ML102600379

From kanterella
Jump to navigation Jump to search

Email: Point Beach Nuclear Plant, Units 1 and 2 - Requests for Additional Information (Eeeb) AFW Modification LAR (TAC Nos. ME1081 and 1082)
ML102600379
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/16/2010
From: Beltz T
Plant Licensing Branch III
To: Hale S
Point Beach
beltz T, NRR/DORL/LPL3-1, 301-415-3049
Shared Package
ML102600388 List:
References
TAC ME1081, TAC ME1082
Download: ML102600379 (2)


Text

From:

Beltz, Terry Sent:

Thursday, September 16, 2010 11:09 AM To:

'Hale, Steve' Cc:

'Costedio, Jim'; 'Flentje, Fritzie'; 'liz.abbott@fpl.com'; Matharu, Gurcharan

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Requests for Additional Information (EEEB) re: AFW Modification LAR (TAC Nos. ME1081 and ME1082)

Attachments:

Point Beach Units 1 and 2 - AFW Modification LAR_Requests for Additional Information_EEEB (TAC Nos. ME1081 & ME1082).docx

Dear Mr. Hale:

The U.S. Nuclear Regulatory Commission staff (NRC) in the Electrical Engineering Branch of the Office of Nuclear Reactor Regulation is reviewing the Auxiliary Feedwater Modification license amendment request for the Point Beach Nuclear Plant, Units 1 and 2. The staff determined that additional information is required to continue its review. Draft requests for additional information (RAIs) were sent to you via e-mail on September 13, 2010, and subsequently discussed with you and your staff during a September 16, 2010, teleconference.

As a result of the teleconference, the draft RAIs were revised. The revisions were discussed with you and your staff, and were found to be clear and acceptable for formal issuance.

The formal RAIs are being provided as an attachment to this e-mail. As discussed with you on September 16, 2010, NextEra Energy Point Beach, LLC, will provide a response to the RAIs no later than September 27, 2010.

Please don't hesitate to contact me if you have any questions or concerns.

Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov E-mail Properties Mail Envelope Properties (87B1F1BDFE5A554CA9DC5EAA75EB6D0D2421B0131A)

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Requests for Additional Information (EEEB) re: AFW Modification LAR (TAC Nos. ME1081 and ME1082)

Sent Date: 9/16/2010 11:09:27 AM Received Date: 9/16/2010 11:09:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov

Recipients:

Steve.Hale@nexteraenergy.com ('Hale, Steve')

Tracking Status: None james.costedio@nexteraenergy.com ('Costedio, Jim')

Tracking Status: None fritzie.flentje@nexteraenergy.com ('Flentje, Fritzie')

Tracking Status: None liz.abbott@fpl.com ('liz.abbott@fpl.com')

Tracking Status: None Gurcharan.Matharu@nrc.gov (Matharu, Gurcharan)

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 40449 9/16/2010 Point Beach Units 1 and 2 - AFW Modification LAR_Requests for Additional Information_EEEB (TAC Nos. ME1081 & ME1082).docx 27406 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: