MONTHYEARIR 05000302/20240012024-09-23023 September 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, NRC Inspection Report No. 05000302/2024001 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24226B2392024-08-27027 August 2024 Application for License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Acknowledgement of Withdrawal ML24179A0702024-07-26026 July 2024 SHPO S106 Completion Crystal River Unit 3 ML24205A2192024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Muscogee Nation ML24205A2182024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Nation of Oklahoma ML24179A0912024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Tribe of Florida ML24205A2202024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3_Miccosukee Tribe of Florida ML24190A1912024-07-0808 July 2024 Fws Concurrence for Crystal River Unit 3 ML24172A2552024-06-20020 June 2024 Fws to NRC Species List: Florida Ecological Services Field Office 06/20/2024 ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24114A2262024-04-24024 April 2024 Amended Special Package Authorization for the Cr3 Middle Package (Crystal River 3 Middle Package - Docket No. 71-9393) IR 05000302/20230022024-04-17017 April 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2023002 ML24054A0612024-04-0202 April 2024 Request to Initiate Section 106 Consultation Regarding the License Termination Plan for Crystal River Unit 3 in Citrus County, Florida ML24079A2492024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Johnson, Lewis Johnson ML24054A0582024-04-0202 April 2024 Achp S106 Initiation Crystal River Unit 3 - Letter 1 ML24079A2472024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Cypress, Talbert ML24079A2482024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Hill, David Hill ML24054A0812024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Osceola, Marcellus ML24089A0362024-03-29029 March 2024 Response to Audit Plan in Support of Accelerated Decommissioning Partners and Request to Add License Condition to Include License Termination Plan Requirements. W/Enclosures 1 to 5 ML24073A1922024-03-11011 March 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24054A6452024-02-29029 February 2024 Letter - Reply to Request for RAI Extension Related to the Crystal River License Termination Plan ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23342A0942024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commissions Analysis of ADP CR3, LLCs Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan 2024-09-23
[Table view] Category:Inspection Report Correspondence
MONTHYEARML18158A4792018-05-17017 May 2018 Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2018401 (Cover Letter Only) ML1112501592011-05-0505 May 2011 Notice of Inspection and Request for Information 05000302/2011003 IR 05000302/20104032010-07-29029 July 2010 IR 05000302-10-403 on 07/13/2010 for Crystal River - NRC Material Control and Accounting IR 05000302/20094032009-08-0404 August 2009 Nuclear Generating Plant - NRC Security Inspection Report 05000302/2009403 IR 05000302/20074012007-04-27027 April 2007 NRC Physical Security Baseline Inspection Report 05000302/2007401 - Safeguards Information Removed IR 05000302/20070012007-03-0101 March 2007 Annual Assessment Letter - Crystal River Unit 3 (NRC Inspection Report 05000302/2007001) IR 05000302/20060102006-06-0202 June 2006 IR 05000302-06-010; 04/24-28/2006; Crystal River Unit 3; Emergency Preparedness ML0400902182003-12-22022 December 2003 Undated, Inspector Post-Inspection Debrief to Region II DRS Managers Briefing Summary of Crystal River Triennial Fire Protection Baseline Inspection on 06/24-28 and 07/08-12/2002 ML0304403332003-02-10010 February 2003 IR 05000302-03-002, Notification of Crystal River - Safety System Design & Performance Capability Inspection on 05/05-19/2003 ML0223907192002-08-23023 August 2002 IR 05000302-02-005, on 06/24/2002 - 07/12/2002, Crystal River Unit 3, Triennial Baseline Inspection of Fire Protection Program. No Violations Noted IR 05000302/20010042002-01-28028 January 2002 IR 05000302/2001-004, on 09/30/2001 - 12/29/2001, Florida Power Corporation, Crystal River Unit 3, Event Followup and Refueling Outage 2018-05-17
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23354A0642023-12-22022 December 2023 Enclosure - Crystal River License Termination Plan Request for Additional Information ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23103A1922023-04-19019 April 2023 Request for Supplemental Information Enclosure ML21182A1032021-07-0606 July 2021 Request for Additional Information (RAI) Related to the ISFSI-Only Emergency Plan ML16032A1772016-02-0404 February 2016 J. Hickman, NRC, Letter to T. Hobbs, Crystal River 3, Request for Additional Information for Emergency Plan Change ML15026A4162015-02-0202 February 2015 Request for Additional Information Regarding the 10 CFR 50.54(p) Changes to the Security Plans ML14274A1392015-01-0808 January 2015 Request for Additional Information, License Amendment Request to Revise Technical Specifications and License Conditions to Create Permanently Defueled Technical Specifications ML14133A5032014-05-14014 May 2014 Correction, Request for Additional Information on the Post Shutdown Decommissioning Activities Report ML14104A0392014-04-28028 April 2014 Request for Additional Information on the Post Shutdown Decommissioning Activities Report ML13175A2152013-06-28028 June 2013 