Email: Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs (Emcb) HELB Associated EPU License Amendment Request
ML102670737
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/10/2010
From: Beltz T
Plant Licensing Branch III
To: Hale S
Point Beach
beltz T, NRR/DORL/LPL3-1, 301-415-3049
Shared Package
ML102670745 List:
References
TAC ME1044, TAC ME1045
Download: ML102670737 (2)


Text

From:

Beltz, Terry Sent:

Friday, September 10, 2010 11:28 AM To:

Hale, Steve Cc:

James.Costedio@nexteraenergy.com; Flentje, Fritzie; liz.abbott@fpl.com; Hanneman, Harv

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs (EMCB) re: HELB Associated EPU License Amendment Request (TAC Nos. ME1044 and ME1045)

Attachments:

Point Beach, Units 1 and 2_ EMCB (HELB) RAIs re EPU LAR 261.docx

Dear Mr. Hale:

The U.S. Nuclear Regulatory Commission staff (NRC) in the Mechanical & Civil Engineering Branch of the Office of Nuclear Reactor Regulation is reviewing the Extended Power Uprate license amendment request (LAR-261) for Units 1 and 2 of the Point Beach Nuclear Plant. The staff determined that additional information is required to continue its review. In an effort to complete the review, the staff has developed draft requests for additional information (RAIs).

The draft RAIs are provided as an attachment to this e-mail.

If your require additional clarification, the NRC staff can discuss the draft RAIs with your staff in a conference call or meeting prior to formal issuance. Among other things, the discussion will include how the NRC would formally issue these questions and how the licensee will respond to them.

The sole purpose of this e-mail and its attachment is to prepare you and others for the proposed conference call or meeting. This e-mail and its attachment do not convey a formal NRC staff position, and do not formally request for additional information.

Please don't hesitate to contact me if you have any questions or concerns.

Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov E-mail Properties Mail Envelope Properties ()

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs (EMCB) re: HELB Associated EPU License Amendment Request (TAC Nos. ME1044 and ME1045)

Sent Date: 9/10/2010 8:58:50 AM Received Date: 9/10/2010 11:28:00 AM From: Beltz, Terry

Created By: Terry.Beltz@nrc.gov Recipients:

Steve.Hale@nexteraenergy.com (Hale, Steve)

Tracking Status: None James.Costedio@nexteraenergy.com (James.Costedio@nexteraenergy.com)

Tracking Status: None Fritzie.Flentje@nexteraenergy.com (Flentje, Fritzie)

Tracking Status: None liz.abbott@fpl.com (liz.abbott@fpl.com)

Tracking Status: None Harv.Hanneman@nexteraenergy.com (Hanneman, Harv)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 45723 9/10/2010 Point Beach, Units 1 and 2_ EMCB (HELB) RAIs re EPU LAR 261.docx 32918 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: