insurance Coverage 3F0321-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-03-0909 March 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 2024-08-21
[Table view] Category:Report
MONTHYEAR3F0324-03, Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information2024-03-31031 March 2024 Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information ML24090A0042024-03-29029 March 2024 Enclosure 6, Part 1: Crystal River, Unit 3 - Appendix E – CHAR-05 Site Characterization of Buildings ML24030A7472024-02-13013 February 2024 Audit Report Attachment - Crystal River Unit 3 Nuclear Generating Plant LTP ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24090A0052023-10-10010 October 2023 Enclosure 6, Part 2: Crystal River, Unit 3, DD Survey 23-10-0096 ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23160A2972023-06-0909 June 2023 CR3 Site Characterization Survey Report (CHAR-01) Impacted Open Land Survey Areas 3F0623-02, Maintenance Support Building2023-06-0909 June 2023 Maintenance Support Building ML23160A2982023-06-0909 June 2023 Site Characterization Surveys ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0520-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20202020-05-18018 May 2020 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2020 3F0320-01, NRC Commitment Change Report - March 20202020-03-17017 March 2020 NRC Commitment Change Report - March 2020 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex ML19022A0762019-01-22022 January 2019 Partial Site Release Request ML19029A0092018-11-0707 November 2018 Reference 16 - Defueled Safety Analysis Report DSAR-R002 ML18303A2942018-06-21021 June 2018 Golder Associates, Inc. - Citrus Combined Cycle Project - CFR 122.21(r) Report 3F0518-03, Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20182018-05-24024 May 2018 Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2018 ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML19029A0102016-06-28028 June 2016 Reference 3 - Crystal River, Unit 3, Historical Site Assessment Rev. 00 3F0616-02, Nrg Commitment Change Report - June 20162016-06-14014 June 2016 Nrg Commitment Change Report - June 2016 ML13343A1782013-12-31031 December 2013 Report P23-1680-001, Rev. 0, Site-Specific Decommissioning Cost Estimate for Crystal River Unit 3 Nuclear Generating Plant. 3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re2013-01-31031 January 2013 Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Res 3F1112-01, Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan2012-11-0707 November 2012 Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 2502012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250 ML12314A3932012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 81 of 250 Through Page 173 of 250 ML12314A3922012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 1 of 250 Through Page 80 of 250 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C2012-09-30030 September 2012 ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. ML12284A1382012-05-25025 May 2012 Report EGS-TR-HC589-01, Seismic Qualification Test Report for Structural Verification Testing of Iccms Cabinet Assembly. 3F0512-01, NRC Commitment Change Report - May 20122012-05-14014 May 2012 NRC Commitment Change Report - May 2012 3F0112-04, Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 3F1211-14, Summary of Changes to Evaluation Models and Peak Cladding Temperature for Large Break Loss of Coolant Analysis and Small Break Loss of Coolant Analysis2011-12-14014 December 2011 Summary of Changes to Evaluation Models and Peak Cladding Temperature for Large Break Loss of Coolant Analysis and Small Break Loss of Coolant Analysis 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip ML11237A0682011-08-0505 August 2011 Siemens Technical Report CT-27438, Missile Probability Analysis Report Progress Energy Crystal River 3, Revision 1A ML11207A4442011-06-15015 June 2011 Attachment 7- Crystal River Unit 3 Extended Power Uprate Technical Report 3F0511-02, Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models2011-05-0606 May 2011 Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models ML1101906672010-10-0404 October 2010 Levy, Units 1 and 2, Cola (Sensitive Material), Rev. 2 - Levy County Emergency Plan Part 02 - Draft (Redacted) 3F0910-01, CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis2010-09-0808 September 2010 CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis ML1019304172010-05-0606 May 2010 Tritium Database Report ML1010603472010-04-0909 April 2010 5.2.2.4.4. Quality Control and Nondestructive Testing ML1028710882010-03-12012 March 2010 7.6 Vibration Due to Cutting Tendons ML1028711112010-02-25025 February 2010 7.11 Added Stress from Pulling Tendons ML1028711102010-02-23023 February 2010 6.3 Thermal Effects of Greasing ML1028804682010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 3 ML1028711212010-02-19019 February 2010 7.10 Hydrodemolition Induced Cracking 2024-03-31