Request for Additional Information Regarding Request to Rescind Fukushima-Related Orders ML13018A3072013-02-0101 February 2013 Request for Additional Information for Extended Power Uprate License Amendment Request ML12355A6592012-12-21021 December 2012 Nuclear Generating Plant - RAI 9.3 of the Near-Term Task Force Fukushima Dai-ichi.. ML12333A0892012-12-19019 December 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12310A2912012-11-15015 November 2012 Request for Additional Information for Changes to Security Plan ML12240A0152012-08-28028 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12219A1912012-08-16016 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12213A3032012-08-0303 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request (Srxb) ML12202A0602012-08-0202 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12125A1622012-08-0101 August 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request ML12194A4172012-07-17017 July 2012 Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request ML12174A2922012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12171A3472012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12102A0442012-05-0404 May 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12052A1302012-03-0202 March 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12003A2172012-02-0808 February 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request ML11326A2312011-12-0707 December 2011 Request for Additional Information for Extended Power Uprate License Amendment Request ML11308A6592011-11-17017 November 2011 Generating Plant - Request for Additional Information Regarding 60-Day Response to Bulletin 2011-01, Mitigating Strategies ML11301A1142011-11-0808 November 2011 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1128602942011-10-12012 October 2011 IR 05000302-11-005; 11/14-18/2011; Crystal River Unit 3, Notification of Inspection and Request for Information ML11175A1512011-06-30030 June 2011 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML11137A1742011-06-22022 June 2011 Nuclear Generating Plant; H. B. Robinson Steam Electric Plant, 2; and Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information Regarding 2011 Decommissioning Funds ML1115403412011-06-0202 June 2011 Nuclear Generating Plant - Notification of Inspection and Request for Information 05000302/2011501 ML11122A0002011-05-26026 May 2011 Request for Additional Information for the Review of the Crystal River, Unit 3, License Renewal Application ML1112501592011-05-0505 May 2011 Notice of Inspection and Request for Information 05000302/2011003 ML1108202262011-03-31031 March 2011 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1031402722010-11-16016 November 2010 Request for Additional Information for the Review of the Crystal Review Unit 3 Nuclear Generating Plant, License Renewal Application ML1029503292010-11-0808 November 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application ML1030202942010-10-28028 October 2010 Nuclear Generating Plant - Notification of Inspection and Request for Information IR 05000302-10-005 ML1027100652010-10-19019 October 2010 09/27/10 Summary of Telephone Conference Call Held Between NRC and Florida Power Corp., Concerning Draft Request for Information Related to Crystal River, Unit 3, License Renewal Application ML1026002432010-10-14014 October 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1022800102010-08-11011 August 2010 Nuclear Generating Plant - Draft RAIs Regarding Crystal River Unit 3 Part 26 Exemption Request ML1017404972010-07-0808 July 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1015303972010-07-0808 July 2010 RAI for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1014105122010-06-0202 June 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application 2023-04-19
[Table view] |
See also: IR 05000302/2011003
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
May 5, 2011
Mr. Jon A. Franke
Vice President, Crystal River Nuclear Plant
Crystal River Nuclear Plant (NA2C)
15760 W. Power Line Street
Crystal River, FL 34428-6708
SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION
OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011003
Dear Mr. Franke:
During the period of June 13 -17, 2011, the NRC will conduct baseline radiation safety
inspection activities at the Crystal River 3 Nuclear Plant. The inspection will focus on the Public
Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124. 07.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to conduct a
productive inspection, we have enclosed a request for documents needed for this inspection. It
is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. The lead inspector has requested that the subject informational material be
made available to the NRC staff by June 6, 2011, to allow preparation for the upcoming
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory on-site contact for this inspection will be Mr. Dennis Herrin of your
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, George B. Kuzo at (404) 997-4658.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
FPC 2
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian Bonser, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No.: 50-302
License No.: DPR-72
Enclosure:
Public Radiation Protection Inspection Document Request
cc w/encl.: (See page 3)
FPC 3
cc w/encl: Daniel R. Westcott
Kelvin Henderson Supervisor
General Manager Licensing & Regulatory Programs
Nuclear Fleet Operations Crystal River Nuclear Plant (NA1B)
Progress Energy Electronic Mail Distribution
Electronic Mail Distribution
Joseph W. Donahue
Brian C. McCabe Vice President
Manager, Nuclear Oversight Nuclear Oversight
Shearon Harris Nuclear Power Plant Progress Energy
Progress Energy Electronic Mail Distribution
Electronic Mail Distribution
Jack E. Huegel
James W. Holt Manager, Nuclear Oversight
Plant General Manager Crystal River Nuclear Plant
Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
Electronic Mail Distribution
David T. Conley
Stephen J. Cahill Senior Counsel
Director - Engineering Nuclear Legal Department
Crystal River Nuclear Plant (NA2C) Progress Energy
Electronic Mail Distribution Electronic Mail Distribution
R. Alexander Glenn Mark Rigsby
General Counsel Manager, Support Services - Nuclear
Progress Energy Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Electronic Mail Distribution
Jeffrey R. Swartz Senior Resident Inspector
Director Site Operations U.S. Nuclear Regulatory Commission
Crystal River Nuclear Plant Crystal River Nuclear Generating Plant
Electronic Mail Distribution U.S. NRC
6745 N Tallahassee Rd
Donna B. Alexander Crystal River, FL 34428
Manager, Nuclear Regulatory Affairs
(interim) Attorney General
Progress Energy Department of Legal Affairs
Electronic Mail Distribution The Capitol PL-01
Tallahassee, FL 32399-1050
Thomas Sapporito
Consulting Associate Bryan Koon
(Public Correspondence Only) Director
Post Office Box 8413 Florida Division of Emergency Management
Jupiter, FL 33468 Electronic Mail Distribution
William A. Passetti Chairman
Chief Board of County Commissioners
Florida Bureau of Radiation Control Citrus County
Department of Health 110 N. Apopka Avenue
Electronic Mail Distribution Inverness, FL 36250
ML111250159 X SUNSI REVIEW COMPLETE
OFFICE RII: DRS RII:DRS
SIGNATURE RA RA
NAME G. KUZO B. BONSER
DATE 05/05/2011 05/05/2011
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
PUBLIC RADIATION PROTECTION INSPECTION
DOCUMENT REQUEST
SITE: Crystal River Unit 3 (CR3) Report Number: 05000302/2011003
INSPECTION DATES: June 13 - 17, 2011
NRC INSPECTOR: George B. Kuzo George.Kuzo@NRC.GOV (404) 997-4658
PRELIMINARY LICENSEE CONTACTS: Radiation Controls - Bryan Akins at (352) 464-
7964(c); Effluents/Process Monitors/Radiological Environmental Monitoring Program - Lee
Hughes at (352) 563-4715 or (352) 464-7421(c) and/or Rudy Pinner at (352) 795-6486 ext.
3141; and Licensing - D. Herrin at (352) 563-4633.
Inspection Procedure (IP): IP 71124.07 Radiological Environmental Monitoring Program
Exposure Controls
Note: This is a broad list of the documents the lead NRC inspector will be interested in
reviewing and obtaining during the pre-inspection visit. The current version of these documents
is expected unless specified otherwise. Electronic media is preferred, if readily available. (The
preferred file format is Word, WordPerfect, or searchable pdf files on electronic media, e.g.
CD-ROM. Please provide 3 copies of each electronic device that is submitted.) Information in
the document lists should contain enough information to be easily understood by someone
who has knowledge of the subject. During the inspection, the inspectors may request additional
documents.
GENERAL INFORMATION NEEDED
Organization Charts and Contact Phone Numbers for:
Radiation Protection
Chemistry
Procedure for issuing Condition Report (CR) documents and assessing issues for risk
significance and follow-up actions.
Updated Final Safety Analysis Report Chapter 11, Effluents/Radwaste; and Chapter 12
Radiation Protection.
Current version/revision of the Offsite Dose Calculation Manual (ODCM).
Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY)
2008, CY 2009, and CY 2010.
Annual Radiological Effluent Release Report (ARERR) documents for CY 2008, CY 2009,
and CY 2010.
RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM [IP 71124.07]
Site and corporate procedures associated with radiological environmental monitoring
including:
Collection, preparation, and analysis of environmental samples including air samples,
TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.;
Enclosure
2
Calibration and maintenance of air/water sampling equipment;
Calibration and QC activities for sample counting instruments;
Sampling and monitoring program to detect leaks from contaminated or potentially
contaminated systems, structures, or components;
Meteorological instrument calibration, operation, and routine surveillances;
AREOR CYs 2008, 2009 and CY 2010. [Note: provided as part of the General Information
Request and do not need to be duplicated].
List of structures, systems, or components that contain or could contain licensed material for
which there is a credible mechanism for the radioactive material to reach ground water.
Summary of leaks and/or spills since October 1, 2008, i.e. additions to the 50.75(g) file.
Calibration and maintenance records for REMP air and composite water samplers since
October 1, 2008.
Inter-laboratory comparison program results for the past two years (in-house or vendor
laboratory).
Last two calibration /surveillance/maintenance records for the meteorological monitoring
instruments since October 1, 2008.
List of CAP CR and audit documents generated since October 1, 2008, related to
Radiological Environmental Monitoring Program and meteorological monitoring activities.
Enclosure