Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 06/15/2011 |
From: | Progress Energy Florida |
To: | Office of Nuclear Reactor Regulation |
References | |
3F0611-02 | |
Download: ML11207A444 (1017) | |
Similar Documents at Crystal River | |
---|---|
Category:Report
MONTHYEAR3F0324-03, Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information2024-03-31031 March 2024
[Table view]Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information ML24090A0042024-03-29029 March 2024 Enclosure 6, Part 1: Crystal River, Unit 3 - Appendix E – CHAR-05 Site Characterization of Buildings ML24030A7472024-02-13013 February 2024 Audit Report Attachment - Crystal River Unit 3 Nuclear Generating Plant LTP ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24090A0052023-10-10010 October 2023 Enclosure 6, Part 2: Crystal River, Unit 3, DD Survey 23-10-0096 ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23160A2972023-06-0909 June 2023 CR3 Site Characterization Survey Report (CHAR-01) Impacted Open Land Survey Areas 3F0623-02, Maintenance Support Building2023-06-0909 June 2023 Maintenance Support Building ML23160A2982023-06-0909 June 2023 Site Characterization Surveys ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0520-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20202020-05-18018 May 2020 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2020 3F0320-01, NRC Commitment Change Report - March 20202020-03-17017 March 2020 NRC Commitment Change Report - March 2020 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex ML19022A0762019-01-22022 January 2019 Partial Site Release Request ML19029A0092018-11-0707 November 2018 Reference 16 - Defueled Safety Analysis Report DSAR-R002 ML18303A2942018-06-21021 June 2018 Golder Associates, Inc. - Citrus Combined Cycle Project - CFR 122.21(r) Report 3F0518-03, Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20182018-05-24024 May 2018 Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2018 ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML19029A0102016-06-28028 June 2016 Reference 3 - Crystal River, Unit 3, Historical Site Assessment Rev. 00 3F0616-02, Nrg Commitment Change Report - June 20162016-06-14014 June 2016 Nrg Commitment Change Report - June 2016 ML13343A1782013-12-31031 December 2013 Report P23-1680-001, Rev. 0, Site-Specific Decommissioning Cost Estimate for Crystal River Unit 3 Nuclear Generating Plant. 3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re2013-01-31031 January 2013 Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Res 3F1112-01, Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan2012-11-0707 November 2012 Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 2502012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250 ML12314A3932012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 81 of 250 Through Page 173 of 250 ML12314A3922012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 1 of 250 Through Page 80 of 250 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C2012-09-30030 September 2012 ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. ML12284A1382012-05-25025 May 2012 Report EGS-TR-HC589-01, Seismic Qualification Test Report for Structural Verification Testing of Iccms Cabinet Assembly. 3F0512-01, NRC Commitment Change Report - May 20122012-05-14014 May 2012 NRC Commitment Change Report - May 2012 3F0112-04, Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 3F1211-14, Summary of Changes to Evaluation Models and Peak Cladding Temperature for Large Break Loss of Coolant Analysis and Small Break Loss of Coolant Analysis2011-12-14014 December 2011 Summary of Changes to Evaluation Models and Peak Cladding Temperature for Large Break Loss of Coolant Analysis and Small Break Loss of Coolant Analysis 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip ML11237A0682011-08-0505 August 2011 Siemens Technical Report CT-27438, Missile Probability Analysis Report Progress Energy Crystal River 3, Revision 1A ML11207A4442011-06-15015 June 2011 Attachment 7- Crystal River Unit 3 Extended Power Uprate Technical Report 3F0511-02, Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models2011-05-0606 May 2011 Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models ML1101906672010-10-0404 October 2010 Levy, Units 1 and 2, Cola (Sensitive Material), Rev. 2 - Levy County Emergency Plan Part 02 - Draft (Redacted) 3F0910-01, CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis2010-09-0808 September 2010 CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis ML1019304172010-05-0606 May 2010 Tritium Database Report ML1010603472010-04-0909 April 2010 5.2.2.4.4. Quality Control and Nondestructive Testing ML1028710882010-03-12012 March 2010 7.6 Vibration Due to Cutting Tendons ML1028711112010-02-25025 February 2010 7.11 Added Stress from Pulling Tendons ML1028711102010-02-23023 February 2010 6.3 Thermal Effects of Greasing ML1028804682010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 3 ML1028711212010-02-19019 February 2010 7.10 Hydrodemolition Induced Cracking 2024-03-31 Category:Technical MONTHYEAR3F0324-03, Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information2024-03-31031 March 2024
[Table view]Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information ML24090A0042024-03-29029 March 2024 Enclosure 6, Part 1: Crystal River, Unit 3 - Appendix E – CHAR-05 Site Characterization of Buildings ML24030A7472024-02-13013 February 2024 Audit Report Attachment - Crystal River Unit 3 Nuclear Generating Plant LTP ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24090A0052023-10-10010 October 2023 Enclosure 6, Part 2: Crystal River, Unit 3, DD Survey 23-10-0096 3F0623-02, Maintenance Support Building2023-06-0909 June 2023 Maintenance Support Building ML23160A2982023-06-0909 June 2023 Site Characterization Surveys ML23160A2972023-06-0909 June 2023 CR3 Site Characterization Survey Report (CHAR-01) Impacted Open Land Survey Areas ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0520-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20202020-05-18018 May 2020 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2020 3F0320-01, NRC Commitment Change Report - March 20202020-03-17017 March 2020 NRC Commitment Change Report - March 2020 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex ML19022A0762019-01-22022 January 2019 Partial Site Release Request ML19029A0092018-11-0707 November 2018 Reference 16 - Defueled Safety Analysis Report DSAR-R002 ML18303A2942018-06-21021 June 2018 Golder Associates, Inc. - Citrus Combined Cycle Project - CFR 122.21(r) Report 3F0518-03, Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20182018-05-24024 May 2018 Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2018 ML19029A0102016-06-28028 June 2016 Reference 3 - Crystal River, Unit 3, Historical Site Assessment Rev. 00 ML13343A1782013-12-31031 December 2013 Report P23-1680-001, Rev. 0, Site-Specific Decommissioning Cost Estimate for Crystal River Unit 3 Nuclear Generating Plant. 3F1112-01, Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan2012-11-0707 November 2012 Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan ML12314A3932012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 81 of 250 Through Page 173 of 250 ML12314A3922012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 1 of 250 Through Page 80 of 250 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 2502012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C2012-09-30030 September 2012 ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 ML12284A1382012-05-25025 May 2012 Report EGS-TR-HC589-01, Seismic Qualification Test Report for Structural Verification Testing of Iccms Cabinet Assembly. ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip ML11237A0682011-08-0505 August 2011 Siemens Technical Report CT-27438, Missile Probability Analysis Report Progress Energy Crystal River 3, Revision 1A ML11207A4442011-06-15015 June 2011 Attachment 7- Crystal River Unit 3 Extended Power Uprate Technical Report ML1101906672010-10-0404 October 2010 Levy, Units 1 and 2, Cola (Sensitive Material), Rev. 2 - Levy County Emergency Plan Part 02 - Draft (Redacted) ML1010603472010-04-0909 April 2010 5.2.2.4.4. Quality Control and Nondestructive Testing ML1028711122010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 1 ML1028804682010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 3 ML1028711212010-02-19019 February 2010 7.10 Hydrodemolition Induced Cracking ML1028711132010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 2 ML1028711452010-02-18018 February 2010 7.8 Excessive Water Jet Pressure Part 1 ML1028711462010-02-18018 February 2010 7.8 Excessive Water Jet Pressure Part 2 ML1028804582010-02-18018 February 2010 7.8 Excessive Water Jet Pressure Part 3 ML1028711482010-02-0707 February 2010 7.2 Vibration Induced by Hydro Blasting Part 1 ML1028711492010-02-0707 February 2010 7.2 Vibration Induced by Hydro Blasting Part 2 ML1028702832010-02-0303 February 2010 6.6 Original Tensioning T(2) ML1028702912010-02-0202 February 2010 6.5 Inadequate RetensioningT1 ML1028704062010-01-27027 January 2010 Email - from: Dyksterhouse, Don (Don.Dyksterhouse@Pgnmail.Com) to: Lake, Louis Dated Wednesday, January 27, 2010 Design Basis Calculations Attachments: 0102-0135-02 Concrete Strength and Elastic.... Ro Final.Pdf; 0102-0135-03 Ro Final.Pdf; ML1028706922010-01-22022 January 2010 Ctl 059169 Final Report.Pdf ML1028805162010-01-16016 January 2010 Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com'; Sealey, Mac Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:19PM Subject: Failure Mode 2.6 for Review.. 2024-03-31 |