ML053000070
ML053000070 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 10/20/2005 |
From: | Susquehanna |
To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
028401 TSB1, Rev 64 | |
Download: ML053000070 (107) | |
Text
Oct. 20, 2005 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2005-45396 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 10/20/2005 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TSB1 - TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 10/06/2005 ADD MANUAL TABLE OF CONTENTS DATE: 10/19/2005 CATEGORY: DOCUMENTS TYPE: TSB1 ID: TEXT 3.1.8 REMOVE: REV:0 ADD: REV: 1 CATEGORY: DOCUMENTS TYPE: TSB1 ID: TEXT LOES REMOVE: REV:64 C)C)
Oct. 20, 2005 Page 2 of 2 ADD: REV: 65 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL
, Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL Table Of Contents Issue Date: 10/19/2005 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 65 10/19/2005
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 7 04/18/2005
Title:
TABLE OF CONTENTS TEXT 2.1.1 1 04/27/2004
Title:
SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2.1.2 0 11/15/2002
Title:
SAFETY LIMITS (SLS) REACTOR COOLANT SYSTEM (RCS) 'PRESSURE SL 4,/ . ., :
TEXT 3.0 1 04/18/2005
Title:
LIMITING CONDITION FOR OPERATION-(LCO) 'APPLICABILITY TEXT 3.1.1 0 11/15/2002
Title:
REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)
TEXT 3.1.2 . 0 11/15/2002 -
Title:
REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 1 07/06/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY
.t. .
TEXT 3.1.4 I UIIU0IZUUZ
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5 1 07/06/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6 1 02/17/2005
Title:
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Report Date: 10/19/05 Pagel1 Page of of 88 Report Date: 10/19/05
SSES MANUAL f Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL I-J TEXT 3.1.7 1 08/30/2005
Title:
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 1 10/19/2005
Title:
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 0 11/15/2002
Title:
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)
TEXT 3.2.2 0 11/15/2002
Title:
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3 0 11/15/2002
Title:
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)
TEXT 3.2.4 1 07/06/2005
Title:
POWER DISTRIBUTION LIMITS AVERAGE POWER RANGE MONITOR (APRM) GAIN AND SETPOINTS- _
TEXT 3.3.1.1 .2 07/06/2005
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 0 11/15/2002
Title:
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.1.3 0 11/22/2004
Title:
OPRM INSTRUMENTATION TEXT 3.3.2.1 1 02/17/2005
Title:
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 0 11/15/2002
Title:
INSTRUMENTATION FEEDWATER - MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 2 07/06/2005
Title:
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION Page2 of8 ReortDate 10/9/0 Page 2 of 8 Report Date: 10/19/05
SSES -MANUAL Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.3.3.2 1 04/18/2005
Title:
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 0 11/15/2002
Title:
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION TEXT 3.3.4.2 0 11/15/2002
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 2 07/06/2005
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/15/2002
Title:
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION "EXT 3.3.6.1 1 11/09/2004
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 .1 11/09/2004
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 0 11/15/2002
Title:
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 1 09/02/2004
Title:
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/15/2002
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 2 11/22/2004
Title:
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 0 11/15/2002
Title:
REACTOR COOLANT SYSTEM (RCS) JET PUMPS Report Date: 10/19/05 Page33 Page of of 88 Report Date: 10/19/05
l SSES MANUAL I I
Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.4.3 0 11/15/2002
Title:
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
TEXT 3.4.4 0 11/15/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 0 11/15/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
- HOT SHUTDOWN TEXT 3.4.9 *0 11/15/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
- COLD SHUTDOWN TEXT 3.4.10 0 11/15/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 0 11/15/2002
Title:
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 1 04/18/2005
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS - OPERATING TEXT 3.5.2 0 11/15/2002
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS - SHUTDOWN TEXT 3.5.3 1 04/18/2005
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM RCIC SYSTEM Report Date: 10/19/05 Page4 Page 4 of of 88 Report Date: 10/19/05
SSES MANUAL
, Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.6.1.1 0 11/15/2002
Title:
CONTAINMENT SYSTEMS PR IMARY CONTAINMENT TEXT 3.6.1.2 0 11/15/2002
Title:
CONTAINMENT SYSTEMS PR IMARY CONTAINMENT AIR LOCK TEXT 3.6.1.3 2 08/24/2005
Title:
CONTAINMENT SYSTEMS PR IMARY CONTAINMENT ISOLATION VALVES (PCIVS)
TEXT 3.6.1.4 0 11/15/2002
Title:
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 1 10/05/2005
Title:
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE
-EXT 3.6.1.6 0 11/15/2002 v
Title:
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 o 11/15/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 0 11/15/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 0 11/15/2002.
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 0 11/15/2002
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 1 04/18/2005
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS TEXT 3.6.3.2 1 04/18/2005
Title:
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM Report Date: 10/19/05 PageS5 Page of of 88 Report Date:-10/19/05
l 1;.
SSES MANUAL Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL iji TEXT 3.6.3.3 0 11/15/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 3 10/05/2005
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 2 01/03/2005
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 2 11/09/2004
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 0 11/15/2002
Title:
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
TEXT 3.7.2 1 11/09/2004
.l
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 .0 11/15/2002
Title:
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 0 11/15/2002
Title:
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 0 11/15/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 1 01/17/2005
Title:
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 0 11/15/2002
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.8.1 3 10/05/2005
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING I Report Date: 10/19/05 Page66 Page of of 8 8 Report Date: 10/19/05
SSES MANUAL Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.8.2 0 11/15/2002
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN TEXT 3.8.3 0 11/15/2002
Title:
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL, LUBE OIL, AND STARTING AIR TEXT 3.8.4 0 11/15/2002
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING TEXT 3.8.5 0 11/15/2002
Title:
ELECTRICAL POWER SYSEMS DC SOURCES - SHUTDOWN TEXT 3.8.6 0 11/15/2002
Title:
ELECTRICAL POWER SYSI'EMS BATTERY CELL PARAMETERS "EXT 3.8.7 1 10/05/2005
Title:
ELECTRICAL POWER SYSI'EMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 0 il/15/2002
Title:
ELECTRICAL POWER SYS7'EMS DISTRIBUTION SYSTEMS - SHUTDOWN TEXT 3.9.1 0 11/15/2002
Title:
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 0 11/15/2002
Title:
REFUELING IOPERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 0 11/15/2002
Title:
REFUELING (OPERATIONS CONTROL ROD POSITION TEXT 3.9.4 0 11/15/2002
Title:
REFUELING IOPERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 0 11/15/2002
Title:
REFUELING IOPERATIONS CONTROL ROD OPERABILITY - REFUELING Report Date: 10/19/05 Page7 Page 7 of of 88 Report Date: 10/19/05
I.-
SSES MANUAL Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL 11J TEXT 3.9.6 0 11/15/2002
Title:
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 0 11/15/2002
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 0 11/15/2002
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL TEXT 3.10.1 0 11/15/2002
Title:
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 0 11/15/2002
Title:
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 0 11/15/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN jJ TEXT 3.10.4 0 11/15/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN TEXT 3.10.5 0 11/15/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 0 11/15/2002
Title:
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL - REFUELING TEXT 3.10.7 0 11/15/2002
Title:
SPECIAL OPERATIONS CONTROL ROD TESTING - OPERATING TEXT 3.10.8 0 11/15/2002
Title:
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Page 8 of 8 RePort Date: 10/19/05
SUSQUEHANNA STEAM ELECTRIC STATION UST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision TOC Table of Contents 7 B 2.0 SAFETY LIMITS BASES Page B 2.0-1 0.
