NRC 2010-0133, License Amendment Request 261, Extended Power Uprate, Regulatory Commitment Change

From kanterella
Jump to navigation Jump to search

License Amendment Request 261, Extended Power Uprate, Regulatory Commitment Change
ML102240444
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/12/2010
From: Meyer L
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2010-0133, TAC ME1044, TAC ME1045
Download: ML102240444 (2)


Text

August 12,2010 NRC 2010-0133 10 CFR 50.90 U.S. Nuclear Regulatory Commission AlTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 License Amendment Request 261 Extended Power Uprate Reaulaton, Commitment Chanae

References:

(1) FPL Energy Point Beach, LLC letter to NRC, dated April 7,2009, License Amendment Request 261, Extended Power Uprate (ML091250564)

(2) NextEra Energy Point Beach letter to the NRC, dated June 10,2010, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional lnformation (MLI01610711)

(3) NRC letter to NextEra Energy Point Beach, LLC, dated April 23,2010, Point Beach Nuclear Plant, Unit 1 and 2 - Request for Additional lnformation from Electrical Engineering Branch Re: Extended Power Uprate (TAC NOS. ME1044 and ME1045) (MLI 01100761)

NextEra Energy Point Beach, LLC (NextEra) submitted License Amendment Request (LAR) 261 (Reference 1) to the NRC pursuant to 10 CFR 50.90. The proposed license amendment would increase each unit's licensed thermal power level from 1540 megawatts thermal (MWt) to 1800 MWt, and revise the Technical Specifications to support operation at the increased thermal power level.

Via Reference (2), NextEra made a Regulatory Commitment to provide responses to remaining RAls (i.e., 16 through 24,28,30,31, and 34) contained in Reference (3) by August 13,2010.

NextEra has determined that additional time is needed to complete analyses associated with the response. Therefore, the commitment date is changed to September 17,2010.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 Summarv of Reaulatorv Commitments The Regulatory Commitment contained in Reference (2) states:

The NextEra response to remaining RAl's (i.e., 16 through 24,28, 30, 31, and 34) contained in an NRC letter to NextEra Energy dated April 23,2010 (MLI01100761) will be provided by August 13,2010.

NextEra is modifying this Regulatory Commitment to state:

The NextEra response to remaining RAl's (i.e., 16 through 24,28, 30, 31, and 34) contained in an NRC letter to NextEra Energy dated April 23,2010 (ML101100761) will be provided by September 17,2010.

Very truly yours, NextEra Energy Point Beach, LLC

/%A<

Larry Meyer Site Vice President cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC