Nuclear Generating Plant - RAI 9.3 of the Near-Term Task Force Fukushima Dai-ichi
ML12355A659
Person / Time
Site: Harris, Brunswick, Crystal River, Robinson  Duke Energy icon.png
Issue date: 12/21/2012
From: Billoch-Colon A
Plant Licensing Branch II
To: Annacone M, Franke J, William Gideon, Hamrick G
Carolina Power & Light Co
Billoch-Colon A NRC/NRR/DORL/LPL2-2
References
TAC ME9996, TAC ME9997, TAC MF0013, TAC MF0027
Download: ML12355A659 (12)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 21, 2012 Mr. Michael J. Annacone, Vice President Mr. Jon A. Franke, Vice President Brunswick Steam Electric Plant Crystal River Nuclear Plant (NA2C)

Carolina Power & Light Company ATTN: Supervisor, Licensing &

Post Office Box 10429 Regulatory Programs Southport, North Carolina 28461 15760 West Power Line St'reet Crystal River, Florida 34428-6708 Mr. William R. Gideon, Vice President Mr. George Hamrick, Vice President H. B. Robinson Steam Electric Plant, Shearon Harris Nuclear Power Plant Unit No.2 Carolina Power & Light Company Carolina Power & Light Company Post Office Box 165, Mail Zone 1 3581 West Entrance Road New Hill, North Carolina 27562-0165 Hartsville, South Carolina 29550-0790

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2, H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2, SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, AND CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - REQUEST FOR ADDITIONAL INFORMATION REGARDING RECOMMENDATION 9.3 OF THE NEAR-TERM TASK FORCE RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT (TAC NOS. ME9996, ME9997, MF0013, MF0027, AND MF0013)

Gentlemen:

By letter dated March 12,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12053A340), the U.S. Nuclear Regulatory Commission (NRC) issued a Request for Information pursuant to Section 50.54, paragraph (f) of Title 10 of the Code of Federal Regulations (10 CFR), regarding Recommendations 2.1 (seismic and flooding evaluations), 2.3 (seismic and flooding walkdowns), and 9.3 (emergency preparedness communication and staffing) of the Near Term Task Force review of insights from the Fukushima Dai-ichi accident. With respect to Recommendation 9.3, Enclosure 5 to the NRC's letter requested licensees to assess their means to power communications equipment onsite and offsite during a prolonged station blackout event and to perform a staffing study to determine the staff required to fill all necessary positions in response to a multi-unit event.

The NRC staff is reviewing your communications assessment summary dated October 31, 2012 (ADAMS Accession No. ML12311A299), and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on December 13, 2012, it was communicated that a potential generic issue regarding the responses will be discussed on a meeting with the industry. The meeting will take place on January 3, 2013. Following the meeting, the NRC staff will communicate to your staff the response timeframe for the request for additional information in the enclosure.

M. Annacone, et al.

- 2 The NRC considers that timely responses to requests for additional information help ensure sufficient time is available for the NRC staff review and contribute toward the NRC's goal of efficient and effective use of staff resources.

Should you have any questions regarding this letter. please contact me at (301) 415-3302.

Sincerely.

~ t1- (/

Araceli T. Billoch Colon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325, 50-324, 50-302, 50-261, and 50-400

Enclosure:

Request for Additional Information cc: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION RESPONSE TO NRC'S 10 CFR 50.54(F) INFORMATION REQUEST - COMMUNICATIONS BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2, SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2, AND CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT CAROLINA POWER AND LIGHT COMPANY DOCKET NOS. 50-325, 50-324, 50-302, 50-261, and 50-400 By letter dated October 31, 2012 (Agencywide Documents Access and Management System Accession Number ML12311A299), Carolina Power & Light Company (the licensee) provided the communications assessment summary related to the March 12, 2012, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54{f)

Regarding Recommendations 2.1,2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident." The Nuclear Energy Institute (NEI) 12-01 presents a methodology for licensees to analyze their ability to perform critical communications during and after a large-scale natural event. The U.S. Nuclear Regulatory Commission (NRC) staff has previously reviewed NEI 12-01 and determined that it was an acceptable method for licensees to use in responding to NRC's March 12, 2012, information request. To complete its review, the NRC staff requests the following additional information.

Brunswick Steam Electric Plant, Units 1 and 2:

1.

In your assessment summary dated October 31,2012, a communications assessment summary was provided that discusses communications from and among the site facilities and licensee staff (including the emergency operations facility and joint information center) to offsite response organizations, and NRC. Clarification is needed on how the power for the equipment analyzed is expected to be available and how planned enhancements are expected to be maintained.

A. Provide a detailed description of how power will be maintained for these planned or potential improvements to the communication links and existing equipment analyzed to be available.

a. If batteries are necessary to power these bullhorns, satellite phones and radios, please identify the expected duration of the batteries before charging is required, using vendor information.
b..If batteries are necessary to power these bullhorns, satellite phones and radios, identify whether replacement batteries are expected to be necessary for a 24-hour duration and if they are sufficient.

Enclosure

- 2

c. If the strategy is to charge batteries using the generators purchased as an interim measure, describe the generator's availability to charge the batteries without offsite equipment for a duration of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d. Describe the ancillary equipment necessary to support communication links and provide a description about how it can support operations for a 24-hour duration (e.g., adequacy of fuel supplies for the four generators purchased; and the minimum number of battery chargers expected to be necessary).
2.

Clarification is needed on the use and function of the planned enhancements for the improvement of communications.

A. Clarify the use of the planned enhancement of the portable satellite phones.

a. Clarify whether each satellite phone identified is only to be used for maintaining the communication link identified, or if it is expected to be shared. If the resource is expected to be shared, provide an assessment of this shared use, with a justification of why this shared use is acceptable. Describe any impediments as a result of the shared usage.
b. Provide a general description of the satellite phones and how the equipment will be integrated for use.
c. Provide the title and general description of the procedure that will be developed and used by plant personnel to describe protocols for multi-usage.
3.

Clarification is needed on the protection of the new equipment purchased as a planned enhancement as well as the protection of existing communications equipment analyzed as being available.

A. Clarify how the existing equipment analyzed to be available and enhancements to these communication links as well as associated ancillary equipment will be stored in a manner that is protective from a large-scale natural event.

a. Provide the analysis that demonstrates the expected availability of the radios in Attachment 2, Tables 4.1.4, 4.1.6, and 4.2, and the bullhorns and sound powered phones in Attachment 2, Table 4.2.
4.

Clarification is needed to describe programmatic controls for the use of the new equipment purchased as a planned enhancement.

A. Clarify the planned proceduralization and training for the use of the programmatic controls new equipment purchased as planned enhancements. If this has not yet been finalized, provide general information for the areas below for existing communications equipment, and state whether similar programmatic controls will be applied to this equipment. It is acceptable to provide the title and description of a new procedure for new communications equipment.

-3

a. Describe any credited manual actions and their procedures.
b. Describe any maintenance for this equipment, including operability testing.
c. Describe any periodic inventory checks.
d. Describe planned staff training.
5.

In your assessment dated October 31,2012, it is unclear what assumptions are used as part of the Communications Assessment.

A. Provide a detailed description of the assumptions used for the submitted communications assessment summary, and provide technical justification for any deltas from the assumptions within NEI 12-01, Sections 2.2 and 2.4.

6.

In your assessment dated October 31,2012, further descriptions are needed on the notification of personnel.

A. Provide a description and procedure title of the procedure for emergency notification of essentially all plant staff within 30 minutes utilizing the existing bullhorns, sound powered telephones, and two-way radios.

B. Provide a description and procedure title of the procedure for notification of emergency response organization staff

7.

In your assessment dated October 31, 2012, further descriptions are needed to clarify how communications will be maintained during the period of final implementation of the communication enhancements.

A. Describe the interim actions that will bridge the gap until all final mitigation strategies being proceduralized are implemented.

Shearon Harris Nuclear Power Plant, Unit 1:

1.

In your assessment summary dated October 31, 2012, a communications assessment summary was provided that discusses communications from and among the site facilities and licensee staff (including the emergency operations facility and joint information center) to offsite response organizations, and NRC. Clarification is needed on how the power for the equipment analyzed is expected to be available and how planned enhancements are expected to be maintained.

A. Provide a detailed description of how power will be maintained for these planned or potential improvements to the communication links and existing equipment analyzed to be available.

a.

If batteries are necessary to power these bullhorns, satellite phones and

- 4 radios, please identify the expected duration of the batteries before charging is required, using vendor information.

b. If batteries are necessary to power these bullhorns, satellite phones and radios, identify whether replacement batteries are expected to be necessary for a 24-hour duration and if they are sufficient.
c. If the strategy is to charge batteries using the generators purchased as an interim measure, describe the generator's availability to charge the batteries without offsite equipment for a duration of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d. Describe the ancillary equipment necessary to support communication links and provide a description about how it can support operations for a 24-hour duration (e.g., adequacy of fuel supplies for the four generators purchased; and the minimum number of battery chargers expected to be necessary).
2.

Clarification is needed on the use and function of the planned enhancements for the improvement of communications.

A. Clarify the use of the planned enhancement of the portable satellite phones.

a. Clarify whether each satellite phone identified is only to be used for maintaining the communication link identified, or if it is expected to be shared.

If the resource is expected to be shared, provide an assessment of this shared use, with a justification of why this shared use is acceptable.

Describe any impediments as a result of the shared usage.

b. Provide a general description of the satellite phones and how the equipment will be integrated for use.
c. Provide the title and general description of the procedure that will be developed and used by plant personnel to describe protocols for multi-usage.
3.

Clarification is needed on the protection of the new equipment purchased as a planned enhancement as well as the protection of existing communications equipment analyzed as being available.

A. Clarify how the existing equipment analyzed to be available and enhancements to these communication links as well as associated ancillary equipment will be stored in a manner that is protective from a large-scale natural event.

a. Provide the analysis that demonstrates the expected availability of the sound powered phones, two-way radios, and radios in Attachment 4, Tables 4.1.4 and 4.2.
4.

Clarification is needed to describe programmatic controls for the use of the new equipment purchased as a planned enhancement.

- 5 A. Clarify the planned proceduralization and training for the use of the programmatic controls new equipment purchased as planned enhancements. If this has not yet been finalized, provide general information for the areas below for existing communications equipment, and state whether similar programmatic controls will be applied to this equipment. It is acceptable to provide the title and description of a new procedure for new communications equipment.

a. Describe any credited manual actions and their procedures.
b. Describe any maintenance for this equipment, including operability testing.
c. Describe any periodic inventory checks.
d. Describe planned staff training.
5.

In your assessment dated October 31, 2012, it is unclear what assumptions are used as part of the Communications Assessment.

A. Provide a detailed description of the assumptions used for the submitted communications assessment summary, and provide technical justification for any deltas from the assumptions within NEI 12-01, Sections 2.2 and 2.4.

6.

In your assessment dated October 31,2012, further descriptions are needed on the notification of personnel.

A. Provide a description and procedure title of the procedure for emergency notification of essentially all plant staff within 30 minutes utilizing the existing bullhorns, sound powered telephones, and two-way radios.

B. Provide a description and procedure title of the procedure for notification of emergency response organization staff

7.

In your assessment dated October 31, 2012, further descriptions are needed to clarify how communications will be maintained during the period of final implementation of the communication enhancements.

A. Describe the interim actions that will bridge the gap until all final mitigation strategies being proceduralized are implemented.

H.B. Robinson Steam Electric Plant. Unit No.2

1.

In your assessment summary dated October 31, 2012, a communications assessment summary was provided that discusses communications from and among the site facilities and licensee staff (including the emergency operations facility and joint information center) to offsite response organizations, and NRC. Clarification is needed on how the power for the equipment analyzed is expected to be available and how planned enhancements are expected to be maintained.

-6 A. Provide a detailed description of how power will be maintained for these planned or potential improvements to the communication links and existing equipment analyzed to be available.

a. If batteries are necessary to power these bullhorns, satellite phones and radios, please identify the expected duration of the batteries before charging is required, using vendor information.
b. If batteries are necessary to power these bullhorns, satellite phones and radios, identify whether replacement batteries are expected to be necessary for a 24-hour duration and if they are sufficient.
c. If the strategy is to charge batteries using the generators purchased as an interim measure, describe the generator's availability to charge the batteries without offsite equipment for a duration of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d. Describe the ancillary equipment necessary to support communication links and provide a description about how it can support operations for a 24-hour duration (e.g., adequacy of fuel supplies for the four generators purchased; and the minimum number of battery chargers expected to be necessary).
2.

Clarification is needed on the use and function of the planned enhancements for the improvement of communications.

A. Clarify the use of the planned enhancement of the portable satellite phones.

a. Clarify whether each satellite phone identified is only to be used for maintaining the communication link identified, or if it is expected to be shared.

If the resource is expected to be shared, provide an assessment of this shared use, with a justification of why this shared use is acceptable.

Describe any impediments as a result of the shared usage.

b. Provide a general description of the satellite phones and how the equipment will be integrated for use.
c. Provide the title and general description of the procedure that will be developed and used by plant personnel to describe protocols for multi-usage.
3.

Clarification is needed on the protection of the new equipment purchased as a planned enhancement as well as the protection of existing communications equipment analyzed as being available.

A. Clarify how the existing equipment analyzed to be available and enhancements to these communication links as well as associated ancillary equipment will be stored in a manner that is protective from a large-scale natural event.

-7

a. Provide the analysis that demonstrates the expected availability of the bullhorns and radios in Attachment 5, Tables 4.1.4 and 4.2.
4.

Clarification is needed to describe programmatic controls for the use of the new equipment purchased as a planned enhancement.

A Clarify the planned proceduralization and training for the use of the programmatic controls new equipment purchased as planned enhancements. If this has not yet been finalized, provide general information for the areas below for existing communications equipment, and state whether similar programmatic controls will be applied to this equipment. It is acceptable to provide the title and description of a new procedure for new communications equipment.

a. Describe any credited manual actions and their procedures.
b. Describe any maintenance for this equipment, including operability testing.
c. Describe any periodic inventory checks.
d. Describe planned staff training.
5.

In your assessment dated October 31, 2012, it is unclear what assumptions are used as part of the Communications Assessment.

A Provide a detailed description of the assumptions used for the submitted communications assessment summary, and provide technical justification for any deltas from the assumptions within NEI12-01, Sections 2.2 and 2.4.

6.

In your assessment dated October 31, 2012, further descriptions are needed on the notification of personnel.

A Provide a description and procedure title of the procedure for emergency notification of essentially all plant staff within 30 minutes utilizing the existing bullhorns, sound powered telephones, and two-way radios.

B. Provide a description and procedure title of the procedure for notification of emergency response organization staff

7.

In your assessment dated October 31,2012, further descriptions are needed to clarify how communications will be maintained during the period of final implementation of the communication enhancements.

A Describe the interim actions that will bridge the gap until all final mitigation strategies being proceduralized are implemented.

Crystal River Nuclear Generating Plant, Unit 3

1.

In your assessment summary dated October 31, 2012, a communications assessment summary was provided which discusses communications from and among the site

- 8 facilities and licensee staff (including the emergency operations facility and joint information center) to offsite response organizations, and NRC. Clarification is needed on how the power for the equipment analyzed is expected to be available and how planned enhancements are expected to be maintained.

A. Provide a detailed description of how power will be maintained for these planned or potential improvements to the communication links and existing equipment analyzed to be available.

a. If batteries are necessary to power these bullhorns, satellite phones and radios, please identify the expected duration of the batteries before charging is required.
b. If batteries are necessary to power these bullhorns, satellite phones and radios, identify whether replacement batteries are expected to be necessary for a 24-hour duration and if they are sufficient.
c. If the strategy is to charge batteries using the generators purchased as an interim measure, describe the generator's availability to charge the batteries without offsite equipment for a duration of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d. Describe the ancillary equipment necessary to support communication links and provide a description about how it can support operations for a 24-hour duration (e.g., adequacy of fuel supplies for the four generators purchased; and the minimum number of battery chargers expected to be necessary).
2.

Clarification is needed on the use and function of the planned enhancements for the improvement of communications.

A. Clarify the use of the planned enhancement of the portable satellite phones.

a. Clarify whether each satellite phone identified is only to be used for maintaining the communication link identified, or if it is expected to be shared.

If the resource is expected to be shared, provide an assessment of this shared use, with a justification of why this shared use is acceptable.

Describe any impediments as a result of the shared usage.

b. Provide a general description of the satellite phones and how the equipment will be integrated for use.
c. Provide the title and general description of the procedure that will be developed and used by plant personnel to describe protocols for multi-usage.
3.

Clarification is needed on the protection of the new equipment purchased as a planned enhancement as well as the protection of existing communications equipment analyzed as being available.

- 9 A. Clarify how the existing equipment analyzed to be available and enhancements to these communication links as well as associated ancillary equipment will be stored in a manner that is protective from a large-scale natural event.

a. Provide the analysis that demonstrates the expected availability of the sound powered phones, two-way radios, and radios in Attachment 3, Table 4.2.
4.

Clarification is needed to describe programmatic controls for the use of the new equipment purchased as a planned enhancement.

A. Clarify the planned proceduralization and training for the use of the programmatic controls new equipment purchased as planned enhancements. If this has not yet been finalized, provide general information for the areas below for existing communications equipment, and state whether similar programmatic controls will be applied to this equipment. It is acceptable to provide the title and description of a new procedure for new communications equipment.

a. Describe any credited manual actions and their procedures.
b. Describe any maintenance for this equipment, including operability testing.
c. Describe any periodic inventory checks.
d. Describe planned staff training.
5.

In your assessment dated October 31,2012, it is unclear what assumptions are used as part of the Communications Assessment.

A. Provide a detailed description of the assumptions used for the submitted communications assessment summary, and provide technical justification for any deltas from the assumptions within NEI12-01, Sections 2.2 and 2.4.

6.

In your assessment dated October 31,2012, further descriptions are needed on the notification of personnel.

A. Provide a description and procedure title of the procedure for emergency notification of essentially all plant staff within 30 minutes utilizing the existing bullhorns, sound powered telephones, and two-way radios.

B. Provide a description and procedure title of the procedure for notification of emergency response organization staff

7.

In your assessment dated October 31,2012, further descriptions are needed to clarify how communications will be maintained during the period of final implementation of the communication enhancements.

A. Describe the interim actions that will bridge the gap until all final mitigation strategies being proceduralized are implemented.

M. Annacone, et al.

- 2 The NRC considers that timely responses to requests for additional information help ensure sufficient time is available for the NRC staff review and contribute toward the NRC's goal of efficient and effective use of staff resources.

Should you have any questions regarding this letter, please contact me at (301) 415-3302.

Sincerely, IRA by Andrew Han fori Araceli T. Billoch Col6n, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325,50-324,50-302, 50-261, and 50-400

Enclosure:

Request for Additional Information cc: Distribution via Listserv DISTRI BUTION:

PUBLIC RidsNrrDorlLpl2-2 RidsN rrLABClayton LPL2-2 R/F RidsNrrDorlDpr RidsOgcRp RidsRgn2MailCenter RidsNrrDorl RidsAcrsAcnw_MailCTR RidsN rrPMShearonHarris RidsNrrPM Brunswick RidsOgcRp RidsNrrPM Robinson RidsNrrPMCrystalRiver RidsNsirDrpDdepNrlb ADAMS A ccesslon N0.: ML12355A659

  • Bsy Memo OFFICE LPL2-2/PM LPL2-2/LA NAME AHon for ABillochCol6n BClayton DATE 12/21/12 12/20/12

'iCE LPL2-2/BC(A)

LPL2-2/PM ME ABiliochCol6n for JQuichocho AHon for ABiliochCol6n i

ATE 12/21/12 12/21/12 NSIR/DRP/DDEP/NRLB/BC*

KWilliams 12/20/12 i

OFFICIAL RECORD COPY