Letter Sequence Supplement |
|---|
TAC:ME1081, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEAR05000255/LER-2008-007-01, Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints2009-01-21021 January 2009 Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints Project stage: Request NRC 2009-0030, License Amendment Request 261, Extended Power Uprate2009-04-0707 April 2009 License Amendment Request 261, Extended Power Uprate Project stage: Request ML0912505692009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices Project stage: Request ML0910006472009-04-0808 April 2009 Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study Project stage: Request NRC 2009-0058, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-06-0101 June 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI NRC 2009-0066, License Amendment Request 261 Supplement 1 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 1 Extended Power Uprate Project stage: Supplement NRC 2009-0068, License Amendment Request 261 Supplement 2 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 2 Extended Power Uprate Project stage: Supplement ML0917603382009-06-29029 June 2009 Deferral of the Extended Power Uprate Acceptance Review and Acceptance Review of the Auxiliary Feedwater Modifications and Non Conservative Setpoint Technical Specifications Project stage: Acceptance Review ML0921905632009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation Project stage: Request ML0922402982009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2) Project stage: Request ML0922500082009-08-25025 August 2009 Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review ML0923104542009-08-26026 August 2009 Request for Additional Information from Electrical Engineering Branch Regarding Auxiliary Feedwater Project stage: RAI ML0924305172009-08-31031 August 2009 Notice of Meeting on AFW Modifications, Questions to Be Discussed Project stage: Meeting L-2009-207, Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan2009-09-11011 September 2009 Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan Project stage: Request NRC 2009-0094, License Amendment Request 261 Extended Power Uprate Expedited Review Request2009-09-11011 September 2009 License Amendment Request 261 Extended Power Uprate Expedited Review Request Project stage: Request ML0923211842009-09-14014 September 2009 Meeting Summary, Meeting with FPL Energy Point Beach, LLC, on the Extended Power Uprate and Alternate Source Term Amendments Project stage: Meeting NRC 2009-0098, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-09-25025 September 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0108, License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions2009-10-0909 October 2009 License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions Project stage: Request ML0928005432009-10-19019 October 2009 Nonacceptance with the Opportunity to Supplement Letter for Extended Power Uprate Project stage: Other ML0929305162009-10-22022 October 2009 Request for Additional Information from Mechanical and Civil Engineering Branch Auxiliary Feedwater Modification Project stage: RAI ML0929308342009-10-22022 October 2009 Request for Additional Information from Balance of Plant Branch Auxiliary Feedwater Modification Project stage: RAI ML0929201272009-10-28028 October 2009 Summary of Meeting with FPL Energy Point Beach, LLC on the Auxiliary Feedwater Modification Amendment Project stage: Meeting ML0930205422009-11-0404 November 2009 Acceptance Review of Requested Licensing Action Regarding Extended Power Uprate Project stage: Acceptance Review ML0930603312009-11-0505 November 2009 Request for Additional Information from Technical Specification Branch Non-conservative Setpoint Changes (TAC Nos. ME1083 & ME1084) Project stage: RAI ML0930603012009-11-0606 November 2009 Request for Additional Information from Technical Specifications Branch Regarding Auxiliary Feedwater Project stage: RAI NRC 2009-0114, Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study2009-11-13013 November 2009 Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study Project stage: Request ML0931402312009-11-16016 November 2009 Request for Additional Information from Balance of Plant Branch Regarding Main Feedwater Isolation Valves Project stage: RAI NRC 2009-0125, License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System2009-11-20020 November 2009 License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System Project stage: Response to RAI NRC 2009-0123, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint2009-11-20020 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint Project stage: Response to RAI NRC 2009-0116, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0115, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0932400282009-11-24024 November 2009 Request for Additional Information from Reactor Systems Branch Regarding Extended Power Uprate Project stage: RAI NRC 2009-0124, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2009-11-30030 November 2009 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0120, License Amendment Request 261, Supplement 3 Extended Power Uprate2009-12-0808 December 2009 License Amendment Request 261, Supplement 3 Extended Power Uprate Project stage: Supplement NRC 2009-0122, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-16016 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0128, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-21021 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0935002032009-12-22022 December 2009 Request for Additional Information from Reactor Systems Branch EPU Expedited Portions Project stage: RAI NRC 2010-0003, License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information2010-01-0808 January 2010 License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information Project stage: Request ML1000800812010-01-13013 January 2010 Request for Additional Information from Balance of Plant Branch Extended Power Uprate Project stage: RAI NRC 2010-0005, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2010-01-13013 January 2010 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI ML1002500112010-01-22022 January 2010 Response Request for Additional Information License Amendment Request 261 Extended Power Uprate Project stage: Request NRC 2010-0013, License Amendment Request 264 - Diesel Fuel Oil Storage Requirements2010-01-27027 January 2010 License Amendment Request 264 - Diesel Fuel Oil Storage Requirements Project stage: Request ML1001203312010-02-0101 February 2010 Request for Additional Information from Electrical Engineering Branch Auxiliary Feedwater - Round 2 Project stage: RAI NRC 2010-0022, License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-02-25025 February 2010 License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Request NRC 2010-0012, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation2010-03-0303 March 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation Project stage: Request ML1006803682010-03-10010 March 2010 Notice of Meeting with FPL Energy Point Beach, LLC, to Discuss the Alternative Source Term, Auxiliary Feedwater, and Extended Power Uprate Amendments Project stage: Meeting ML1007806102010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007506852010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1008103682010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007804772010-03-31031 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI 2009-04-08
[Table View] |
Text
November 01,201 0 NRC 201 0-01 68 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 License Amendment Request 261, Supplement 11 Extended Power Uprate
References:
(1)
FPL Energy Point Beach, LLC letter to NRC, dated April 7, 2009, License Amendment Request 261, Extended Power Uprate (ML091250564)
(2)
NextEra Energy Point Beach, LLC letter to NRC, dated September 9,20'l0, License Amendment Request 261, Supplement 8, Extended Power Uprate (MLI 02520327)
(3),
NextEra Energy Point Beach, LLC letter to NRC, dated July 8, 2010, License Amendment Request 261, Supplement 5, Extended Power Uprate (MLI 01 890'785)
In Reference I, NextEra Energy Point Beach, LLC (NextEra) submitted a License Amendment Request (LAR) for Point Beach Nuclear Plant (PBNP) Units I and 2. The proposed amendment would increase each unit's licensed core power level to 1800 megawatts thermal and revise Technical Specifications (TS) to support this power level. In Reference 2, NextEra submitted two proposed Appendix C license conditions for modifications that will be installed prior to operation of either unit at extended power uprate (EPU) conditions.
In a teleconference on October 15, 201 0, the NRC requested that NextEra provide additional proposed license conditions that support the AFW portion of LAR 261. They address power sources for AFW pump systems and emergency diesel loading. Enclosure 1 provides new proposed license conditions that address the NRC's request. The marked-up Appendix C license condition pages also include the Appendix C license conditions submitted in Reference 2.
NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
Document Control Desk Page 2 In Reference 3, NextEra provided revised proposed TS pages for the AFW system, along with a revised no significant hazards consideration (NSHC) evaluation. The NSHC evaluations provided in Reference 1 and Reference 3 are not altered by the additional license conditions.
The proposed changes continue to satisfy the criteria of 10 CFR 51.22 for categorical exclusion from the requirements for an environmental assessment.
This letter contains no new regulatory commitments.
The proposed license conditions have been reviewed by the Plant Operations Review Committee.
In accordance with 10 CFR 50.91, a copy of this letter is being provided to the designated Wisconsin Official.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on November Ol,2010.
Very truly yours, NextEra Energy Point Beach, LLC Enclosure cc:
Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW
ENCLOSURE 1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS I AND 2 LICENSE AMENDMENT REQUEST 261, SUPPLEMENT 14 EXTENDED POVVER UPRATE PROPOSED APPENDIX C LICENSE CONDITIONS 2 pages follow
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-24 NextEra Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:
Amendment Number Additional Conditions Implementation Date -
228 At the time of the closing of the transfer of the licenses from Wisconsin Electric Immediately Power Company (WEPCO) to FPLE Point ~each', WEPCO shall transfer to FPLE Point ~each' WEPCO's decommissioning funds in an aggregate minimum value of $200.8 million for Point Beach Unit 1. FPLE Point ~each*
shall deposit such fungs in an external decommissioning trust fund established by FPLE Point Beach for Point Beach Units 1 and 2. The trust agreement shall be in a form acceptable to the NRC.
