November 01,201 0 NRC 201 0-01 68 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 License Amendment Request 261, Supplement 11 Extended Power Uprate

References:

(1)

FPL Energy Point Beach, LLC letter to NRC, dated April 7, 2009, License Amendment Request 261, Extended Power Uprate (ML091250564)

(2)

NextEra Energy Point Beach, LLC letter to NRC, dated September 9,20'l0, License Amendment Request 261, Supplement 8, Extended Power Uprate (MLI 02520327)

(3),

NextEra Energy Point Beach, LLC letter to NRC, dated July 8, 2010, License Amendment Request 261, Supplement 5, Extended Power Uprate (MLI 01 890'785)

In Reference I, NextEra Energy Point Beach, LLC (NextEra) submitted a License Amendment Request (LAR) for Point Beach Nuclear Plant (PBNP) Units I and 2. The proposed amendment would increase each unit's licensed core power level to 1800 megawatts thermal and revise Technical Specifications (TS) to support this power level. In Reference 2, NextEra submitted two proposed Appendix C license conditions for modifications that will be installed prior to operation of either unit at extended power uprate (EPU) conditions.

In a teleconference on October 15, 201 0, the NRC requested that NextEra provide additional proposed license conditions that support the AFW portion of LAR 261. They address power sources for AFW pump systems and emergency diesel loading. Enclosure 1 provides new proposed license conditions that address the NRC's request. The marked-up Appendix C license condition pages also include the Appendix C license conditions submitted in Reference 2.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 In Reference 3, NextEra provided revised proposed TS pages for the AFW system, along with a revised no significant hazards consideration (NSHC) evaluation. The NSHC evaluations provided in Reference 1 and Reference 3 are not altered by the additional license conditions.

The proposed changes continue to satisfy the criteria of 10 CFR 51.22 for categorical exclusion from the requirements for an environmental assessment.

This letter contains no new regulatory commitments.

The proposed license conditions have been reviewed by the Plant Operations Review Committee.

In accordance with 10 CFR 50.91, a copy of this letter is being provided to the designated Wisconsin Official.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on November Ol,2010.

Very truly yours, NextEra Energy Point Beach, LLC Enclosure cc:

Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW

ENCLOSURE 1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS I AND 2 LICENSE AMENDMENT REQUEST 261, SUPPLEMENT 14 EXTENDED POVVER UPRATE PROPOSED APPENDIX C LICENSE CONDITIONS 2 pages follow

APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-24 NextEra Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:

Amendment Number Additional Conditions Implementation Date -

228 At the time of the closing of the transfer of the licenses from Wisconsin Electric Immediately Power Company (WEPCO) to FPLE Point ~each', WEPCO shall transfer to FPLE Point ~each' WEPCO's decommissioning funds in an aggregate minimum value of $200.8 million for Point Beach Unit 1. FPLE Point ~each*

shall deposit such fungs in an external decommissioning trust fund established by FPLE Point Beach for Point Beach Units 1 and 2. The trust agreement shall be in a form acceptable to the NRC.

NextEra Energy Point Beach shall take no actions to cause FPL Group Immediately Capital, or its successors and assigns, to void, cancel, or modify its $70 million Support Agreement (Agreement) to NextEra Energy Point Beach, as presented in its application dated January 26, 2007, or cause it to fail to perform or impair its performance under the Agreement, without the prior written consent from the NRC. The Agreement may not be amended or modified without 30 days prior written notice to the Director of Nuclear Reactor Regulation or his designee. An executed copy of the Agreement shall be submitted to the NRC no later than 30 days after the completion of the license transfers. Also, NextEra Energy Point Beach shall inform the NRC in writing anytime it draws upon the $70 million Agreement.

XXX NextEra Enerav Point Beach. LLC shall eliminate the reliance on local manual Prior to action to aaa the Motor-Driven and Turbine-Driven AFW pump Operation of mini-recirculation valves onen.

Either Unit at EPU Conditions NextEra Enerav Point Beach. LLC shall install a self-cooled (i.e.. air-cooled) air Prior to comnressor capable of supnlvina Instrument Air. The compressor shall be Operation of indenendent of Service Water coolina and normallv aligned for automatic Either Unit at oneration.

EPU Conditions Prior to End Of XXX - NextEra Enerav Point Beach. LLC shall modify the motor-driven auxiliary Spring 201 1 feedwater and the turbine-driven auxiliary feedwater pump svstems to ensure Unit 2 Refueling thev are powered from indenendent DC power sources.

Outaae NextEra Enerav Point Beach. LLC shall imnlement modifications to reduce Prior to End Of emeraencv diesel generator (EDG) loadina such that the maximum loadina will Snring 201 1 not exceed the 2000-hour ratina of the EDGs.

Unit 2 Refuelinq Outaae On April 16,2009, the name "FPLE Point Beach, LLC was changed to "NextEra Energy Point Beach, LLC."

Point Beach Unit 1 C-2 Amendment No. 237

APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-27 NextEra Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:

Amendment Number Additional Conditions Implementation Date -

233 At the time of the closing of the transfer of the licenses from Wisconsin Electric Immediately Power Company (WEPCO) to FPLE Point ~each', WEPCO shall transfer to FPLE Point Beach* WEPCO's decommissioning funds in an aggregate minimum value of $189.2 million for Point Beach Unit 2. FPLE Point ~each*

shall deposit such fungs in an external decommissioning trust fund established by FPLE Point Beach for Point Beach Units 1 and 2. The trust agreement shall be in a form acceptable to the NRC.

NextEra Energy Point Beach shall take no actions to cause FPL Group Immediately Capital, or its successors and assigns, to void, cancel, or modify its $70 million Support Agreement (Agreement) to NextEra Energy Point Beach, as presented in its application dated January 26, 2007, or cause it to fail to perform or impair its performance under the Agreement, without the prior written consent from the NRC. The Agreement may not be amended or modified without 30 days prior written notice to the Director of Nuclear Reactor Regulation or his designee. An executed copy of the Agreement shall be submitted to the NRC no later than 30 days after the completion of the license transfers. Also, NextEra Energy Point Beach shall inform the NRC in writing anytime it draws upon the $70 million Agreement.

NextEra Enerav Point Beach. LLC shall eliminate the reliance on local manual Prior to action to aag the Motor-Driven and Turbine-Driven AFW pump Operation of mini-recirculation valves open.

Either Unit at EPU Conditions NextEra Enerav Point Beach. LLC shall install a self-cooled (i.e.. air-cooled) air Prior to compressor capable of supplvina Instrument Air. The compressor shall be Operation of independent of Service Water coolina and normallv alianed for automatic Either Unit at operation.

EPU Conditions Prior to End Of NextEra Enerav Point Beach, LLC shall modifv the motor driven auxiliaqi Sprina 201 1 Unit feedwater and the turbine driven auxiliary feedwater pump svstems to ensure 2 Refueling thev are powered from independent DC power sources.

Outaae NextEra Enerav Point Beach. LLC shall implement modifications to reduce Prior to End Of emeraencv diesel generator (EDG) loadina such that the maximum loadina will Spring 201 1 Unit not exceed the 2000-hour ratina of the EDGs.

2 Refueling Outage

' On April 16,2009, the name "FPLE Point Beach, LLC was changed to "NextEra Energy Point Beach, LLC."