IR 05000302/2010403
| ML102100228 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/29/2010 |
| From: | Rich D NRC/RGN-II/DRP/RPB3 |
| To: | Franke J NRC/RGN-II/DRS/EB3 |
| References | |
| IR-10-403 | |
| Download: ML102100228 (6) | |
Text
July 29, 2010
SUBJECT:
CRYSTAL RIVER UNIT 3 - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000302/2010403
Dear Mr. Franke:
On July 13, 2010, the US Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at you Crystal River Unit 3. The enclosed inspection report documents the inspection results, which were discussed on July 13, 2010, with you and other members of your staff.
The inspection examined activities conducted under your license as they related to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable FPC 2 response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
Sincerely,
/RA/
Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects
Docket No. 50-302 License No. DPR-72
cc w/ and w/o encl. (see page 3) FPC 2 response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
Sincerely,
/RA/
Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects
Docket No. 50-302 License No. DPR-72
cc w/ and w/o encl. (see page 3)
X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:_________________________
X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP
RII:DRP
SIGNATURE SON TXM1 by email
NAME SNinh TMorrissey
DRich
DATE 0720/2010 0728/2010
07/ /2010
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:
I:\\RPB3\\CRYSTAL\\REPORTS\\2010\\IR 2010403 WITHOUT ENCLOSURES.DOCX FPC 3 cc w/o encl:
R. J. Duncan, II, Vice President Nuclear Operations Carolina Power & Light Company Electronic Mail Distribution
Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc.
Electronic Mail Distribution
James W. Holt, Plant General Manager Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
R. Alexander Glenn Associate General Counsel (MAC - BT15A)
Florida Power Corporation Electronic Mail Distribution
Christos Kamilaris, Director Fleet Support Services Carolina Power & Light Company Electronic Mail Distribution
William A. Passetti, Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
Daniel R. Westcott, Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B)
Electronic Mail Distribution
Joseph W. Donahue, Vice President Nuclear Oversight Carolina Power and Light Company Electronic Mail Distribution
Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution David T. Conley Associate General Counsel Legal Dept.
Progress Energy Service Company, LLC Electronic Mail Distribution
Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
Senior Resident Inspector U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd Crystal River, FL 34428
Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050
Ruben D. Almaguer, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution
Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250
cc w/encl: (see next page) FPC 4 cc w/encl:
James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C)
15760 W. Power Line Street Crystal River, FL 34428-6708
Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C)
15760 West Power Line Street Crystal River, FL 34428-6708 FPC 5 Letter to Jon from Daniel W. Rich dated July 29, 2010
SUBJECT:
CRYSTAL RIVER UNIT 3 - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000302/2010403
Distribution w/encl:
C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource