Letter Sequence Request |
|---|
TAC:ME1081, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEAR05000255/LER-2008-007-01, Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints2009-01-21021 January 2009 Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints Project stage: Request NRC 2009-0030, License Amendment Request 261, Extended Power Uprate2009-04-0707 April 2009 License Amendment Request 261, Extended Power Uprate Project stage: Request ML0912505692009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices Project stage: Request ML0910006472009-04-0808 April 2009 Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study Project stage: Request NRC 2009-0058, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-06-0101 June 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI NRC 2009-0066, License Amendment Request 261 Supplement 1 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 1 Extended Power Uprate Project stage: Supplement NRC 2009-0068, License Amendment Request 261 Supplement 2 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 2 Extended Power Uprate Project stage: Supplement ML0917603382009-06-29029 June 2009 Deferral of the Extended Power Uprate Acceptance Review and Acceptance Review of the Auxiliary Feedwater Modifications and Non Conservative Setpoint Technical Specifications Project stage: Acceptance Review ML0921905632009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation Project stage: Request ML0922402982009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2) Project stage: Request ML0922500082009-08-25025 August 2009 Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review ML0923104542009-08-26026 August 2009 Request for Additional Information from Electrical Engineering Branch Regarding Auxiliary Feedwater Project stage: RAI ML0924305172009-08-31031 August 2009 Notice of Meeting on AFW Modifications, Questions to Be Discussed Project stage: Meeting L-2009-207, Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan2009-09-11011 September 2009 Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan Project stage: Request NRC 2009-0094, License Amendment Request 261 Extended Power Uprate Expedited Review Request2009-09-11011 September 2009 License Amendment Request 261 Extended Power Uprate Expedited Review Request Project stage: Request ML0923211842009-09-14014 September 2009 Meeting Summary, Meeting with FPL Energy Point Beach, LLC, on the Extended Power Uprate and Alternate Source Term Amendments Project stage: Meeting NRC 2009-0098, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-09-25025 September 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0108, License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions2009-10-0909 October 2009 License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions Project stage: Request ML0928005432009-10-19019 October 2009 Nonacceptance with the Opportunity to Supplement Letter for Extended Power Uprate Project stage: Other ML0929305162009-10-22022 October 2009 Request for Additional Information from Mechanical and Civil Engineering Branch Auxiliary Feedwater Modification Project stage: RAI ML0929308342009-10-22022 October 2009 Request for Additional Information from Balance of Plant Branch Auxiliary Feedwater Modification Project stage: RAI ML0929201272009-10-28028 October 2009 Summary of Meeting with FPL Energy Point Beach, LLC on the Auxiliary Feedwater Modification Amendment Project stage: Meeting ML0930205422009-11-0404 November 2009 Acceptance Review of Requested Licensing Action Regarding Extended Power Uprate Project stage: Acceptance Review ML0930603312009-11-0505 November 2009 Request for Additional Information from Technical Specification Branch Non-conservative Setpoint Changes (TAC Nos. ME1083 & ME1084) Project stage: RAI ML0930603012009-11-0606 November 2009 Request for Additional Information from Technical Specifications Branch Regarding Auxiliary Feedwater Project stage: RAI NRC 2009-0114, Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study2009-11-13013 November 2009 Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study Project stage: Request ML0931402312009-11-16016 November 2009 Request for Additional Information from Balance of Plant Branch Regarding Main Feedwater Isolation Valves Project stage: RAI NRC 2009-0125, License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System2009-11-20020 November 2009 License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System Project stage: Response to RAI NRC 2009-0123, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint2009-11-20020 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint Project stage: Response to RAI NRC 2009-0116, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0115, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0932400282009-11-24024 November 2009 Request for Additional Information from Reactor Systems Branch Regarding Extended Power Uprate Project stage: RAI NRC 2009-0124, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2009-11-30030 November 2009 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0120, License Amendment Request 261, Supplement 3 Extended Power Uprate2009-12-0808 December 2009 License Amendment Request 261, Supplement 3 Extended Power Uprate Project stage: Supplement NRC 2009-0122, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-16016 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0128, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-21021 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0935002032009-12-22022 December 2009 Request for Additional Information from Reactor Systems Branch EPU Expedited Portions Project stage: RAI NRC 2010-0003, License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information2010-01-0808 January 2010 License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information Project stage: Request ML1000800812010-01-13013 January 2010 Request for Additional Information from Balance of Plant Branch Extended Power Uprate Project stage: RAI NRC 2010-0005, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2010-01-13013 January 2010 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI ML1002500112010-01-22022 January 2010 Response Request for Additional Information License Amendment Request 261 Extended Power Uprate Project stage: Request NRC 2010-0013, License Amendment Request 264 - Diesel Fuel Oil Storage Requirements2010-01-27027 January 2010 License Amendment Request 264 - Diesel Fuel Oil Storage Requirements Project stage: Request ML1001203312010-02-0101 February 2010 Request for Additional Information from Electrical Engineering Branch Auxiliary Feedwater - Round 2 Project stage: RAI NRC 2010-0022, License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-02-25025 February 2010 License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Request NRC 2010-0012, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation2010-03-0303 March 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation Project stage: Request ML1006803682010-03-10010 March 2010 Notice of Meeting with FPL Energy Point Beach, LLC, to Discuss the Alternative Source Term, Auxiliary Feedwater, and Extended Power Uprate Amendments Project stage: Meeting ML1007806102010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007506852010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1008103682010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007804772010-03-31031 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI 2009-04-08
[Table View] |
Text
IFrom 1.877.233.3839 Fri Jan 7 14:46:25 2011 PST Page 1 of 4 FAX TO:
Chief, Rules and Directive Branch, RDB FROM:
Susan Michetti COMPANY:
U.S. NRC COMPANY:
FAX:
3014923446 FAX:
SUBJECT:
Proposed 17% EPU at Point Beach WI DATE:
Friday, January 07, 2011 Reactors 170')2ý
-TD
_C-.
(f KS O~?)5?i7 At' -p2/3 S
From 1.877.233.3839 Fri Jan 7 14:46:25 2011 PST Page 2 of 4 6 January 2011 Chief, Rules and Directive Branch, RDB TWB-05-BOl M Division of Administrative Services Office of Administration U.S. NRC Washington, DC 20555-0001 RE: Dec. 10, 2010, Vol. 75, No. 237, page 77010-77017, and Docket Nos. 50-266 and 50-301; NRC-2010-0380.
To Whom It May Concern re the proposed 17% EPU at Point Beach WI Reactors:
The NRC's draft Environmental Assessment is dead wrong about no significant impact resulting from a 17% "extended power uprate (EPU)" at the Point Beach WI reactors. This is sleight of hand from playing with process in ways that are less than open and honest. I ask that the NRC's draft EA go back and incorporate all the comments of concerns from the recent relicensing process appearance, including my own and those of others, which were dismissed on technical grounds, meaning that they apparently were concerns that were not required to be examined during the relicensing process. Concerns about dilapidation of a nuclear reactor involving tritium leakage into ground water and into other drinking water sources as well as other important safety issues were dismissed without serious examination during the relicensing process. I ask where in the process do these concerns get addressed seriously, if not in relicensing and if not in upping the power of dilapitated leaky parts that are not adequately addressed in a serious way for public safety? These serious concerns should not be able to dismissed again now when the owners desire to up the power and to up the serious radioactive leakage. NRC HAS NOT ADEQUATELY ADDRESSED THE TRITIUM LEAK AS WELL AS OTHER KNOWN ISSUES. This NRC process has become untrustworthy and needs to be examined by authorities above the NRC as inadequate to protect public safety.
The lack of public safety protection is a serious issue. The NRC's draft does not state explicitly any effects on aquatic communities in Lake Michigan of the proposed EPU, including known trititium leakage already existing. It does not state explicitly any effects on the workers at the plant of the proposed EPU. The draft uses wording such at "not expected, negligable, not significant, and adequate." These words inspire little confidence that this planned increase is an innocuous choice given Point Beach's previous safety violations. I expect more specific assurances without a world full of slide room when -the problems develop and endanger public safety.
The Federal Register notification for this proposal (< http://edocket.access.gpo.
From 1.877.233.3839 Fri Jan 7 14:46:25 2611 PST Page 3 of 4 aov/2010/2010-31085.htm >) admits that approval would cause a 17 percent increase in the radioactivity in the gaseous and liquid waste produced by the reactors (p. 77014). But surprisingly, the Environmental Assessment (EA) asserts that no improvements in current reactor or waste treatment machinery will be necessitated by the Extended Power Uprate (EPU) (p. 77015), and I view this as illogical minimizing of issues.
The notice states:
"Offsite Doses at EPU Conditions "The primary sources of offsite dose to members of the public from the PBNP are radioactive gaseous and liquid effluents. As discussed above, operation at the proposed EPU conditions will not change the radioactive gaseous and liquid waste management systems' abilities to perform their intended functions. Also, there would be no change to the radiation monitoring system and procedures used to control the release of radioactive effluents in accordance with NRC radiation protection standards in 10 CFR Part 20 and Appendix I to 10 CFR Part 50.
"Based on the above, the offsite radiation dose to members of the public would continue to be within regulatory limits and therefore, would not be significant."
This false assertion comes out of fantasy-land. It does not incorporate rational scientific thinking, which would be expected, but apparently those preparing these reports lack adquate scientifical understanding of radioactivity and public safetly. This is too preposterous to be taken seriously. Any and all exposure to ionizing radiation, internal or external, increases one's chances of cancer, birth defects, immune system dysfunction and other illnesses. Radioactivity is the most toxic chemical on earth.
Since the operators of this reactor complex have already been convicted of and fined
$60,000 for providing false information to federal regulators in 2005, absolutely nothing claimed by the licensee in Federal Register notification and the the EA should be accepted as fact without complete supporting documentation that does not have signficant omissions. The facts must be scrutinized with the utmost skepticism expected of the scientific process.
The two reactors involved are 40 years old and delapidated. They have a record of poor operations and accidents, including unsolved tritium leakage into groundwater with an increasing plume when the tritium leakage HAS NOT BE SOLVED AND STOPPED AS EXPECTED TO MEET PUBLIC SAFETY REQUIREMENTS. The owners have been convicted of harassing whistleblowers and of lying to government regulators, and this indicates that their reliability and trustworthiness is questionable at best. They cannot be expected to operate safely even at low power.
The proposed power uprate should be absolutely denied.
Sincerely,
From 1.877.233.3839 Fri Jan 7 14:46:25 2011 PST Page 4 of 4 Susan Michetti 605 Sheila St.
Mt Horeb WI 53572