- Page TS / B 2.0-2, 2 Page TS / B 2.0-3 3 Pages TS/ B 2.0-4 and TS / B 2.0-5 2 Page TS / B 2.0-6 1 Pages B 2.0-7 through B 2.0-9 ,
B 3.0 LCO AND SR APPLICABILITY BASES /
Pages B 3.0-1 through B 3.0-4
- 0 Pages TS / B 3.0-5 through TS / B 3.0-7 7" 1 Pages TS / B 3.0-8 through TS / B 3.0-9 ' 2 Pages TS / B 3.0-10 through TS / B 3.0-12 '. ", 1 Pages TS / B 3.0-13 through TS / B 3.0 2 Pages TS B 3.0-16 and TS B 3.0-17 0 B3.1 REACTIVITY CONTROL BASES ' e Pages B 3.1-1 through B 3.1-5 ,'r,> ,r 0 PagesTS/B3.1-6andTS/B B 3.1-7 ". I 3 1 13 Pages B 3.1-8 through B . - , ;)
Page TS / B 3.1-14 . / " 0 Pages B 3.1-15 through B 3.1 - I Page TS / B 3.1-23./ *-'i 0 Pages B 3.1-24 through B1.3.1-27 2 Page TS / B 3.1-28 \
0 Page TS / B-3.1-29 M, -
Pages B 3!1-30 through B 3.1-33 I
II Pages TS I B 3.3-34'through'TS /B 3.3-36 1I Page'TS I B 3.1-37 Pag6 TS / B 3.1-38 I (Pages B3.1-39 through B 3.1-44 10 PageTSiB3.1-45
,,Pages B 3.1-46 and B 3.1-47 10 Pages TS / B 3.1-48 and TS I B 3.1-49
-,Page B 3.1-50 I1 Page TS B 3.1-51 B 3.2 I
POWER DISTRIBUTION LIMITS BASES Page TS / B 3.2-1 Page TS / B 3.2-2 .2 Page TS / B 3.2-3 Page TS / B 3.2-4 2 Pages TS / B 3.2-5 and TS I B 3.2-6 1 Page B 3.2-7 0 Pages TS / B 3.2-8 through TS I B 3.2-10 I Revision 65 SUSQUEHANNA - UNIT-UNIT II ' TS /I B TS B LOES-1 LOES-1 'Revision 65
SUSQUEHANNA STEAM ELECTRIC STATION UST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS / B3.2-11 2 Page B 3.2-12 0 Page TS / B 3.2-13 . 2 Pages B3.2-14 and B 3.2-15 0 Page TS / B 3.2-16 2 Pages B 3.2-17 and B 3.2-18 0 Page TS B 3.2-19 3 B 3.3 INSTRUMENTATION Pages TS / B3.3-1 through TS B 3.3-4 1 Page TS I B 3.3-5 2 Page TS / B 3.3-6 1 Pages TS l B 3.3-7 through TS I B 3.3-11 2-Page TS I B 3.3-12 2 Page TS B 3.3-13 1 PageTS/B3.3-14 ' 2 Pages TS I B 3.3-15 and TS / B 3.3-16 1 Pages TS / B 3.3-17 and TS I B 3.3-18 2 Pages TS I B 3.3-19 through TS I B 3.3-27 , 1 Pages TS / B 3.3-28 through TS I B 3.3-31 '2 Pages TS / B 3.3-32 and TS I B 3.3-33 4 Pages TS I B 3.3-34 through TS I B3.3-43 1 Pages TS 1B 3.3-43a through TS I B 3.3-43i 0 Pages TS I B3.3-44 through TS / B3.3;50 -- 2 PagesTS I B 3.3-51 through TS I B 3.3-53 - 1 Page TS I B3.3-54 . ' .2 Pages B 3.3-55 through B 3.3-63 0 Pages TS /B3.3-64 and TS IlB 3.3-65 2 Page TSI B 3.3-66 4 Page TSI B 3.3-67 ' 3 Page TS B 3.3-68 . - 4 Pages TS I B3.3-69 and TS B 3.3-70 3 Page TSlB3.3-71 - 3 Pages TS / 3.3-72 through TS / 3.3-75 2 Page TS / B 3.3-75a 4 Pages TS / B3.3-75b and'TS / B 3.3-75c 4 Pages B 3.3-76 through 3.3-77 0 Page TS / B 3.3-78 ' ' 1 Pages B3.3-79 through B 3.3-89 0 Page TS / B 3.3-90 ' 1 Page B 3.3-91 . 0 Page TS / B 3.3-92 through TS / B 3.3-100 1 Pages B3.3-1 01 through B 3.3-103 0 Page TS / B 3.3-104 - - 1 Pages B3.3-105 and B 3.3-106 0 Page TS B13.3-107 1 Page B 3.3-108 , 0 Revision 65 UNIT I1
, SUSQUEHANNA - UNIT TS / B LOES-2 TS/B LOES-2 . Revision 65
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title -Revision Page TS/ B 3.3-109 1 Pages B 3.3-110 and B 3.3-111 0 Pages TS / B 3.3-112 and TS / B 3.3-112a 1 PagesTS/B3.3-113andTS/B3.3-114 Page TS/B3.3-115 Page TS / B 3.3-116 1:
