Email: Point Beach Nuclear Plant, Units 1 and 2 - Requests for Additional Additional Associated with Extended Power Uprate
ML102440059
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/26/2010
From: Beltz T
Plant Licensing Branch III
To: Hale S
Point Beach
beltz T, NRR/DORL/LPL3-1, 301-415-3049
Shared Package
ML102440095 List:
References
TAC ME1044, TAC ME1045
Download: ML102440059 (2)


Text

From:

Beltz, Terry Sent:

Thursday, August 26, 2010 7:12 AM To:

'Hale, Steve' Cc:

'liz.abbott@fpl.com'; 'COSTEDIO, JAMES'; 'Flentje, Fritzie'; 'Hanneman, Harv'

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Requests for Additional Additional Associated with Extended Power Uprate (TAC Nos. ME1044 and ME1045)

Attachments:

Point Beach, Units 1 and 2 - EPU LAR - Requests for Additional Information_EMCB.docx

Dear Mr. Hale:

By letter to the Nuclear Regulatory Commission (NRC) dated April 2, 2009 (Agencywide Document and Management System Accession No. ML091250564), NextEra Energy Point Beach, LLC (NextEra, the licensee), submitted a license amendment request (LAR), pursuant to the requirements of Title 10 of the Code of Federal Regulations Section 50.90, Application for Amendment of License or Construction Permit, for the Point Beach Nuclear Plant, Units 1 and

2. The LAR proposes to increase the power level of the current Renewed Operating License (OL) to 1,800 megawatts thermal (MWt), approximately 17% above the current licensed thermal power (CLTP) of 1,540 MWt and approximately 18.5% above the Original Licensed Thermal Power (OLTP) of 1,518.5 MWt.

The Mechanical & Civil Engineering Branch (EMCB) staff has reviewed the LAR licensing report for power uprate. The staff has identified that additional information is needed to complete its review. The staffs requests for additional information (RAI) are attached. Draft RAIs were sent to NextEra on August 13, 2010. On August 17, 2010, the NRC staff discussed the draft RAIs with you to ensure a clear understanding of the requested information. The finalized RAIs are being issued as an attachment to this e-mail.

As agreed upon, please respond to the RAIs no later than September 10, 2010. If you have any questions, please contact me at (301) 415-3049.

Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties (87B1F1BDFE5A554CA9DC5EAA75EB6D0D23116C067B)

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Requests for Additional Additional Associated with Extended Power Uprate (TAC Nos. ME1044 and ME1045)

Sent Date: 8/26/2010 7:12:09 AM Received Date: 8/26/2010 7:12:00 AM From: Beltz, Terry

Created By: Terry.Beltz@nrc.gov Recipients:

Steve.Hale@nexteraenergy.com ('Hale, Steve')

Tracking Status: None liz.abbott@fpl.com ('liz.abbott@fpl.com')

Tracking Status: None JAMES.COSTEDIO@nexteraenergy.com ('COSTEDIO, JAMES')

Tracking Status: None Fritzie.Flentje@nexteraenergy.com ('Flentje, Fritzie')

Tracking Status: None Harv.Hanneman@nexteraenergy.com ('Hanneman, Harv')

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 52883 8/26/2010 Point Beach, Units 1 and 2 - EPU LAR - Requests for Additional Information_EMCB.docx 40828 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: