Request for Additional Information from Balance of Plant Branch Extended Power Uprate
ML100080081
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/13/2010
From: Justin Poole
Plant Licensing Branch III
To: Meyer L
Point Beach
Poole Justin/DORL/LPL3-1/ 301-415-2048
References
TAC ME1044, TAC ME1045
Download: ML100080081 (4)


Text

~p.R REGU(

UNITED STATES

.;;,,),,;

'1)

~

0'1' NUCLEAR REGULATORY COMMISSION

,fJ

.L

('l WASHINGTON, D.C. 20555-0001 C(

0

~

rJl

~

~

~

January 13, 2010

~

~

1-1)

...0

    • tvIr:Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION FROM BALANCE OF PLANT BRANCH RE:

EXTENDED POWER UPRATE (TAC NOS. ME1044 AND ME1045)

Dear Mr. Meyer:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated April 7, 2009, as supplemented by letters dated September 11 and October 9, 2009 (Agencywide Documents Access and Management System Accession Nos. ML091250564, ML092570205, and ML092860098), FPL Energy Point Beach, LLC, submitted a request to increase each unit's licensed core power level from 1540 megawatts thermal (MWt) to 1800 MWt reactor core power, and revise the technical specifications to support operation at this increased core thermal power level.

The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on December 30, 2009, it was agreed that you would provide the additional information within 30 days of the date of this letter.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2048. 02__

~{pOOle, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of l'Juclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

Request for Additional Information cc w/encl: Distribution via ListServ

REQUEST FOR ADDITIONAL INFORMATION POINT BEACH NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-266 AND 50-301 RAI1 BACKGROUND:

Section 2.5.1.3.2 of the Extended Power Uprate (EPU) Licensing Report states: "The HELB was reconstituted to ensure documentation existed to demonstrate compliance with all related prior licensing commitments and to reconstitute missing documentation."

ISSUE:

The staff should review selected "reconstituted" documentation to evaluate the licensee's process in ensuring compliance with prior licensing commitments.

REQUEST:

Provide a list of all "reconstituted" documentation.

RAI2 BACKGOUND:

Section 2.5.1.3 of the EPU Licensing Report states:

For those high energy systems that did not have a dynamic seismic analysis, a break was postulated at the weld to every fitting, valve and welded attachment.

Rather than determine all of these locations, a break was postUlated in every compartment the piping run traverses. In addition, a crack was postulated to occur any where along the run of pipe at the most adverse location.

ISSUE:

A review of the EPU Licensing Report indicates the following systems are those for which breaks and cracks are postulated to occur anywhere along the piping run:

Extraction Steam System Condensate Chemical and Volume Control System Charging and Letdown Lines Heater Pump Drain Discharge The staff requires information regarding the routing of these lines in order to perform our review.

-2 REQUEST:

a. Confirm the above systems are all the systems for which breaks and cracks are postulated to occur anywhere along the piping run.
b. Identify the compartments through which each of these lines runs through.

Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION FROM BALANCE OF PLANT BRANCH RE:

EXTENDED POWER UPRATE (TAC NOS. ME1044 AND ME1045)

Dear Mr. Meyer:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated April 7, 2009, as supplemented by letters dated September 11 and October 9, 2009 (Agencywide Documents Access and Management System Accession Nos. ML091250564, ML092570205, and ML092860098), FPL Energy Point Beach, LLC, submitted a request to increase each unit's licensed core power level from 1540 megawatts thermal (MWt) to 1800 MWt reactor core power, and revise the technical specifications to support operation at this increased core thermal power level.

The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on December 30, 2009, it was agreed that you would provide the additional information within 30 days of the date of this letter.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2048.

Sincerely, IRA!

Justin C. Poole, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

Request for Additional Information cc w/encl: Distribution via ListServ DISTRIBUTION PUBLIC RidsNrrLATHarris Resource LPL3-1 rtf RidsNrrPMPointBeach Resource RidsNrrDorlLpl3-1 Resource GCasto, NRR RidsRgn3MailCenter Resource RidsOgcRp Resource ESmith, NRR RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource EDavidson, NRR

'per memo ADAMS Accession Number: ML100080081 dated D ecember 22 2009 OFFICE LPL3-1/PM LPL3-1/LA NRRlSRXB/BC LPL3-1/BC NAME JPoole THarris GCasto*

RPascarelli DATE 01/13/10 01/12110 12/22/09 01/13/10 OFFICIAL RECORD COpy