Letter Sequence Response to RAI |
---|
TAC:ME1044, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME1045, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement
|
MONTHYEARNRC-2008-0086, License Amendment Request 258 Incorporate Best Estimate Large Break Loss of Coolant Accident (LOCA) Analysis Using Astrum2008-11-25025 November 2008 License Amendment Request 258 Incorporate Best Estimate Large Break Loss of Coolant Accident (LOCA) Analysis Using Astrum Project stage: Request NRC 2009-0030, License Amendment Request 261, Extended Power Uprate2009-04-0707 April 2009 License Amendment Request 261, Extended Power Uprate Project stage: Request NRC 2009-0068, License Amendment Request 261 Supplement 2 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 2 Extended Power Uprate Project stage: Supplement NRC 2009-0066, License Amendment Request 261 Supplement 1 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 1 Extended Power Uprate Project stage: Supplement NRC 2009-0094, License Amendment Request 261 Extended Power Uprate Expedited Review Request2009-09-11011 September 2009 License Amendment Request 261 Extended Power Uprate Expedited Review Request Project stage: Request NRC 2009-0098, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-09-25025 September 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0116, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0115, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0124, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2009-11-30030 November 2009 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0120, License Amendment Request 261, Supplement 3 Extended Power Uprate2009-12-0808 December 2009 License Amendment Request 261, Supplement 3 Extended Power Uprate Project stage: Supplement NRC 2009-0122, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-16016 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0128, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-21021 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0013, License Amendment Request 264 - Diesel Fuel Oil Storage Requirements2010-01-27027 January 2010 License Amendment Request 264 - Diesel Fuel Oil Storage Requirements Project stage: Request NRC 2010-0022, License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-02-25025 February 2010 License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Request NRC 2010-0012, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation2010-03-0303 March 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation Project stage: Request NRC 2010-0037, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2010-04-29029 April 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0060, License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information2010-04-30030 April 2010 License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML1013401032010-05-13013 May 2010 License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0063, License Amendment Request 261, Extended Power Uprate Response to Request for Additional Information2010-06-11011 June 2010 License Amendment Request 261, Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0039, License Amendment Request 261 Extended Power Uprate, Transmittal of Attachments 3 and 4 to NRC 2010-00392010-07-15015 July 2010 License Amendment Request 261 Extended Power Uprate, Transmittal of Attachments 3 and 4 to NRC 2010-0039 Project stage: Request ML1020401382010-07-21021 July 2010 License Amendment Request 261 Extended Power Uprate, Transmittal of Sample Reactor Protection System/Engineered Safety Features Actuation System Instrumentation Setpoint Calculations Project stage: Request NRC 2010-0105, License Amendment Request 261, Supplement 6 Extended Power Uprate2010-07-28028 July 2010 License Amendment Request 261, Supplement 6 Extended Power Uprate Project stage: Supplement ML1021702352010-08-0202 August 2010 Email Attachment: Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs Extended Power Uprate and Associated with Diesel FO Storage Requirements Project stage: Draft RAI NRC 2010-0112, License Amendment Request 261, Extended Power Uprate Transmittal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-08-0202 August 2010 License Amendment Request 261, Extended Power Uprate Transmittal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Request ML1022406372010-08-11011 August 2010 Draft RAIs Extended Power Uprate (TAC Nos. ME1044 & ME1045 Project stage: Draft RAI NRC 2010-0133, License Amendment Request 261, Extended Power Uprate, Regulatory Commitment Change2010-08-12012 August 2010 License Amendment Request 261, Extended Power Uprate, Regulatory Commitment Change Project stage: Request NRC 2010-0116, License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information2010-08-23023 August 2010 License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0123, Response to Request for Additional Information on License Amendment Request 261 Extended Power Uprate2010-08-26026 August 2010 Response to Request for Additional Information on License Amendment Request 261 Extended Power Uprate Project stage: Response to RAI ML1025603032010-09-0303 September 2010 Summary of Teleconference to Clarify RAI Response Regarding Dynamic Analysis of Feedwater Valve Fast Closure Project stage: Meeting NRC 2010-0148, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2010-09-27027 September 2010 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2010-0146, License Amendment Request 261, Extended Power Uprate, Withdrawal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-09-28028 September 2010 License Amendment Request 261, Extended Power Uprate, Withdrawal of Proposed Technical Specifications for Reactor Protection System and Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Withdrawal ML1028002632010-10-0404 October 2010 AFW Modification LAR Requests for Additional Information - Scvb Project stage: RAI ML1028105912010-10-0808 October 2010 Request a Conference Call to Discuss Some Issues Found in Recent Submittals Re. Extended Power Uprate Project stage: Other NRC 2010-0161, License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Lnformation2010-10-15015 October 2010 License Amendment Request 261 Extended Power Uprate, Response to Request for Additional Lnformation Project stage: Request ML1031906532010-11-0808 November 2010 Draft Requests for Additional Information, (Srxb) EPU LAR Review Project stage: Draft RAI NRC 2010-0189, License Amendment Request 261, Extended Power Uprate Response to Request for Clarification2010-12-21021 December 2010 License Amendment Request 261, Extended Power Uprate Response to Request for Clarification Project stage: Request NRC 2010-0195, License Amendment Request 261 Extended Power Uprate Response to Request for Clarification2010-12-21021 December 2010 License Amendment Request 261 Extended Power Uprate Response to Request for Clarification Project stage: Request ML1101103532011-01-0707 January 2011 Comment (4) of Dennis Dums and Katie Nekola, on Point Beach, Units 1 & 2 Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other NRC 2011-0003, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2011-01-13013 January 2011 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2011-0013, License Amendment Request 261 Extended Power Uprate, Response to Request for Clarification2011-01-21021 January 2011 License Amendment Request 261 Extended Power Uprate, Response to Request for Clarification Project stage: Request ML1103200602011-03-25025 March 2011 (Pbnp), Units 1 and 2 - Issuance of License Amendments Revision of Reactor Protection System (RPS) and Engineered Safety Feature Actuation System (ESFAS) Instrumentation Setpoints Project stage: Approval 2010-04-29
[Table View] |
|
---|
Category:Letter type:NRC
MONTHYEARNRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary NRC 2019-0032, CFR 50.59 Evaluation and Commitment Change Summary Report2019-10-18018 October 2019 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2019-0042, NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information2019-10-17017 October 2019 NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information 2023-07-07
[Table view] |
Text
April 29,2010 NRC 2010-0037 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 License Amendment Reauest 261 Extended Power U ~ r a t e Res~onseto Reauest for Additional lnformation
References:
(1) FPL Energy Point Beach, LLC letter to NRC, dated April 7,2009, License Amendment Request 261, Extended Power Uprate (ML091250564)
(2) NRC letter to NextEra Energy Point Beach, LLC, dated April 7, 2010, Point Beach Nuclear Plant, Units 1 and 2 - Request for Additional lnformation from Human Performance Branch RE: Extended Power Uprate (TAC Nos. ME1044 AND ME1045) (MLI00820370)
NextEra Energy Point Beach, LLC (NextEra) submitted License Amendment Request (LAR) 261 (Reference 1) to the NRC pursuant to 10 CFR 50.90. The proposed license amendment would increase each unit's licensed thermal power level from 1540 megawatts thermal (MWt) to 1800 MWt, and revise the Technical Specifications to support operation at the increased thermal power level.
Via Reference (2), the NRC staff determined that additional information was required to enable the staff's continued review of the request. Enclosure 1 provides the NextEra response to the NRC staff's request for additional information.
This letter contains no new Regulatory Commitments and no revisions to existing Regulatory Commitments.
The information contained in this letter does not alter the no significant hazards consideration contained in Reference (1) and continues to satisfy the criteria of 10 CFR 51.22 for categorical exclusion from the requirements of an environmental assessment.
NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
Document Control Desk Page 2 In accordance with 10 CFR 50.91, a copy of this letter is being provided to the designated Wisconsin Official.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on April 29,2010.
Very truly yours, F
NextEra .- nergy Point Beach, LLC Larry Meyer Site Vice President Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW
ENCLOSURE 1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 261 EXTENDED POWER UPRATE RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION The NRC staff determined that additional information was required (Reference 1) to enable the Human Performance Branch to complete the review of License Amendment Request (LAR) 261, Extended Power Uprate (EPU) (Reference 2). The following information is provided by NextEra Energy Point Beach, LLC (NextEra) in response to the NRC staff's request.
RAI IHPB HF-1 Describe the integrated verification and validationprocess for control room modifications and emergency operating procedure revisions.
NextEra Response A plant administrative procedure provides the requirements for verification and validation of Emergency Operating Procedures (EOPs) and Abnormal Operating Procedures (AOPs). The PBNP Operations Manager has overall responsibility for the EOP verification and validation process. Changes to EOPs and AOPs resulting from plant design changes, including control room modifications, must be processed using this procedure.
Verification of EOPs and AOPs is performed by a knowledgeable individual (or team),
independent from the document preparer. Verification of EOPs includes the following checks:
e Review of design changes and Technical Specification (TS) changes by Design Engineering personnel to ensure continued compliance with the design bases.
8 Changes to Final Safety Analysis Report (FSAR) have been initiated and approved if applicable, in accordance with the site's FSAR change process.
EOP entry conditions, consistent with those listed in the Westinghouse Owner's Group (WOG) Emergency Response Guidelines (ERGs) or deviations, are justified in the EOP deviation and background documents.
a EOP sequencing of steps consistent with those listed in the WOG ERGs or deviations are justified in the EOP deviation and background documents.
a EOP steps are consistent with those listed in the WOG ERGs or deviations are justified in the EOP deviation and background documents.
Page 1 of 5
Differences with WOG guidelines are consistent with intent of the ERGs.
Documentation is adequate to explain the intent of complex steps.
a References to all systems and components in the WOG ERGs are included in the EOP, as applicable.
