Letter Sequence Other |
|---|
TAC:ME0219, Control Room Habitability, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (Open) TAC:ME0220, Control Room Habitability, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (Open) TAC:ME1044, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME1045, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARNRC 2008-0081, Submittal of License Amendment Request 241, Alternative Source Term2008-12-0808 December 2008 Submittal of License Amendment Request 241, Alternative Source Term Project stage: Request ML0835703382008-12-0808 December 2008 Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 Project stage: Request NRC 2008-0085, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 2412008-12-0808 December 2008 Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 Project stage: Request NRC 2009-0002, Supplement to License Amendment Request 241, Summary of Pbnp Sump Ph Calculation Inputs, Assumptions, Methodology and Results2009-01-16016 January 2009 Supplement to License Amendment Request 241, Summary of Pbnp Sump Ph Calculation Inputs, Assumptions, Methodology and Results Project stage: Supplement 05000255/LER-2008-007-01, Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints2009-01-21021 January 2009 Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints Project stage: Request NRC 2009-0006, Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions2009-01-27027 January 2009 Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions Project stage: Supplement ML0903707702009-01-28028 January 2009 Email Regarding Need Supplemental Information for AST Acceptance Review from Containment and Ventilation Branch Project stage: Acceptance Review NRC 2009-0023, Supplement to License Amendment Request 241 Alternative Source Term2009-02-20020 February 2009 Supplement to License Amendment Request 241 Alternative Source Term Project stage: Supplement NRC 2009-0001, Calculation Project Schedule Update2009-02-20020 February 2009 Calculation Project Schedule Update Project stage: Request ML0905501512009-02-27027 February 2009 Acceptance Review for License Amendment Request 241 Alternate Source Term Project stage: Acceptance Review ML0907110612009-03-20020 March 2009 Request for Additional Information from Csgb Branch Related to License Amendment Request No. 241 Alternate Source Term Project stage: RAI ML0835309302009-03-25025 March 2009 FPL Energy Point Beach, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Point Beach Nuclear Plant, Units 1 and 2 Project stage: Withholding Request Acceptance NRC 2009-0030, License Amendment Request 261, Extended Power Uprate2009-04-0707 April 2009 License Amendment Request 261, Extended Power Uprate Project stage: Request ML0912505692009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices Project stage: Request ML0910006472009-04-0808 April 2009 Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study Project stage: Request NRC 2009-0039, Response to Request for Additional Information License Amendment Request 241, Alternative Source Term2009-04-17017 April 2009 Response to Request for Additional Information License Amendment Request 241, Alternative Source Term Project stage: Response to RAI NRC 2009-0045, Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab)2009-04-17017 April 2009 Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab) Project stage: Supplement NRC 2009-0032, License Amendment Request 250, Corporation Name Change2009-04-17017 April 2009 License Amendment Request 250, Corporation Name Change Project stage: Request ML0909007222009-04-22022 April 2009 Request for Additional Information from Emcb Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI NRC 2009-0026, Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix2009-05-0808 May 2009 Transmittal of Supplement to License Amendment Request 241 Regulatory Guide 1.183 Compliance Matrix Project stage: Supplement ML0911105842009-05-13013 May 2009 Request for Additional Information from Reactor Systems Branch Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI NRC 2009-0054, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-05-15015 May 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI NRC 2009-0058, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-06-0101 June 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI NRC 2009-0066, License Amendment Request 261 Supplement 1 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 1 Extended Power Uprate Project stage: Supplement NRC 2009-0068, License Amendment Request 261 Supplement 2 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 2 Extended Power Uprate Project stage: Supplement ML0916205602009-06-25025 June 2009 Request for Additional Information from the Human Performance Branch Regarding License Amendment Request 241 Alternate Source Term Project stage: RAI L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 42009-06-29029 June 2009 Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 Project stage: Request ML0917603382009-06-29029 June 2009 Deferral of the Extended Power Uprate Acceptance Review and Acceptance Review of the Auxiliary Feedwater Modifications and Non Conservative Setpoint Technical Specifications Project stage: Acceptance Review ML0919500722009-07-24024 July 2009 Request for Additional Information (RAI) from the Containment and Ventilation Branch Regarding License Amendment Request No. 241 Alternate Source Term Project stage: RAI