[Table view] Category:Miscellaneous
MONTHYEARML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum 3F0616-02, Nrg Commitment Change Report - June 20162016-06-14014 June 2016 Nrg Commitment Change Report - June 2016 3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re2013-01-31031 January 2013 Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Res 3F0512-01, NRC Commitment Change Report - May 20122012-05-14014 May 2012 NRC Commitment Change Report - May 2012 3F0112-04, Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR 3F1211-14, Summary of Changes to Evaluation Models and Peak Cladding Temperature for Large Break Loss of Coolant Analysis and Small Break Loss of Coolant Analysis2011-12-14014 December 2011 Summary of Changes to Evaluation Models and Peak Cladding Temperature for Large Break Loss of Coolant Analysis and Small Break Loss of Coolant Analysis 3F0511-02, Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models2011-05-0606 May 2011 Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models 3F0910-01, CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis2010-09-0808 September 2010 CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis ML1019304172010-05-0606 May 2010 Tritium Database Report ML1028710882010-03-12012 March 2010 7.6 Vibration Due to Cutting Tendons ML1028711112010-02-25025 February 2010 7.11 Added Stress from Pulling Tendons ML1028711102010-02-23023 February 2010 6.3 Thermal Effects of Greasing ML1028702742010-02-0606 February 2010 6.4 Rigid and Flexible Sleeves ML1028804952010-01-20020 January 2010 5.3 Exhibit 1 Interviews Regarding Maintenance ML1028708922010-01-16016 January 2010 Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com' Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:10 PM Subject: Failure Mode 5.1 for Review and Comment ML1028709832010-01-12012 January 2010 from: Thomas, George to: Naus, Dan J. CC: Lake, Louis Dated Tuesday, January 12, 2010 3:57 PM Subject: FW: Petrographic Report ML1028709862010-01-12012 January 2010 Email - from Thomas, George to Naus, Dan J. Cc: Lake, Louis Dated Tuesday, January 12, 2010 3:56 PM Subject: FW: Petrographic Report Attachments: S&Me Modulus Core 16, 40, 63, 65, 66.pdf; S&Me Density Core 16, 40, 60, 63, 65, 66.pdf... ML1028709792010-01-12012 January 2010 Email - from: Thomas, George to: Naus, Dan J. CC: Lake, Louis Dated Tuesday, January 12, 2010 3:59 PM Subject: FW: Petrographic Report ML1028710352010-01-11011 January 2010 Email - from: Williams, Charles R. to: Lake, Louis; Thomas, George; Carrion, Robert; 'Nausdj@Ornl.Gov'; 'Daniel.Fiorello@Exeloncorp.Com'; Lese, Joseph A. Cc: Miller, Craig L (Charles.Williams@Pgnmail.Com) Dated Monday, January 11, 2010 5:38 ML1028710342010-01-11011 January 2010 Email - from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to Lake, Louis; Thomas, George; 'Nausdj@Ornl.Gov'; Carrion, Robert; Souther, Martin; 'Trowe@Wje.Com' Dated Monday, January 11, 2010 5:42 PM Subject: Fm 5.4 Draft for Review ML1028709902010-01-11011 January 2010 Email - from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to Lake, Louis; Thomas, George; 'Nausdj@Ornl.Gov'; Carrion, Robert; Souther, Martin; 'Archer, John C. (Reading)'; 'Wells, Richard P. (Reading)' Cc: Miller, Craig L Subject: F ML1028710402010-01-0606 January 2010 Email - from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to: Lake, Louis; Thomas, George; 'Nausdj@Ornl.Gov'; Carrion, Robert; Souther, Martin; 'Trowe@Wje.Com' Cc: Miller, Craig L Dated Wednesday, January 06, 2010 4:51 PM, Subject: ML1028710462010-01-0101 January 2010 5.5 Exhibit 3a Petrographic Erlin Hime May 19 ML1028710492009-12-31031 December 2009 Email - from: Williams, Charles R. Charles.Williams@Pgnmail.Com) to: Lake, Louis; Thomas, George; 'Nausdj@Ornl.Gov'; Carrion, Robert; Miller, Craig L Dated Thursday, December 31, 2009 5:20 PM Subject: Fm 9.3 Draft and Exhibits for Review ML1029106012009-12-23023 December 2009 5.8 Exhibit 5a Petrographic ML1029106322009-12-18018 December 2009 from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Lake, Louis;Thomas, George; Nausdj@Ornl.Gov; Carrion, Robert Cc: Williams, Charles R. Dated Friday, December 18, 2009 4:47 PM Subject: Draft Fm 3.5 for Review Attachments: Fm 3.5.pptx; Fm 3F1209-11, 10 CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report2009-12-16016 December 2009 10 CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report ML1029107052009-12-11011 December 2009 5.2 Exhibit 2 Mactec Petrographic ML1029201382009-12-0808 December 2009 5.1 Exhibit 6A Petrographic Mactec ML1029201442009-12-0808 December 2009 5.8 Exhibit 5b Petrographic ML1029107272009-10-27027 October 2009 Summary of Results from Comparison.Pdf ML1029205002009-10-13013 October 2009 Condition Report Summary -NCRs Initiated Since Oct 12, 2009 ML1007504262009-10-12012 October 2009 Summary Report ML1028804902009-10-0505 October 2009 Condition Report Summary - Ncrs Initiated Since Sep 28, 2009 ML1029201092009-02-0404 February 2009 5.6 Exhibit 8 Cap Grease Leakage ML1029201072009-02-0404 February 2009 5.6 Exhibit 5 Surveillance Conclusion 3F0508-14, NRC Commitment Change Report - May 20082008-05-28028 May 2008 NRC Commitment Change Report - May 2008 3F1207-03, Engineering Report ER-608NP, Revision 2, LEFM + Meter Factor Calculation and Accuracy Assessment for Crystal River Unit 3 Nuclear Power Station.2007-12-13013 December 2007 Engineering Report ER-608NP, Revision 2, LEFM + Meter Factor Calculation and Accuracy Assessment for Crystal River Unit 3 Nuclear Power Station. ML0731103812007-05-21021 May 2007 Progress Energy Florida, Inc. Proposed Florida Nuclear Site Transmission Planning Study, Final Report, Attachments Dand F Included 3F1205-04, 10 CFR 50.46 Loss-Of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report2005-12-12012 December 2005 10 CFR 50.46 Loss-Of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report 3F1205-03, Special Report 05-01: Once-Through Steam Generator (OTSG) Notifications Required Prior to Mode 42005-12-0303 December 2005 Special Report 05-01: Once-Through Steam Generator (OTSG) Notifications Required Prior to Mode 4 ML0613806752005-12-0101 December 2005 Report of Independent Auditors ML0613806782005-09-30030 September 2005 Financial Highlights ML0524401902005-08-10010 August 2005 Attachment E, Crystal River Unit 3 - License Amendment Request #290, Revision 1 Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack ML0505301682005-02-17017 February 2005 Background Discussion Material for February 24-25, 2005 NRC Meeting Relating to Replacement for BAW-2374, Revision 1, Evaluation of OTSG Thermal Loads During Hot Leg Loca. ML0318909362003-07-10010 July 2003 Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Brunswick, Crys 3F1102-08, Sea Turtle Mortality Report Submitted to the U. S. National Marine Fisheries Service2002-11-19019 November 2002 Sea Turtle Mortality Report Submitted to the U. S. National Marine Fisheries Service ML0300701722002-10-25025 October 2002 Summary Report - Ncrs Initiated Since 10/18/2002 3F0902-09, Submittal of Core Operating Limits Report, Cycle 13, Revision 1, for Crystal River Unit 32002-09-24024 September 2002 Submittal of Core Operating Limits Report, Cycle 13, Revision 1, for Crystal River Unit 3 ML0300701742002-09-23023 September 2002 Summary Report - Ncrs Initiated Since 09/16/2002 2016-06-14
[Table view] |
Text
Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 January 5, 2012 3F01 12-04 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR (TAC No. ME6527)
References:
- 1. CR-3 to NRC letter dated June 15, 2011, "Crystal River Unit 3 - License Amendment Request #309, Revision 0, Extended Power Uprate" (Accession No. ML112070659)
- 2. NRC to CR-3 letter dated December 7, 2011, "Crystal River Unit 3 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request (TAC No. ME6527)" (Accession No. ML11326A231)
Dear Sir:
By letter dated June 15, 2011, Florida Power Corporation, doing business as Progress Energy Florida, Inc., requested a license amendment to increase the rated thermal power level of Crystal River Unit 3 (CR-3) from 2609 megawatts (MWt) to 3014 MWt. On December 7, 2011, the NRC provided a request for additional information (RAI) required to complete its evaluation of the CR-3 Extended Power Uprate (EPU) License Amendment Request (LAR).
The attachment, "Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 EPU LAR," provides the CR-3 formal response to the RAI needed to support the Steam Generator Tube Integrity and Chemical Engineering Branch (ESGB) technical review of the CR-3 EPU LAR.
In support of the ESGB technical review RAI response, an enclosure, "Wear Rate Analysis:
Combined Summary Report," is being provided which contains a sample list of components for which wall thinning is predicted and measured by ultrasonic testing.
This correspondence contains no new regulatory commitments.
Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428
U.S. Nuclear Regulatory Commission Page 2 of 3 3F0112-04 If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Superintendent, Licensing and Regulatory Programs at (352) 563-4796.
Sincerel Jon . a e e President rystal River Nuclear Plant JAF/gwe
Attachment:
Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 EPU LAR
Enclosure:
Wear Rate Analysis: Combined Summary Report xc: NRR Project Manager Regional Administrator, Region II Senior Resident Inspector State Contact
U.S. Nuclear Regulatory Commission Page 3 of 3 3F0112-04 STATE OF FLORIDA COUNTY OF CITRUS Jon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation, doing business as Progress Energy Florida, Inc.; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and on A. Franke Vice President Crystal River Nuclear Plant The foregoing document was acknowledged before me this _-_,_ day of
'ja* t4,- 2012, by Jon A. Franke.
-- Signature of Notary Public
ýilýCHARLENE yMILLER PState of Florida t Notary Public S State of Florida My Comm. Expires Nov 12, 20121
" Sandd Through National Notary Assn.
(Print, type, or stamp Commissioned Name of Notary Public)
Personally Produced Known _ -OR- Identification
FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 /LICENSE NUMBER DPR-72 ATTACHMENT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION TO SUPPORT NRC STEAM GENERATOR TUBE INTEGRITY AND CHEMICAL ENGINEERING BRANCH TECHNICAL REVIEW OF THE CR-3 EPU LAR
U. S. Nuclear Regulatory Commission Attachment 3F01 12-04 Page 1 of 4 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION TO SUPPORT NRC STEAM GENERATOR TUBE INTEGRITY AND CHEMICAL ENGINEERING BRANCH TECHNICAL REVIEW OF THE CR-3 EPU LAR By letter dated June 15, 2011, Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc., requested a license amendment to increase the rated thermal power level of Crystal River Unit 3 (CR-3) from 2609 megawatts (MWt) to 3014 MWt. On December 7, 2011, the NRC provided a request for additional information (RAI) required to complete its evaluation of the CR-3 Extended Power Uprate (EPU) License Amendment Request (LAR). The following provides the CR-3 formal response to the RAI needed to support the Steam Generator Tube Integrity and Chemical Engineering Branch (ESGB) technical review of the CR-3 EPU LAR.
For tracking purposes, each item related to this RAI is uniquely identified as ESGB X-Y, with X indicating the RAI set and Y indicating the sequential item number.
Steam Generator Tube Integrity and Chemical Engineering Branch (ESGB)
- 26. (ESGB 1-1)
On page 2.1.7-2 of attachment 5 of its letter dated June 15, 2011, the licensee stated that a new design-basis accident (DBA) test was performed to qualify the use of the Carboline Carboguard 2011 SN surface topcoated with Carboline Carboguard 890N for concrete substrates. It was demonstrated that the DBA qualification test report provides the basis for qualification for these coating systems and bounds EPU conditions. Please clarify whether all Service Level 1 coatings have been qualified to meet design basis LOCA containment EPU conditions for temperature, pressure and radiation.
Response
As noted in Section 2.1.7, "Protective Coating Systems (Paints) - Organic Materials," of the EPU Technical Report (TR) (Reference 1, Attachments 5 and 7) the 1990 DBA test was performed for previous coating products approved for application in the CR-3 Reactor Building.
Afterward, following the CR-3 response to Generic Letter 98-04, "Potential for Degradation of the Emergency Core Cooling System and the Containment Spray System After a Loss-Of-Coolant Accident Because of Construction and Protective Coating Deficiencies and Foreign Material in Containment," FPC qualified an additional coating system; Carboguard 2011 SN surfacer topcoated with Carboguard 890N.
The sentence in subsection, "Description of Analyses and Evaluations," of Section 2.1.7: "Based on the higher pressure, temperature, and accumulated dose used for the Carboguard2011SN DBA test, this test is considered to be the most limiting DBA test, " infers, based on the grammatical reading, that the Carboguard 2011 SN DBA test is the most limiting test described in the remainder of Section 2.1.7. This was not the intended meaning. To clarify, the more limiting test denotes the 1990 DBA test and is the limiting test described in the remainder of Section 2.1.7. This administrative error was entered into the vendor's corrective action program in December 2011 and does not affect the conclusions regarding the qualification of the CR-3 containment protective coatings at EPU conditions.
The DBA test profiles identified in Figures 2.1.7-1 and 2.1.7-2, and the accumulated radiation dose of 1.80 E+08 rads cited in Section 2.1.7, were obtained from the 1990 DBA test report. The
U. S. Nuclear Regulatory Commission Attachment 3F01 12-04 Page 2 of 4 1990 DBA protective coating test is considered a more severe test of pressure and temperature conditions than those predicted in the containment during a design basis Loss-of-Coolant Accident (LOCA) at EPU conditions. Additionally, as noted in Section 2.1.7, the accumulated radiation exposure of the 1990 DBA protective coating test is greater than the 40-year predicted accumulated radiation exposure for the EPU condition. Thus, the Service Level 1 coatings at CR-3 are qualified to withstand the containment temperature, pressure, and radiation conditions during a design basis LOCA at EPU conditions.
- 27. (ESGB 1-2)
On page 2.8.6.2-1 of Attachment 5 of its letter dated June 15, 2011, the licensee stated that Spent Fuel Pools A and B utilize boron carbide and Boral, respectively, as the neutron absorbing materials at CR-3. It is not clear to the staff what surveillance approach will be implemented and how it will demonstrate that the neutron absorbing materials will continue to perform their intended function. As such, please discuss in detail the surveillance approach that will be used for monitoring the neutron absorber materials, specifically the methods of neutron attenuation testing, frequency of inspection, sample size, data collection, and acceptance criteria.
Response
The Fuel Pool Rack Neutron Absorber Monitoring Program is an existing CR-3 program that manages the effects of aging on the Carborundum (B4 C) panels located in the high density spent fuel storage racks in Spent Fuel Pool A and Boral panels located in the high density spent fuel storage racks in Spent Fuel Pool B. No change is proposed regarding a CR-3 Fuel Pool Rack Neutron Absorber Monitoring Program as part of the EPU LAR.