Page TS / B 3.3-117 0 Pages B3.3-118 through B3.3-122 1 Pages TS / B 3.3-123 and TS B 3.3-124 0 Page TS/ B 3.3-124a 0 Page B 3;3-125 O Page TS / B 3.3-126 O Page TS / B 3.3-127 0 Pages B 3.3-128 through B 3.3-130 I Page TS / B3.3-131 Pages B 3.3-132 through B3.3-137 0 Page TS / B3.3-138 Pages B3.3-139 through B3.3-149 Page TS / B3.3-150 through TS / B 3.3-162 Page TS / B3.3-163 2 Pages TS I B 3.3-164 through TS / B 3.3-177 *1 Pages TS / B 3.3-178 and TS / B 3.3-179 2, Page TS / B3.3-179a 2 Page TS / B 3.3-179b 0 Page TS/B3.3-179c Page TS B3.3-180 Page TS / B 3.3-181 - 2 Pages TS I B 3.3-182 through TS I B 3.3-186 1 Pages TS / B 3.3-187 and TS / B 3.3-188 2 Pages TS / B 3.3-189 through TS / B 3.3-191 1 Pages B 3.3-192 through B 3.3-204 Page TS / B 3.3-205 0 Pages B 3.3-206 through B 3.3-219 B 3.4 'REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 and B 3.4-2 0 Page TS / B 3.4-3 and Page TS / B 3.4-4 3 Pages TS / B 3.4-5 through TS / B 3.4-9 2 Pages B 3.4-10 through B 3.4-14 .0 Page TS / B 3.4-15 '1° Pages TS / B 3.4-16 and TS B 3.4-17 2 Page TS / B 3.4-18 1 Pages B 3.4-19 through B 3.4-28 ' 0 Page TS/B3.4-29 1 Pages B 3.4-30 and B 3.4-31 0 Page TS / B 3.4-32 .1 Pages B 3.4-33 through B,3.4-36' .0 TSIBLOES-3 Revision 65 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT I1 TS / B LOES-3 Revision 65
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision
- Page TS / B 3.4-37 1 Pages B 3.4-38 through B 3.4-40 -0 PageTS/B3.4-41 . 1 Pages B 3.4-42 through B 3.4-48 0
- Page TS / B 3.4-49 -2 PageTS/B3.4-50 1 Page TS / B 3.4-51 - 2 Pages TS I B 3.4-52 and TS / B3.4-53 1
-Page TS / B 3.4-54 2 Page TS B 3.4-55 2 PageTS/B3.4-56 - 1 Page TS/ B 3.4-57 2 Pages TS / B 3.4-58 through TS / B3.4-60 1 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 0 PageTS/B3.5-3 - 2 PageTS/B3.5-4 . 1 PageTS/B3.5-5 2 PageTS/B3.5-6 - .1 Pages B 3.5-7 through B 3.5-10 0 PageTS/B3.5-11 1 Pages B 3.5-12 through B 3.5-15 - 0 Pages TS / B3.5-16 through TS / B 3.5-18 1 Pages B 3.5-19 through B 3.5-24 - 0 Page TS / B3.5-25 : 1 Pages TS / B 3.5-26 and TS I B 3.5-27 1 Pages B 3.5-28 through B 3.5-31 0 B 3.6 CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1 .. 2 PageTS/B3.6-1a 3 Pages TS I B 3.6-2 through TS B 3.6-5 2 PageTS/B3.6-6 3 Pages TS / B 3.6-6a and TS B 3.6-6b 2 Page TS / B 3.6-6c 0 Pages 8 3.6-7 through B 3.6-14 0 PageTS/B3.6-15 2 Pages TS / B 3.6-15a and TS I B 3.6-15b 0 Page B 3.6-16 0 Page TS / B3.6-17 1 PageTS/B3.6-17a - 0 Pages TS /B3.6-18 and TS /B3.6-19 0 Page TS /B 3.6-20 1 PageTS/B3.6-21 2 Page TS/B3.6-22 - 1 Page TS B3.6-22a . 0
_UQEAN - UNI _ SIBLE- _ eiin6 SUSQUEHANNA UNIT 1 TS / B LOES-4 Revision 65
SUSQUEHANNA STEAM ELECTRIC STATION LUST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS/ B 3.6-23 Pages TS / B 3.6-24 through TS I B 3.6-25 0 PageTS/B3.6-26 Page TS/B3.6-27 2 Page TS / B 3.6-28 5 Page TS I B 3.6-29 1 Page TS I B 3.6-30 Page TS / B 3.6-31 3 Page B 3.6-32 0 Page TS / B 3.6-33 Pages B 3.6-34 and B 3.6-35 0I Page TS / B 3.6-36 Page B 3.6-37 01 Page TS / B 3.6-38 0 Page B 3.6-39 Page TS I B 3.6-40 3 Pages B3.6-41 through B 3.6-43 0 Pages TS / B 3.6-44 and TS I B 3.6-45 2 Page TS / B 3.6-46 2 Pages TS I B 3.6-47 through TS I B 3.6-51 Page TS / B3.6-52 Pages B 3.6-53 through B 3.6-63 20 Page TS / B 3.6-64 *1 Pages B 3.6-65 through B 3.6-72 Page TS I B 3.6-73 *1 Pages B 3.6-74 through B 3.6-77 O Page TS / B 3.6-78 Pages B 3.6-79 through B 3.3.6-83 Page TS / B 3.6-84 3 Pages TS / B 3.6-85 and TS i B 3.6-86 2 Page TS / B 3.6-87 Pages TS / B 3.6-88 and TS / B 3.6-88a * . 2 Page TS / B 3.6-89 3 Page TS l B 3.6-90 1 PageTS/B3.6-91 3.
