3F0321-05, Onsite Property Insurance Coverage
| ML21074A050 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/15/2021 |
| From: | Dixon P ADP CR3 |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| 3F0321-05 | |
| Download: ML21074A050 (1) | |
Text
March 15, 2021 3F0321-05 ADPCR3, LLC U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River 3 - Onsite Property Insurance Coverage Crystal River Nuclear Plant 2760 South Falkenburg Rd Riverview, FL 33578 Docket 50-302 Docket 72-1 035 Operating License No. DPR-72 10 CFR 50.54(w)(3)
References:
Insurance required of a licensee under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w)
Dear Sir or Madam:
Pursuant to 10 CFR 50.54(w)(3) regarding onsite property damage insurance, ADP CR3, LLC, hereby submits information regarding the present level and source of onsite property damage insurance for the Crystal River Unit 3 Nuclear Plant. This information is required to be submitted to the United States Nuclear Regulatory Commission by April 1 of each year.
Insured Site - Crystal River Company:
Nuclear Electric Insurance Limited Policy No.:
P20-081 (renewal date August 1, 2021)
Limits:
$50,000,0001 The insurance maintained is provided through a policy purchased by Duke Energy Florida, LLC.
Reference 1 provided notification to the NRC that ADP CR3, LLC and ADP SF1, LLC were added to the policy written for the Crystal River Unit 3 Nuclear Plant.
This letter contains no new regulatory commitments.
If you have any questions regarding this submittal, please contact Mr. Mark Van Sicklen, Licensing Manager, at (352) 436-5572.
Sincerely, N,f~
Phyllis A. Dixon, ISFSI Manager cc:
NMSS Project Manager Regional Administrator, Region I 1 Reduced to $50 Million pursuant to exemption granted by the NRC on March 16, 2016 (ML l 6020A448)