ML030070172

From kanterella
Jump to navigation Jump to search
Summary Report - Ncrs Initiated Since 10/18/2002
ML030070172
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/25/2002
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0059
Download: ML030070172 (1)


Text

For Information Only. CR3 Crystal River Nuclear Facility S,,,,Summary Report - NCRs Initiated Since 10/18102 Sorted by Originabon Date, Ar Number, Pnority Selecton Cntena. AR Type = NCR and AR Status not = Canceled with Attribute of 1A POT'L OPER/REPORT AR# Originator AR Subject Orig. Date AR Status Priority Potential OperlReport NCR Owner 00075219 /'fNDREW BARNES RM-All SOURCE CHECK NOT PERFORMED 20021024 I/APPR Y CR3 UNIT EVAL

... .. L__.. .. GROUP PRIOR TO RELEASE AFTER THE INITIATION OF THE "B" WGDT RELEASE, THE AB OPERAT OR WAS REVIEWING THE RELEASE PERMIT AND QUESTIONED WHY THE SOURCE CHECK FOR RM-AII WAS NOT SIGNED OFF. IN REVIEWING T HE OP-412B HE IDENTIFIED THE STEP WAS NA'D. THE AB OPERATO R BROUGHT THIS INFORMATION TO THE CRS AND SSO AND THE RELEA SE WAS SECURED IAW OP-412B TO SOURCE CHECK RM-AII.

00075237 JOHN WILCOX PASSPORT DATA BASE HAD WRONG 20021024 H/APPR N CR3 UNIT EVAL DESCRIPTOR. GROUP THE WRONG DESCRIPTION WAS GIVEN BY PASSPORT DATA BASE FOR M TMC-19-4D. THE DESCRIPTION READ "WDT-1B B WASTE GAS COMPRE SSOR" IT SHOULD HAVE READ "WDP-1B B WASTE GAS COMPRESSOR". AN ECCMU WAS GENERATED (1517) TO FIX THE DISCREPANCY. TH IS WAS CAUGHT DURING THE HANGING OF C/O 44100

'I I

00075276 ý_RONALD TYRIE DHP-1B BREAKER MISTAKENLY RACKED OUT 20021024 HIAPPR \/J& CR3 UNIT EVAL S- DURING CLEARANCE HANG " # GROUP WHILE HANGING A CLEARANCE ORDER TO CLEAN DCHE-1B, THE OPERA TOR OPENED THE KNIFE SWITCH FOR RWP-3B AND AFTER RETRIEVING THE TOOL TO RACK OUT THE BREAKER, HE MISTAKENLY RACKED OUT THE BREAKER FOR DHP-1B. THIS RESULTED IN ITS 3.5.2, CONDI TION A ENTRY FOR TWO MINUTES (1208-1210). THIS ALSO IS A S AFETY NEAR MISS AS THE BREAKER WAS RACKED OUT WITHOUT DISAB LING THE CONTROL CIRCUIT BY OPENING THE KNIFE SWITCH. IF D HP-lB HAD BEEN RUNNING, THE BREAKER WOULD HAVE BEEN OPENED WITH THE OPERATORS HAND INSIDE THE CUBICLE. DHP-1B WAS SUB JECT TO AUTO-START AND WAS PLANNED TO BE STARTED FOR SP-340 E DURING THIS SAME TIME PERIOD.

00075280 PETER EZZELL SEA TURTLE 20021024 H/APPR Y CR3 UNIT EVAL MORTALITY GROUP A GREEN SEA TURTLE WAS RECOVERED FROM THE CR3 BAR RACK AT A PPROXIMATELY 01:00. THE TURTLE WAS OBSERVED TO BE IN A WE AKENED STATE AND COVERED WITH TUMORS. THE RECOVERY PERSON CALLED OUT A STAFF BIOLOGIST TO EXAMINE THE TURTLE. THE TURTLE WAS EXAMINED AT ABOUT 01:45 AND DETERMINED TO BE EI THER DEAD OR COMATOSE. AFTER SUBSEQUENT EXAMINATION IT WAS DETERMINED TO HAVE DIED. AFTER CONSULTATION WITH THE FL ORIDA FISH AND WILDLIFE COMMISSION, (AT 12:25 PM) IT WAS DE TERMINED THAT THE DEATH WAS CAUSALLY RELATED TO CREC'S OPER ATIONS. THIS REQUIRES THAT A 4 HOUR REPORT TO THE NRC BE M ADE, AND THAT A REPORT TO THE NATIONAL MARINE FISHERIES SER VICES BE SUBMITTED WITHIN 30 DAYS.

00075287 JEFFREY SELVIDIO IAP-4 BATTERY CHARGER NOT IN THE 20021024 WAPPR N CR3 UNIT'EVAL CORRECT MODE GROUP BATTERY CHARGER FOR IAP-4 WAS IN THE AUTOMATIC POSITION. P ER PM-110 IT SHOULD REMAIN IN MAINTAIN POSITION.

Run Date/Time: 10/25/02 3:46:39 AM Page 15 of 16

- Report Name: RpLATNCRslnitLast7aCR3, Created from SrceThLATNCRslntLast7a