ML0919700422009-07-24024 July 2009 Notice of Meeting with FPL Energy Point Beach, LLC, to Discuss Epu/Setpoint Submittal and Relationship Between EPU and AST Project stage: Meeting NRC 2009-0075, License Amendment Request 241 Alternative Source Term Response to Request for Additional Information2009-07-24024 July 2009 License Amendment Request 241 Alternative Source Term Response to Request for Additional Information Project stage: Response to RAI ML0921905632009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation Project stage: Request ML0922402982009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2) Project stage: Request ML0921500922009-08-0707 August 2009 Request for Additional Information (RAI) from Electrical Engineering Branch Alternate Source Term Project stage: RAI ML0921511232009-08-13013 August 2009 Request for Additional Information from Accident Dose Branch Alternate Source Term Project stage: RAI ML0922507682009-08-13013 August 2009 Draft - Request for Additional Information from Containment and Ventilation Branch on Alternate Source Term Project stage: Draft RAI NRC 2009-0080, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-08-20020 August 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI ML0922500082009-08-25025 August 2009 Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review ML0923605352009-08-26026 August 2009 Request for Additional Information, Round 2, from Containment and Ventilation Branch, on the Proposed Amendment Re. Alternative Source Term Project stage: RAI ML0923104542009-08-26026 August 2009 Request for Additional Information from Electrical Engineering Branch Regarding Auxiliary Feedwater Project stage: RAI ML0924305172009-08-31031 August 2009 Notice of Meeting on AFW Modifications, Questions to Be Discussed Project stage: Meeting NRC 2009-0086, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-09-0404 September 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0085, License Amendment Request 241 Alternative Source Term Response to Request for Additional Information2009-09-0404 September 2009 License Amendment Request 241 Alternative Source Term Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0090, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-09-10010 September 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0076, Units I & 2, License Amendment Request 241, Alternative Source Term Commitment for Seismic Evaluation2009-09-10010 September 2009 Units I & 2, License Amendment Request 241, Alternative Source Term Commitment for Seismic Evaluation Project stage: Request L-2009-207, Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan2009-09-11011 September 2009 Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan Project stage: Request NRC 2009-0094, License Amendment Request 261 Extended Power Uprate Expedited Review Request2009-09-11011 September 2009 License Amendment Request 261 Extended Power Uprate Expedited Review Request Project stage: Request ML0923211842009-09-14014 September 2009 Meeting Summary, Meeting with FPL Energy Point Beach, LLC, on the Extended Power Uprate and Alternate Source Term Amendments Project stage: Meeting NRC 2009-0098, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-09-25025 September 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0105, License Amendment Request 241, Alternative Source Term, Response Clarification Request2009-10-0202 October 2009 License Amendment Request 241, Alternative Source Term, Response Clarification Request Project stage: Request 2009-05-08
[Table View] |
Text
From:
Beltz, Terry Sent:
Thursday, August 19, 2010 7:00 AM To:
'Hale, Steve' Cc:
'liz.abbott@fpl.com'; 'Costedio, Jim'; 'Flentje, Fritzie'
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Followup to August 16, 2010, Phone Call re: WGDT Release
Dear Mr. Hale:
During a phone call between NextEra Energy Point Beach and NRC technical staff in the Health Physics & Human Performance Branch, you requested that the NRC determine the acceptability of evaluating the consequences of a WGDT release based on the assumed percent failed fuel that would be comparable to the Technical Specification for reactor coolant activity (.5 uCi/gm DEI, equivalent to approximately 0.133% failed fuel). You noted that this had been an acceptable approach for other Chapter 15 Design Basis Accidents.
Further discussion with the NRC staff in the Accident Dose Branch verified that this approach is acceptable and is a consistent staff position which was used during the review of the AST license amendment request. Therefore, the staff has determined this would be an acceptable assumption for the WGDT analysis.
Please let me know if you have any questions.
Sincerely, Terry Beltz, Senior Project Manager NRR/ADRODORL/LPL3-1 (301) 415-3049 E-mail Properties Mail Envelope Properties (87B1F1BDFE5A554CA9DC5EAA75EB6D0D23116C066D)
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Followup to August 16, 2010, Phone Call re: WGDT Release Sent Date: 8/19/2010 6:59:58 AM Received Date: 8/19/2010 6:59:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:
Steve.Hale@nexteraenergy.com ('Hale, Steve')
Tracking Status: None liz.abbott@fpl.com ('liz.abbott@fpl.com')
Tracking Status: None james.costedio@nexteraenergy.com ('Costedio, Jim')
Tracking Status: None fritzie.flentje@nexteraenergy.com ('Flentje, Fritzie')
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 10803 8/19/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: