Letter Sequence Request |
|---|
TAC:ME1081, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEAR05000255/LER-2008-007-01, Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints2009-01-21021 January 2009 Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints Project stage: Request NRC 2009-0030, License Amendment Request 261, Extended Power Uprate2009-04-0707 April 2009 License Amendment Request 261, Extended Power Uprate Project stage: Request ML0912505692009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices Project stage: Request ML0910006472009-04-0808 April 2009 Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study Project stage: Request NRC 2009-0058, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-06-0101 June 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI NRC 2009-0066, License Amendment Request 261 Supplement 1 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 1 Extended Power Uprate Project stage: Supplement NRC 2009-0068, License Amendment Request 261 Supplement 2 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 2 Extended Power Uprate Project stage: Supplement ML0917603382009-06-29029 June 2009 Deferral of the Extended Power Uprate Acceptance Review and Acceptance Review of the Auxiliary Feedwater Modifications and Non Conservative Setpoint Technical Specifications Project stage: Acceptance Review ML0921905632009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation Project stage: Request ML0922402982009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2) Project stage: Request ML0922500082009-08-25025 August 2009 Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review ML0923104542009-08-26026 August 2009 Request for Additional Information from Electrical Engineering Branch Regarding Auxiliary Feedwater Project stage: RAI ML0924305172009-08-31031 August 2009 Notice of Meeting on AFW Modifications, Questions to Be Discussed Project stage: Meeting L-2009-207, Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan2009-09-11011 September 2009 Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan Project stage: Request NRC 2009-0094, License Amendment Request 261 Extended Power Uprate Expedited Review Request2009-09-11011 September 2009 License Amendment Request 261 Extended Power Uprate Expedited Review Request Project stage: Request ML0923211842009-09-14014 September 2009 Meeting Summary, Meeting with FPL Energy Point Beach, LLC, on the Extended Power Uprate and Alternate Source Term Amendments Project stage: Meeting NRC 2009-0098, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-09-25025 September 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0108, License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions2009-10-0909 October 2009 License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions Project stage: Request ML0928005432009-10-19019 October 2009 Nonacceptance with the Opportunity to Supplement Letter for Extended Power Uprate Project stage: Other ML0929305162009-10-22022 October 2009 Request for Additional Information from Mechanical and Civil Engineering Branch Auxiliary Feedwater Modification Project stage: RAI ML0929308342009-10-22022 October 2009 Request for Additional Information from Balance of Plant Branch Auxiliary Feedwater Modification Project stage: RAI ML0929201272009-10-28028 October 2009 Summary of Meeting with FPL Energy Point Beach, LLC on the Auxiliary Feedwater Modification Amendment Project stage: Meeting ML0930205422009-11-0404 November 2009 Acceptance Review of Requested Licensing Action Regarding Extended Power Uprate Project stage: Acceptance Review ML0930603312009-11-0505 November 2009 Request for Additional Information from Technical Specification Branch Non-conservative Setpoint Changes (TAC Nos. ME1083 & ME1084) Project stage: RAI ML0930603012009-11-0606 November 2009 Request for Additional Information from Technical Specifications Branch Regarding Auxiliary Feedwater Project stage: RAI NRC 2009-0114, Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study2009-11-13013 November 2009 Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study Project stage: Request ML0931402312009-11-16016 November 2009 Request for Additional Information from Balance of Plant Branch Regarding Main Feedwater Isolation Valves Project stage: RAI NRC 2009-0125, License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System2009-11-20020 November 2009 License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System Project stage: Response to RAI NRC 2009-0123, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint2009-11-20020 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint Project stage: Response to RAI NRC 2009-0116, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0115, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0932400282009-11-24024 November 2009 Request for Additional Information from Reactor Systems Branch Regarding Extended Power Uprate Project stage: RAI NRC 2009-0124, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2009-11-30030 November 2009 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0120, License Amendment Request 261, Supplement 3 Extended Power Uprate2009-12-0808 December 2009 License Amendment Request 261, Supplement 3 Extended Power Uprate Project stage: Supplement NRC 2009-0122, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-16016 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0128, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-21021 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0935002032009-12-22022 December 2009 Request for Additional Information from Reactor Systems Branch EPU Expedited Portions Project stage: RAI NRC 2010-0003, License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information2010-01-0808 January 2010 License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information Project stage: Request ML1000800812010-01-13013 January 2010 Request for Additional Information from Balance of Plant Branch Extended Power Uprate Project stage: RAI NRC 2010-0005, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2010-01-13013 January 2010 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI ML1002500112010-01-22022 January 2010 Response Request for Additional Information License Amendment Request 261 Extended Power Uprate Project stage: Request NRC 2010-0013, License Amendment Request 264 - Diesel Fuel Oil Storage Requirements2010-01-27027 January 2010 License Amendment Request 264 - Diesel Fuel Oil Storage Requirements Project stage: Request ML1001203312010-02-0101 February 2010 Request for Additional Information from Electrical Engineering Branch Auxiliary Feedwater - Round 2 Project stage: RAI NRC 2010-0022, License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-02-25025 February 2010 License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Request NRC 2010-0012, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation2010-03-0303 March 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation Project stage: Request ML1006803682010-03-10010 March 2010 Notice of Meeting with FPL Energy Point Beach, LLC, to Discuss the Alternative Source Term, Auxiliary Feedwater, and Extended Power Uprate Amendments Project stage: Meeting ML1007806102010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007506852010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1008103682010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007804772010-03-31031 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI 2009-04-08
[Table View] |
Text
01/01/1999 00:02 7157743374 CHRIS LAPORGE PAGE ý 01 Y~il _ 7 mIi 8:1 Janua/y6, 2011 Chief Rules and Directive Branch TWB-05-BO1M Division of Administrative Services Office of Administration U.S. NIRC Washington, DC 20555-0001 Christopher LaForge Great Northern Solar 77480 Evergreen Rd Ste. 1 Port Wing, WI 54865 Re.
Point Beach Extended Power Uprate (EPU) proposal Federal Register 10 Dec. 2010, Vol. 75, No. 237, page 77010-77017 Docket Nos. 50-266 and 50-301; NRC-2010-0380 To the Chief, Rules and Directive Branch:
Please deny the Point Beach's "extended power uprate" (EPU) proposal.
The "Uprate" will swress the already faulty systems of the 40-year-old reactors (see list of operating failures appendix 1).
The proposal admits that the "uprate" will increase radioactive exposure to the local population:
The Federal Register notification for this proposal (<htp,.//edcket.access._pogov/20IO12010-31085.htm>) admits that approval would cause a 17 percent increase in the radioactivity in the gaseous and liquid waste produced by the reactors (p. 77014). But surprisingly, the Environmental Assessment (EA) asserts that no improvements or alternations in current reactor or waste treatment machinery will be necessitated by the Extended Power Uprate (p. 77015).
The notice states:
"Offsite Doses at EPU Conditions:
"The primary sources of offaite dose to members of the public from the PBNP are radioactive gaseous and liquid effluents. As discussed above, operation at the proposed EPU conditions will not change the radioactive gaseous and liquid waste management systems' abilities to perform their intended functions. Also, there would be no change to the radiation monitoring system and procedures used to control the release of radioactive effluents in accordance with NRC radiation protection standards in 10 CFR Part 20 and Appendix I to 10 CFR Part 50.
."Based on the above, the offsite radiation dose to members of the public would continue to be within regulatory limits and therefore, would not be significant."
Plants like this should be phased out as soon a possible to reduce further public hazard. The plant creates exposure to ionizing radiation.
Any and all exposure to ionizing radiation, internal or external, increases one's chances of cancer, birth defects, immune system dysfunction and other illnesses. The consequences of radiation exposure are kmown to be far more severe in the case of women, children, infants, fetuses and persons with compromised immune systems than in the case of "Reference Man" the standard still used by the NRC to estimate radiation risk.
/-/-)-H3 C7ý63-
01/01/1999 00:02 7157743374 CHRIS LAFORGE, PAGE 02 Because the operators of the Point Beach reactor complex have already been convicted of and fined $60,000 in 2005 forprowindg false information to federal regulators.- and. $325,000 for 16 other violations - claims by the licensee in-the Federal Register notification and in the licensee's EA above should be closely scrnlinized.
Because the two reactors in question are 40 years old they cannot be expected to operate safely even at low power.
Forthese, important reasons theproposed.power, uprate should.be denied. and decommissioning of the entire fility Abulddbe put on-the ajenda, and fast tracked.
Energetica lly.
s Appendix 1: pa~rtial :record of its omperratinng fail
- On January 15, 2009 PBNP Unit I experienced a complete loss of all offsite electric power to essential buses for more than 15 minutes, an "Unusual Event" emergency mandating notification of the NRC. (NRC Event 43907)
- On August 22, 2006, the NRC charged in a letter to the PBNP that a senior reactor operator was discriminated against by PBNP management for identifying potential technical violations, in violation of employee protection requirements. (NRC, "Point Beach Summary," Inspection Procedure 95002,
<nrc.gov/reactorWoperating/opsc perience/degraded-comrerstonept-beach-summary.htn)
- On December 13, 2005, a manual reactor trip shut down PBNP Unit I due to the loss of a condenser vamcm caused by the failure of the running circulating water pump. (Notification of NRC, Der. 13, 2005, event date Dec. 13, 2005) Other emergency shutdowns caused by cooling water problems or electrical-accidents have occurred Nov. IS, 1997; July 25, 1997; and March 30. 1995. (Milwaukee Journal Sentinet, Nov. 18, 1997; August 25, 1997; and Wisconsin State Journal, March 30, 1995)
- In November 2004, while operating a 100 percent power, PBNP Unit 2 sprang a steam leak from a valve--
in the main steam-flow transmitter. Operators declared a Technical Specification Condition "not met,"
forcing the isolation of the "affected penetration flow path with a completion time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />." However operators were unable to meet the required completion time of this task. (NRC Event 41212, Notificatin date Nov. 11, 2004)
- PBNP was fined $60,000, imposed March 20, 2004, for problems with the reactor's backup cooling
.pumps, according to the Capital Times, March 20, 2004.
- On Feb. 11, 2004, the ongoing risk of a breakdown in the cooling feed-water pumps at PBNP resulted in a NRC "Red Finding", the agency's most severe safety failure warning. (NRC News, Feb. 11, 2004)
- In August 1997, the NRC recorded 21 violations of its regulations by PBNP in the 90-day period between December 1996 and Feb. 1997. (St. Paul Pioneer Press, September 12, 1997)
- PBNP was fined $325,000 for 16 safety violations and a 1996 explosion inside a loaded high0level waste cask The NRC said BPNP was "inattentive to their duties," "starting up a power unit while one of its safety systems was inoperable," and failed to install "the required number of cooling pumps." (Milwaukee Journal Seninel, August 12, 1997 and Dec. 5, 1996)