ML103190636

From kanterella
Jump to navigation Jump to search

Email: Point Beach Nuclear Plant, Units 1 and 2 - Draft Requests for Additional Information (Srxb) EPU LAR Review
ML103190636
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/08/2010
From: Beltz T
Plant Licensing Branch III
To: Hale S
Nextera Energy
beltz T, NRR/DORL/LPL3-1, 301-415-3049
Shared Package
ML103190659 List:
References
TAC ME1044, TAC ME1045
Download: ML103190636 (2)


Text

From:

Beltz, Terry Sent:

Monday, November 08, 2010 3:04 PM To:

Hale, Steve Cc:

Abbott, Liz; Costedio, James; Flentje, Fritzie; Hanneman, Harv

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Draft Requests for Additional Information (SRXB) re: EPU LAR Review (TAC Nos. ME1044 and ME1045)

Attachments:

Draft SGTR RAIs (SRXB)_Round 3.docx

Dear Mr. Hale:

The U.S. Nuclear Regulatory Commission (NRC) staff in the Reactor Systems Branch of the Office of Nuclear Reactor Regulation is reviewing the Extended Power Uprate (EPU) license amendment request (LAR 261) for Units 1 and 2 of the Point Beach Nuclear Plant. The staff determined that additional information is required to continue its review. Draft questions are provided as an attachment to this e-mail.

The questions have been developed from draft requests for additional information (RAI) previously submitted to NextEra Energy on October 19, 2010 (Agencywide Documents Access and Management System No. ML103000246). A public meeting was held on November 2, 2010, between NextEra Energy and the NRC staff. During that meeting, the NRC staff provided NextEra additional information related to its review of the EPU and Alternate Source Term LARs. The attached RAIs expand upon the October 19, 2010, RAIs and incorporate additional actions resulting from the public meeting.

The NRC staff would like to discuss these questions with your staff in a conference call or meeting prior to formal issuance. Among other things, the discussion will include how the NRC would formally issue these questions and how the licensee will respond to them.

The sole purpose of this e-mail and its attachment is to prepare you and others for the proposed conference call or meeting. This e-mail and its attachment do not convey a formal NRC staff position, and do not formally request additional information.

Please don't hesitate to contact me if you have any questions or concerns.

Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov E-mail Properties Mail Envelope Properties ()

Subject:

Point Beach Nuclear Plant, Units 1 and 2 - Draft Requests for Additional

Information (SRXB) re: EPU LAR Review (TAC Nos. ME1044 and ME1045)

Sent Date: 11/8/2010 12:30:00 PM Received Date: 11/8/2010 3:04:00 PM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:

Steve.Hale@nexteraenergy.com (Hale, Steve)

Tracking Status: None Liz.Abbott@fpl.com (Abbott, Liz)

Tracking Status: None JAMES.COSTEDIO@nexteraenergy.com (Costedio, James)

Tracking Status: None Fritzie.Flentje@nexteraenergy.com (Flentje, Fritzie)

Tracking Status: None Harv.Hanneman@nexteraenergy.com (Hanneman, Harv)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 44525 11/8/2010 Draft SGTR RAIs (SRXB)_Round 3.docx 31503 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: