Mid Cycle Performance Review, and Inspection Plan - Report 22
ML082460600
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/02/2008
From: Marvin Sykes
NRC/RGN-II/DRP/RPB3
To: Young D
Progress Energy Florida
Shared Package
ML082460598 List:
References
Download: ML082460600 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 September 2, 2008 Mr. Dale E. Young Vice President Crystal River Nuclear Plant (NA1B) 15760 West Power Line Street Crystal River, FL 34428-6708

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

CRYSTAL RIVER NUCLEAR PLANT

Dear Mr. Young:

On August 13, 2008, the NRC staff completed its performance review of Crystal River Nuclear Plant, Unit 3 for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use OnlySecurity Related Information" will include the Physical Protection/Security cornerstone performance review and resultant inspection plan.

Plant performance for the most recent quarter at Crystal River Unit 3 was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In addition, TI 2515/173, Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative, will be performed at your facility prior to August 30, 2010. In the near term, we will contact you to assess your readiness for this inspection and then finalize our schedule accordingly.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

FPC 2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 404-562-4629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects

Enclosure:

Crystal River Nuclear Plant Inspection / Activity Plan Docket No. 50-302 License No. DPR-72

_________________________ X SUNSI REVIEW COMPLETE /SON/

OFFICE RII:DRP RII:DRP SIGNATURE SON /RA/ MDS /RA/

NAME SNinh MSykes DATE 08/29/2008 08/29/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FPC 3 cc w/encl:

Brian C. McCabe Manager R. Alexander Glenn Nuclear Regulatory Affairs Associate General Counsel Progress Energy (MAC - BT15A)

Electronic Mail Distribution Florida Power Corporation Electronic Mail Distribution Jon A. Franke Director Site Operations Steven R. Carr Crystal River Nuclear Plant (NA2C) Associate General Counsel Electronic Mail Distribution Legal Department Progress Energy Service Company, LLC R. J. Duncan, II P.O. Box 1551 Vice President Raleigh, NC 27602-1551 Nuclear Operations Carolina Power & Light Company Senior Resident Inspector Electronic Mail Distribution Florida Power Corporation Crystal River Nuclear Generating Plant Michael J. Annacone U.S. NRC Plant General Manager 6745 N Tallahassee Rd Crystal River Nuclear Plant (NA2C) Crystal River, FL 34428 Electronic Mail Distribution William A. Passetti Phyllis Dixon Chief Manager Florida Bureau of Radiation Control Nuclear Assessment Department of Health Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Electronic Mail Distribution Craig Fugate Stephen J. Cahill Director Engineering Manager Division of Emergency Preparedness Crystal River Nuclear Plant (NA2C) Department of Community Affairs Electronic Mail Distribution Electronic Mail Distribution Daniel J. Roderick Chairman Vice President Board of County Commissioners Nuclear Projects and Construction Citrus County Crystal River Nuclear Plant 110 N. Apopka Avenue Electronic Mail Distribution Inverness, FL 36250 David M. Varner Attorney General Manager Department of Legal Affairs Support Services - Nuclear The Capitol PL-01 Crystal River Nuclear Plant Tallahassee, FL 32399-1050 Electronic Mail Distribution

FPC 4 Letter to Dale E. Young from Marvin D. Sykes dated September 2, 2008

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

CRYSTAL RIVER NUCLEAR PLANT Distribution w/encl:

C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC Farideh E. Saba, NRR Institute of Nuclear Power (INPO)