ril 27, 2007

SUBJECT:

CRYSTAL RIVER NUCLEAR PLANT - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000302/2007401

Dear Mr. Young:

On March 30, 2007, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Crystal River Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with you and other members of your staff on March 30, 2007. A re-exit was conducted on April 18, 2007, with Mr. M. Widner and other staff personnel.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one licensee-identified finding of very low security significance (i.e.,

Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. The finding was licensee identified. The NRC is treating this violation as a non-cited violation consistent with Section VI.A.1 of the NRCs Enforcement Policy because of the very low safety significance of the violation and because it is entered into your corrective action program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED

Progress Energy 2 DOCUMENT CONTAINS the U.S. Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, D. C.

20555-0001, with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D. C. 20555-0001; and the NRC Resident Inspector at the Crystal River Nuclear Plant.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,

/RA/

Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72 Enclosure: NRC Inspection Report No. 05000302/2007401 w/Attachment: Supplemental Information cc w/encl:

Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C)

15760 West Power Line Street Crystal River, FL 34428-6708 (cc w/encl contd - See page 3)

DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED

Progress Energy 3 DOCUMENT CONTAINS (cc w/encl contd)

Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C)

15760 West Power Line Street Crystal River, FL 34428-6708 Terry D. Hobbs Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C)

15760 West Power Line Street Crystal River, FL 34428-6708 Michael J. Annacone Engineering Manager Crystal River Nuclear Plant (NA2C)

15760 West Power Line Street Crystal River, FL 34428-6708 R. Alexander Glenn Associate General Counsel (MAC - BT15A)

Florida Power Corporation P. O. Box 14042 St. Petersburg, FL 33733-4042 Steven R. Carr Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC P. O. Box 1551 Raleigh, NC 27602-1551 cc w/o encl:

Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 (cc w/o encl contd - See page 4)

DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED

Progress Energy 4 DOCUMENT CONTAINS (cc w/o encl contd)

William A. Passetti Bureau of Radiation Control Department of Health 2020 Capital Circle, SE, Bin #C21 Tallahassee, FL 32399-1741 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, VA 22209 Distribution w/encl:

D. Riffle, NSIR Distribution w/o encl:

B. Mozafari, NRR RIDSNRRDIRS PUBLIC DOCUMENT CONTAINS ENCLOSURE CONTAINS UPON SEPARATION THIS PAGE IS DECONTROLLED

_________________________

OFFICE RII:DRS RII:DRS SIGNATURE RA RA RA RA NAME KDAVIS IHALL JSHEHEE JMUNDAY MERNSTES DATE 4/24/07 4/27/07 4/27/07 4/ /07 4/24/07 E-MAIL YES NO YES NO YES NO YES NO YES NO PUBLIC YES w/o SGI YES w/o SGI YES w/o SGI YES w/o SGI YES w/o SGI