The details of this monitoring program, including the methods of neutron attenuation testing, frequency of inspection, sample size, data collection, and acceptance criteria, have been provided to the NRC in a CR-3 letter dated January 27, 2010 (Reference 2). Also, FPC has committed to enhance the administrative controls for the CR-3 Fuel Pool Rack Neutron Absorber Monitoring Program as part of the License Renewal LAR. To avoid duplication of NRC reviews regarding a Fuel Pool Rack Neutron Absorber Monitoring Program, FPC proposes to not address it further as part of the CR-3 EPU LAR review.
In addition, to ensure compliance with 10 CFR 50.68(b)(4) at EPU conditions, CR-3 proposes a change to the Applicability of Improved Technical Specification (ITS) 3.7.14, "Spent Fuel Pool Boron Concentration." As described in Table 1, "CR-3 Operating License and Technical Specification Technical Changes," of the CR-3 EPU LAR Attachment 1 (Reference 1), this change is made to require spent fuel pool boron concentration to be maintained > 1925 ppm at all times while fuel assemblies are stored in the spent fuel pool to ensure both CR-3 fuel storage pools remain subcritical under CR-3 licensing basis conditions. The amount of soluble boron required to maintain the spent fuel storage rack multiplication factor, keff, < 0.95 with the worst case misloaded fuel assembly is > 198 ppm in Pool A and > 571 ppm in Pool B. As such, the limit of 1925 ppm specified in ITS 3.7.14 provides adequate margin to assure kff is maintained within 10 CFR 50.68(b)(4) limits significantly reducing reliance on neutron absorbing materials within the spent fuel racks.
- 28. (ESGB 1-3)
U. S. Nuclear Regulatory Commission Attachment 3F0112-04 Page 3 of 4 In its letter dated, June 15, 2011, the licensee stated the following about the flow accelerated corrosion (FAC) program for CR-3:
If a component is considered susceptible to FAC but cannot be inspected, it is analytically evaluated using the CHECKWORKS Pass 2 results. The analytical predictions are then compared to actual wear rate resultsfor actually inspected, usually adjacent, components which have the same fluid conditions. These results are used to trend the un-inspected component and ifpossible, a visual inspection to confirm them.
The CHECWORKS Pass 2 analysis uses plant inspection data to refine the Pass 1 wear rate predictions. Please explain how a component can be analytically evaluated using the CHECWORKS Pass 2 results from a different component.
Response
The purpose of a Pass 2 analysis is to adjust the values predicted by the empirical model to more closely correlate to plant inspection data. This adjustment is made by the application of the Line Correction Factor (LCF). The LCF is established by comparing the value of measured wear with the value of predicted wear within a run definition. Once the LCF for a run definition has been determined, the predicted values for inspected and un-inspected components are adjusted by the LCF. By adjusting the Pass 1 predictions to more closely approximate plant inspection data, the Pass 2 analysis provides analytical results that can be used to trend remaining life for un-inspected components.
- 29. (ESGB 1-4)
The FAC monitoring program includes the use of a predictive method to calculate the wall thinning of components susceptible to FAC. In order for the staff to evaluate the accuracy of these predictions, the staff requests a sample list of components for which wall thinning is predicted and measured by ultrasonic testing or other method. Include the initial wall thickness (nominal), current (measured) wall thickness, and a comparison of the measured wall thickness to the thickness predicted by the CHECWORKS FAC model.
Response
The enclosure to this submittal, "Wear Rate Analysis: Combined Summary Report," provides a sample list of Condensate System components for which wall thinning is predicted and measured by ultrasonic testing. This list includes the initial (nominal) wall thickness, current (measured) wall thickness, and the thickness predicted by the CHECWORKS FAC model. Specifically, the enclosure provides a combined summary of the wear rate analysis for Condensate System Train A and Train B heat exchanger piping. As noted, the summary report identifies wall thicknesses for various Condensate System piping segments; example, for Component Name 111-01 OP (P =
piping), the initial (nominal) wall thickness is 0.375 in., the current (measured) wall thickness is 0.330 in., and the thickness predicted by the CHECWORKS FAC model is 0.309 in.
References
- 1. CR-3 to NRC letter dated June 15, 2011, "Crystal River Unit 3 - License Amendment Request #309, Revision 0, Extended Power Uprate." (Accession No. ML112070659)
U. S. Nuclear Regulatory Commission Attachment 3F01 12-04 Page 4 of 4
- 2. CR-3 to NRC letter dated January 27, 2010, "Crystal River Unit 3 - Response to Request for Additional Information for the Review of the Crystal River Unit 3, Nuclear Generating Plant, License Renewal Application (TAC NO. ME0274) and Amendment #9." (Accession No. ML100290366)
PROGRESS ENERGY FLORIDA, INC.
CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/LICENSE NUMBER DPR-72 ENCLOSURE SAMPLE OF WEAR RATE ANALYSIS: COMBINED
SUMMARY
REPORT
Company: PROGRESS ENERGY SERVICE COMPANY Report Date/Time : 16-Nov-2011 09:53 am Plant: CRYSTAL RIVER Analysis Date/Time : 16-Nov-2011 9:53 am Unit: 3 DB Name: CR3SFA_CURRENT(v3) CHECWORKS SFA Version: 3.0 SP-2 (build 200)
Wear Rate Analysis: Combined Summary Report Run Name: CD CDHE-2 TO CDHE-3 Ending Period: 17A OPERATING Total Plant Operating Hours:216776 Duty Factor (Global) : 1.000 WRA Data Option: NFA->ARD->HBD->COMP Exclude Measure Wear: NO Line Correction Factor: 0.879 Average Current Comp Predict [1] Total Lifetime In-Service Comp In-Service Comp Time (hrs)
Component Geom Wear Rate Wear Rate ------- ss ..... Time to Tcrit (hrs) Wear (mils) Wear (mils) r Method, Time Last Name Code (mils/vr) (mils/vr) fiinit), (Pt:il Thkoop Tcrit Inspected Prd.[21 Meas. Prd.[21 Meas. (in)[41 1`31 (hrs)[41 Inspected
===> Grouped by Line: CD-100 CDHE-2A to CDHE-3A, Sorted by: Flow Order 111-001N 31 1.765 0.735 0.500 0.476 0.235 0.235 2873850 Yes 39.4 50.0 39.4 50.0 0.480 MT 169064 169064 11 1-002RE 16 2.384 0.993 0.375 0.316 0.235 0.235 718450 No 0.0 0.0 0.0 0.0 0.375 0 0 11 1-002RE (D/S) 16 3.452 1.438 0.375 0.290 0.208 0.208 493938 No 0.0 0.0 0.0 0.0 0.375 0 0 111-003P 66 2.227 0.928 0.375 0.320 0.208 0.208 1051774 No 0.0 0.0 0.0 0.0 0.375 0 0 111-004E 2 4.120 1.717 0.375 0.273 0.208 0.208 329465 No 0.0 0.0 0.0 0.0 0.375 0 0 111-005P 52 2.784 1.160 0.375 0.306 0.208 0.208 737357 No 0.0 0.0 0.0 0.0 0.375 0 0 111-006E 2 4.120 1.717 0.375 0.273 0.208 0.208 329465 No 0.0 0.0 0.0 0.0 0.375 0 0 111-007P 52 2.784 1.160 0.375 0.306 0.208 0.208 737357 No 0.0 0.0 0.0 0.0 0.375 0 0 111-008E 2 4.120 1.717 0.375 0.273 0.208 0.208 329465 No 0.0 0.0 0.0 0.0 0.375 0 0 111-009E 4 4.120 1.717 0.375 0.273 0.208 0.208 329465 No 0.0 0.0 0.0 0.0 0.375 0 0 54 3.564 1.485 0.375 0.208 0.208 594068 Yes 67.3 44.0 67.3 44.0 MT 103510 103510 111-011E 2 4.120 1.717 0.375 0.273 0.208 0.208 329465 No 0.0 0.0 0.0 0.0 0.375 0 0 111-012EE 19 4.455 1.856 0.375 0.332 0.208 0.208 582641 Yes 103.1 61.0 103.1 61.0 0.339 MT 185384 185384 111-012EE (D/S) 19 3.815 1.589 0.303 0.235 0.235 376980 Yes 88.3 102.0 88.3 102.0 0.309 MT 185384 185384 111-013N 30 3.886 1.619 0.500 0.404 0.235 0.235 916247 No 0.0 0.0 0.0 0.0 0.500 0 0
===> Grouped by Line: CD-101 CDHE-2B to CDHE-3B, Sorted by: Flow Order 108-001N 31 4.857 2.024 0.500 0.380 0.235 0.235 628935 No 0.0 0.0 0.0 0.0 0.500 0 0 108-001P 61 2.575 1.073 0.375 0.442 0.235 0.235 1697418 Yes 51.1 76.0 51.1 76.0 0.455 MT 119830 119830 108-002RE 16 2.384 0.993 0.375 0.371 0.235 0.235 1206493 Yes 47.3 54.0 47.3 54.0 0.383 MT 119830 119830 108-002RE (D/S) 16 3.452 1.438 0.375 0.387 0.208 0.208 1088056 Yes 68.5 51.0 68.5 51.0 0.404 MT 119830 119830 108-003P US 66 2.227 0.928 0.375 0.333 0.208 0.208 1176618 Yes 44.2 63.0 44.2 63.0 0.344 MT 119830 119830 108-003P DS 66 2.227 0.928 0.375 0.320 0.208 0.208 1051774 No 0.0 0.0 0.0 0.0 0.375 0 0 108-004E 2 4.120 1.717 0.375 0.273 0.208 0.208 329465 No 0.0 0.0 0.0 0.0 0.375 0 0 108-005P 52 2.784 1.160 0.375 0.306 0.208 0.208 737357 No 0.0 0.0 0.0 0.0 0.375 0 0 108-006E 2 4.120 1.717 0.375 0.273 0.208 0.208 329465 No 0.0 0.0 0.0 0.0 0.375 0 0 108-007P US 52 2.784 1.160 0.375 0.306 0.208 0.208 737357 No 0.0 0.0 0.0 0.0 0.375 0 0 108-007P DS 52 2.784 1.160 0.375 0.349 0.208 0.208 1058328 No 0.0 0.0 0.0 0.0 0.360 MT 135675 0 108-008E 2 4.120 1.717 0.375 0.347 0.208 0.208 707587 Yes 85.1 67.0 85.1 67.0 0.364 MT 135675 135675 108-009EE 19 4.455 1.856 0.375 0.371 0.208 0.208 766067 Yes 92.0 92.0 92.0 92.0 0.389 MT 135675 135675 Page 1
Average Current Comp Predict [1] Total Lifetime In-Service Comp In-Service Comp Time (hrs)
Component Geom Wear Rate Wear Rate ...... Thickness (in) Time to Tcrit (hrs) Wear (mils) Wear (mils) Tmeas, Method, Time Last Name Code (mils/vr) (mils/vr! Init. Prd.rll Thooo Tcrit Inspected Prd.i21 Meas. Prd.121 Meas. (in)[41 [31 (hrs)[41 Inspected 108-009EE (D/S) 19 3.815 1.589 0.375 0.363 0.235 0.235 710215 Yes 78.8 65.0 78.8 65.0 0.379 MT 135675 135675 108-01 ON 30 3.886 1.619 0.500 0.404 0.235 0.235 916247 No 0.0 0.0 0.0 0.0 0.500 0 0 Notes:
[1] Predictions are based on last Tmeas to analysis ending period.
[2] Predictions are for the time of last known meas. wear. Can be P-to-P value depending on meas. wear method.
[3] GW = Tmeas is minimum thickness from Band, Blanket or Area Method of greatest wear.
MT = Tmeas is component minimum thickness.
PW = Tmeas is Tinit - predicted wear.
US = Tmeas is user specified.
[4] If no Tmeas has been determined from measured data, then Tmeas = Tinit and Time = current component installation time.
Tmeas is used to determine Predicted Thickness and Component Predicted Time to Tcrit.
Page 2