Letter Sequence Request |
|---|
TAC:ME1081, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEAR05000255/LER-2008-007-01, Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints2009-01-21021 January 2009 Potential Loss of a Safety Function Due to Non-Conservative Auxiliary Feedwater Trip Setpoints Project stage: Request NRC 2009-0030, License Amendment Request 261, Extended Power Uprate2009-04-0707 April 2009 License Amendment Request 261, Extended Power Uprate Project stage: Request ML0912505692009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices Project stage: Request ML0910006472009-04-0808 April 2009 Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study Project stage: Request NRC 2009-0058, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-06-0101 June 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI NRC 2009-0066, License Amendment Request 261 Supplement 1 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 1 Extended Power Uprate Project stage: Supplement NRC 2009-0068, License Amendment Request 261 Supplement 2 Extended Power Uprate2009-06-17017 June 2009 License Amendment Request 261 Supplement 2 Extended Power Uprate Project stage: Supplement ML0917603382009-06-29029 June 2009 Deferral of the Extended Power Uprate Acceptance Review and Acceptance Review of the Auxiliary Feedwater Modifications and Non Conservative Setpoint Technical Specifications Project stage: Acceptance Review ML0921905632009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation Project stage: Request ML0922402982009-08-0606 August 2009 Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2) Project stage: Request ML0922500082009-08-25025 August 2009 Extended Power Uprate (EPU) Acceptance Review Project stage: Acceptance Review ML0923104542009-08-26026 August 2009 Request for Additional Information from Electrical Engineering Branch Regarding Auxiliary Feedwater Project stage: RAI ML0924305172009-08-31031 August 2009 Notice of Meeting on AFW Modifications, Questions to Be Discussed Project stage: Meeting L-2009-207, Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan2009-09-11011 September 2009 Units 1 & 2, Update to Decommissioning Funding Status and Financial Assurance Plan Project stage: Request NRC 2009-0094, License Amendment Request 261 Extended Power Uprate Expedited Review Request2009-09-11011 September 2009 License Amendment Request 261 Extended Power Uprate Expedited Review Request Project stage: Request ML0923211842009-09-14014 September 2009 Meeting Summary, Meeting with FPL Energy Point Beach, LLC, on the Extended Power Uprate and Alternate Source Term Amendments Project stage: Meeting NRC 2009-0098, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-09-25025 September 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0108, License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions2009-10-0909 October 2009 License Amendment Request 261, Extended Power Uprate Response to Acceptance Review Questions Project stage: Request ML0928005432009-10-19019 October 2009 Nonacceptance with the Opportunity to Supplement Letter for Extended Power Uprate Project stage: Other ML0929305162009-10-22022 October 2009 Request for Additional Information from Mechanical and Civil Engineering Branch Auxiliary Feedwater Modification Project stage: RAI ML0929308342009-10-22022 October 2009 Request for Additional Information from Balance of Plant Branch Auxiliary Feedwater Modification Project stage: RAI ML0929201272009-10-28028 October 2009 Summary of Meeting with FPL Energy Point Beach, LLC on the Auxiliary Feedwater Modification Amendment Project stage: Meeting ML0930205422009-11-0404 November 2009 Acceptance Review of Requested Licensing Action Regarding Extended Power Uprate Project stage: Acceptance Review ML0930603312009-11-0505 November 2009 Request for Additional Information from Technical Specification Branch Non-conservative Setpoint Changes (TAC Nos. ME1083 & ME1084) Project stage: RAI ML0930603012009-11-0606 November 2009 Request for Additional Information from Technical Specifications Branch Regarding Auxiliary Feedwater Project stage: RAI NRC 2009-0114, Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study2009-11-13013 November 2009 Transmittal of Background Information to Support License Amendment Request 261 Final Interconnection System Impact Study Project stage: Request ML0931402312009-11-16016 November 2009 Request for Additional Information from Balance of Plant Branch Regarding Main Feedwater Isolation Valves Project stage: RAI NRC 2009-0125, License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System2009-11-20020 November 2009 License Amendment Request 261 Re Extended Power Uprate, Response to Request for Additional Information on Auxiliary Feedwater System Project stage: Response to RAI NRC 2009-0123, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint2009-11-20020 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information for Calculation of the Auxiliary Feedwater Pump Low Suction Pressure Setpoint Project stage: Response to RAI NRC 2009-0116, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0115, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-11-21021 November 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0932400282009-11-24024 November 2009 Request for Additional Information from Reactor Systems Branch Regarding Extended Power Uprate Project stage: RAI NRC 2009-0124, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2009-11-30030 November 2009 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0120, License Amendment Request 261, Supplement 3 Extended Power Uprate2009-12-0808 December 2009 License Amendment Request 261, Supplement 3 Extended Power Uprate Project stage: Supplement NRC 2009-0122, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-16016 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI NRC 2009-0128, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information2009-12-21021 December 2009 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information Project stage: Response to RAI ML0935002032009-12-22022 December 2009 Request for Additional Information from Reactor Systems Branch EPU Expedited Portions Project stage: RAI NRC 2010-0003, License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information2010-01-0808 January 2010 License Amendment Request 261, Extended Power Uprate Auxiliary Feedwater System Pipe Stress Analysis Information Project stage: Request ML1000800812010-01-13013 January 2010 Request for Additional Information from Balance of Plant Branch Extended Power Uprate Project stage: RAI NRC 2010-0005, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2010-01-13013 January 2010 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information Project stage: Response to RAI ML1002500112010-01-22022 January 2010 Response Request for Additional Information License Amendment Request 261 Extended Power Uprate Project stage: Request NRC 2010-0013, License Amendment Request 264 - Diesel Fuel Oil Storage Requirements2010-01-27027 January 2010 License Amendment Request 264 - Diesel Fuel Oil Storage Requirements Project stage: Request ML1001203312010-02-0101 February 2010 Request for Additional Information from Electrical Engineering Branch Auxiliary Feedwater - Round 2 Project stage: RAI NRC 2010-0022, License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate2010-02-25025 February 2010 License Amendment Request 261, Extended Power Uprate & Transmittal of Proposed Technical Specifications for Reactor Protection System & Engineered Safety Features Setpoints Not Associated with Extended Power Uprate Project stage: Request NRC 2010-0012, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation2010-03-0303 March 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation Project stage: Request ML1006803682010-03-10010 March 2010 Notice of Meeting with FPL Energy Point Beach, LLC, to Discuss the Alternative Source Term, Auxiliary Feedwater, and Extended Power Uprate Amendments Project stage: Meeting ML1007806102010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007506852010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1008103682010-03-25025 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI ML1007804772010-03-31031 March 2010 Request for Additional Information, Extended Power Uprate Project stage: RAI 2009-04-08
[Table View] |
Text
Mendiola, Doris
Subject:
FW: NRC TESTIMONY RE Point Beach WI Reactors From: Susan M [1]
Sent: Saturday, January 08, 2011 2:04 PM To: Beltz, Terry Cc: Diane-WNPJ Carbon Free
Subject:
Re: NRC TESTIMONY RE Point Beach WI Reactors
--- On Thu, 1/6/11, Susan M <stardustlOOOO@yahoo.com> wrote:
Addendum Re: Point Beach from Susan Michetti 1_4721eaV2 /
T1 0
C-..,
73 C-1 I ask that the comment period for Point Beach WI reactor power uppage be extended due to process flaws involving the Federal Register. The Federal Register link "Submit a formal comment" does not work. Clicking on it brings up "404 not found. The page you were looking for doesn't exist." Clicking on an index page to attempt to rapidly find pertinent facts also results in the same information with the "404' reference and page not not existing. This is unacceptable when involving a process with a deadline of today, which the register link does identify correctly. It also says that anything not filed today may not be read, depending on time.
This is citizen comment unfriendly.
When I talked to Terry Beltz on the phone, he asked questions that conveyed the impression that he was unaware that the comment link was not working. Who was responsible to check that those links worked for comments? Who is not doing their job properly? When there is only one comment link and it does not work, it is unacceptable. It is outrageous that NRC has not identified an email link to send comments, but it did not. This has created a flawed process that has suppressed comments from reaching the NRC. This is unacceptable. This is not democracy in action, but the appearance of it with obstacles that are unsurmountable for most, except a few very well experienced commenters who understand how to navigate this obstacle course that devours enormous time in an unacceptable way.
Terry Beltz informed me that a few others were able to find a way to email to him, but the federal register does not state that the official comments can be mailed to him, but rather that he is a source for problems. Most people are volunteers without time to problem-solve this obstacle course that the NRC has created for citizens trying to file formal comments.
There is no identified email link in the federal register itself, and this is unacceptable process with a broken link for filing formal comments. I have wasted more than 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> over my personal lack of a fax machine and over no identifiable email address to send formal comments. Snail mail usually takes 3 weeks, based on the information from Rep. Tammy Baldwin due to interference by Homeland Security to make sure that officials aren't terrorist targets. Under the circumstances, the NRC process is flawed in a way that is unacceptable and outrageous due to this failure to include an email address in the federal register itself for filing comments. This flaw prevents a workable system for formal comments. Therefore, this warrants that the Point Beach comment period be extended and republished in the Federal Register with comment' friendly links and fully disclosed contact information.
An investigation into the process errors is warranted to ensure that these do not happen again.
I have been told by others that they have given up due to the systemic flaws in the process that prevent comments from reaching their destination without excess wasted time in exploring how to get them there.
The argument that a few, probably very experienced filers, made it through the comment email process to Terry Beltz or whatever does not warrant any dismissal of my complaint of this process as comment unfriendly. It is obvious that the process itself has a serious flaw that should be reviewed by authorities higher than the NRC if this-comment period is not extended and if these comment obstacles are not cleared up in the future.
Point Beach has 2 of 4 Red Findings issued in the history of the NRC--the most serious failure notice. A $325,000 fine was issued by NRC for 16 safety violations, including potentially catastrophic May 1996 hydrogen gas explosion inside a loaded radioactive waste cask. The NRC said Point Beach operators were "inattentive to their duties" and that they were "starting up a power unit while one of its safety systems was inoperable." They failed to install the "required number of
cooling pumps." This was almost a Chernobyl or a Three Mile Island, and this does not warrant upping the power.
Point Beach has contaminated Lake Michigan surface water and groundwater with radioactive releases. This does not warrant upping any power and upping these releases that endanger human health. In 1975, Point Beach Unit 1 leaked about 10,000 gallons-of radioactive water into a retention pond that made it to ground water--unacceptable to human health. In 1997, 10,000 gallons ran from Unit 1 eventually into Lake Michigan--unacceptable to human and aquatic life.
in 1997, Unit 2 leaked discharge from a pipe and contaminated stream and Lake Michigan--unacceptable to human and wildlife. In 2005, a Point Beach worker was convicted in federal court of knowingly making false written statements to the NRC. This last conviction identifies a culture of falsification where a worker felt that the corporate interests were more important than public health and honesty.
This warrants a rejection of this proposal to up the power in this dilapidated nuclear reactor with a history of leaking pipes, operator negligence, operator errors resulting in human health hazards and a near major catastrophe, combined with this history involving lying to the NRC about safety issues.
The NRC admits and the EPA admits that any radioactive exposure is dangerous to human health. Tritium stays in the ecosystem for 120 years, when the half-life is calculated corrected. Point Beach almost had near meltdown with that hydrogen bubble, and it was not instrumental malfunctions but serious operator negligence and disregard of safety rules.
This creates legitimate stigma surrounding Point Beach which warrants rejection of their proposal to up the power and create more safety problems in a dilapitated reactor.
2