- Computations specified in the procedure are consistent with the WOG ERGs or deviations are justified in the EOP deviation and background documents.
Cautions or notes specified in the procedure are consistent with the WOG ERGs or deviations are justified in the EOP deviation and background documents.
Contingency actions in the procedure are consistent with the WOG ERGs or deviations are justified in the EOP deviation and background documents.
There are no conflicts between the foldout page requirements and the procedure actions.
Procedure steps are consistent with the plant's design.
Quantitative ranges specified in the procedure are consistent with the plant design.
Limits specified in the procedure are consistent with the WOG ERGs or deviations are justified in the EOP deviation and background documents.
Charts, tables and curves presented in the procedure are consistent with the WOG ERGs or deviations are justified in the EOP deviation and background documents.
a Parameter values, numerical values and setpoints in the procedure correspond with setpoint document values.
Technical changes to EOPs are verified by Operations, Design Engineering, Probabilistic Risk Assessment, and Training personnel to maximize the effectiveness of the verification process.
Validation of EOPs and AOPs is a user review conducted by a team knowledgeable in performing the procedure to ensure that the procedure can be followed and performed by qualified individuals. The validation process involves use of a validation team. The validation team leader is selected based on the scope of the validation and the validation method(s) used.
The validation team member(s) are selected to satisfy the following criteria for technical changes to EOPs:
The team should be multi-disciplinary.
The team should collectively be knowledgeable in the areas of plant operations, training, simulator, technical bases, EOP development, and PRA.
a At least one team member shall be a licensed operator.
For validations performed on the simulator, at least one team member shall be a simulator instructor.
Page 2 of 5
EOP validation is performed using one of the following methods:
0 Simulator validation - performed on the simulator using scenarios for the procedure to be validated.
o Walkthrough validation - performed at the in-plant location(s) where the procedure would be performed.
0 Table-top validation - table-top discussion of scenario(s) that would use the EOP being validated.
The validation includes one or more scenarios that encompass the changes to the EOP(s) being validated. The validation team assesses time critical actions that might be affected by the changes.
During validation scenarios, plant failures are selected to exercise the procedure(s) being validated considering:
0 Single and multiple failures, when appropriate.
0 Concurrent and sequential failures, when appropriate.
0 Dual unit failures, when appropriate.
0 Simulator malfunctions that closely model the selected failures, if the simulator is to be used.
Personnel are assigned to resolve discrepancies identified during validation. Changes are provided as appropriate, to address discrepancies. If necessary, additional validation is performed once discrepancies have been resolved.
Plant Operations Review Committee (PORC) review and approval is required for all changes to EOPs. All technical changes to EOPs are approved by the Operations Manager or designee.
Page 3 of 5
RBI IHPB HF-2 Describe the results of task analysis and simulations petformed to establish operator action times with regard to operator actions after steam generator tube rupture.
NextEra Response Simulator changes for the EPU have not yet been completed. Consequently, operator action times for EPU have not been evaluated using the simulator. The following operator action times were determined using the current plant configuration and were used as input for the steam generator tube rupture (SGTR) analysis:
The action times listed above are not expected to change for EPU.
The SGTR margin to overfill analysis performed for EPU demonstrated the following sequence of events:
After the PBNP simulator is modified to reflect EPU, plant EOPs used for response to a SGTR will be validated and verified in accordance with the process described in the above response to IHPB HF-1. This will include timing to ensure plant operators can perform required actions supporting the SGTR analysis.
Page 4 of 5
RAI IHPB HF-3 Describe the timing for reflecting control room changes in the simulator.
NextEra Response Plant procedures for simulator configuration management ensure that simulator hardware, software and modeling enable the simulator to match plant response and ensure physical fidelity requirements, as required by ANSIIANS-3.5-1985, Nuclear Power Simulators for Use in Operator Training. Plant changes are required to be reflected in the simulator within one year following installation in the plant.
PBNP currently plans to implement changes in the simulator for EPU, alternative source term (AST), and auxiliary feedwater (AFW) prior to the change being implemented in the field. This is being done to allow just-in-time-training for Operations personnel prior to operation of the modified plant.
There are four instances where major plant changes will be implemented. These include:
AST implementation - either on-line implementation or during Unit 2 refueling outage in Spring 2011 AFW implementation - either on-line implementation or during Unit 2 refueling outage in Spring 2011 0 Unit 2 EPU - implementation during Unit 2 refueling outage in Spring 2011 Unit 1 EPU - implementation during Unit 1 refueling outage in Fall 2011.
References (1) NRC letter to NextEra Energy Point Beach, LLC, dated April 7, 2010, Point Beach Nuclear Plant, Units 1 and 2 - Request for Additional Information from Human Performance Branch RE: Extended Power Uprate (ML100820370)
(2) FPL Energy Point Beach, LLC letter to NRC, dated April 7, 2009, License Amendment Request 261, Extended Power Uprate (ML091250564)
Page 5 of 5