NextEra Energy Point Beach shall take no actions to cause FPL Group Immediately Capital, or its successors and assigns, to void, cancel, or modify its $70 million Support Agreement (Agreement) to NextEra Energy Point Beach, as presented in its application dated January 26, 2007, or cause it to fail to perform or impair its performance under the Agreement, without the prior written consent from the NRC. The Agreement may not be amended or modified without 30 days prior written notice to the Director of Nuclear Reactor Regulation or his designee. An executed copy of the Agreement shall be submitted to the NRC no later than 30 days after the completion of the license transfers. Also, NextEra Energy Point Beach shall inform the NRC in writing anytime it draws upon the $70 million Agreement.
XXX NextEra Enerav Point Beach. LLC shall eliminate the reliance on local manual Prior to action to aaa the Motor-Driven and Turbine-Driven AFW pump Operation of mini-recirculation valves onen.
Either Unit at EPU Conditions NextEra Enerav Point Beach. LLC shall install a self-cooled (i.e.. air-cooled) air Prior to comnressor capable of supnlvina Instrument Air. The compressor shall be Operation of indenendent of Service Water coolina and normallv aligned for automatic Either Unit at oneration.
EPU Conditions Prior to End Of XXX - NextEra Enerav Point Beach. LLC shall modify the motor-driven auxiliary Spring 201 1 feedwater and the turbine-driven auxiliary feedwater pump svstems to ensure Unit 2 Refueling thev are powered from indenendent DC power sources.
Outaae NextEra Enerav Point Beach. LLC shall imnlement modifications to reduce Prior to End Of emeraencv diesel generator (EDG) loadina such that the maximum loadina will Snring 201 1 not exceed the 2000-hour ratina of the EDGs.
Unit 2 Refuelinq Outaae On April 16,2009, the name "FPLE Point Beach, LLC was changed to "NextEra Energy Point Beach, LLC."
Point Beach Unit 1 C-2 Amendment No. 237
APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-27 NextEra Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:
Amendment Number Additional Conditions Implementation Date -
233 At the time of the closing of the transfer of the licenses from Wisconsin Electric Immediately Power Company (WEPCO) to FPLE Point ~each', WEPCO shall transfer to FPLE Point Beach* WEPCO's decommissioning funds in an aggregate minimum value of $189.2 million for Point Beach Unit 2. FPLE Point ~each*
shall deposit such fungs in an external decommissioning trust fund established by FPLE Point Beach for Point Beach Units 1 and 2. The trust agreement shall be in a form acceptable to the NRC.
NextEra Energy Point Beach shall take no actions to cause FPL Group Immediately Capital, or its successors and assigns, to void, cancel, or modify its $70 million Support Agreement (Agreement) to NextEra Energy Point Beach, as presented in its application dated January 26, 2007, or cause it to fail to perform or impair its performance under the Agreement, without the prior written consent from the NRC. The Agreement may not be amended or modified without 30 days prior written notice to the Director of Nuclear Reactor Regulation or his designee. An executed copy of the Agreement shall be submitted to the NRC no later than 30 days after the completion of the license transfers. Also, NextEra Energy Point Beach shall inform the NRC in writing anytime it draws upon the $70 million Agreement.
NextEra Enerav Point Beach. LLC shall eliminate the reliance on local manual Prior to action to aag the Motor-Driven and Turbine-Driven AFW pump Operation of mini-recirculation valves open.
Either Unit at EPU Conditions NextEra Enerav Point Beach. LLC shall install a self-cooled (i.e.. air-cooled) air Prior to compressor capable of supplvina Instrument Air. The compressor shall be Operation of independent of Service Water coolina and normallv alianed for automatic Either Unit at operation.
EPU Conditions Prior to End Of NextEra Enerav Point Beach, LLC shall modifv the motor driven auxiliaqi Sprina 201 1 Unit feedwater and the turbine driven auxiliary feedwater pump svstems to ensure 2 Refueling thev are powered from independent DC power sources.
Outaae NextEra Enerav Point Beach. LLC shall implement modifications to reduce Prior to End Of emeraencv diesel generator (EDG) loadina such that the maximum loadina will Spring 201 1 Unit not exceed the 2000-hour ratina of the EDGs.
2 Refueling Outage
' On April 16,2009, the name "FPLE Point Beach, LLC was changed to "NextEra Energy Point Beach, LLC."
Point Beach Unit 2 C-2 Amendment No. 244