Pages TS / B 3.6-92 through TS I B 3.6-96 1 Page TS / B 3.6-97 2 Pages TS / B 3.6-98 and TS / B 3.6-99 1 Page TS / B3.6-1 00 2 Pages TS / B 3.6-101 and TS / B 3.6-102 1 Pages TS / B 3.6-103 through TS / B 3.6-105 2 Pages TS / B 3.6-106 and TS I B 3.6-107 1 SUSUEHNN -UIIT/BOS5Rvso65 SUSQUEHANNA - UNIT 1 TS / B LOES-5 Revision 65 -
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision B 3.7 PLANT SYSTEMS BASES Pages TS / B 3.7-1 through TS I B 3.7-6 2 Page TS / B 3.7-6a .2 Pages TS / B 3 3.7-6b and TS / B 3.7-6c 0
- PageTS/B3.7-7 2 Pages TS / B 3.7-8 through TS / B 3.7-11 Pages TS / B 3.7-12 and TS/ B 3.7-13 Pages TS / B 3.7-14 through TS I B 3.7-18 *2 Page TS / B 3.7-18a Pages TS / B 3.7-19 through TS / B 3.7-23 Pages B 3.7-24 through B 3.7-26 Pages TS I B 3.7-27 through TS / B 3.7-29 4 Page TS / B 3.7-30 2 Pages B 3.7-31 through B 3.7-33 0 B 3.8 ELECTRICAL POWER SYSTEMS BASES Pages TS / B 3.8-1 through TS / B 3.8-4 .2 Page TS / B 3.8-5 4 PageTS/B3.8-6 3 Pages TS / B 3.8-7 through TS/B 3.8-8 2 Page TS / B 3.8-9 4 Page TS / B 3.8-10 3 Pages TS / B 3.8-11 and TS/ B 3.8-17 2 Page TS / B 3.8-18 3 Pages TS I B 3.8-19 through TS I B 3.8-21 2 Pages TS / B.3.8-22 and TS I B 3.8-23 - 3 Pages TS / B 3.8-24 through TS / B 3.8-37 2 Pages B 3.8-38 through B 3.8-53 .0O Pages TS / B 3.8-54 through TS I B 3.8-61 Page TS / B 3.8-62. 2 Page TS / B 3.8-63 2 PageTSIB3.8-64 1 Page TS / B 3.8-65
- 2 Pages B 3.8-66 through B 3.8-80 0 Page TS /B 3.8-81 10 Pages B 3.8-82 through B 3.8-90 B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS / B 3.9-1a 1 Pages TS / B 3.9-2 through TS / B 3.9-4 1 Pages B 3.9-5 through B 3.9-30 0 I
Revision 65 SUSQUEHANNA - UNIT
- UNIT I1 TS/ B LOES-6
. TSIB LOES-6 Revision 65
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision B 3.10 SPECIAL OPERATIONS BASES PageTS/B3.10-1 I -
Pages B 3.10-2 through B 3.10-31 0 -
PageTS/B3.10-32 1° '
Pages B 3.10-33 through B 3.10-37 0 PageTS/B3.10-38 I TSB1 texd LOES 9t21/05
- TT/
L E_ UN ei i n6 SUSQUEHANNA - UNIT I SUSQUEHANNA_TS / B LOES-7 Revision 65
PPL Rev. 1 SDV Vent and Drain Valves B 3.1.8 B 3.1 REACTIVITY CONTROL SYSTEMS B 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves BASES -
BACKGROUND The SDV vent and drain valves are normally open and discharge any accumulated water in the SDV to ensure that sufficient volume is available at all times to'allow a complete scram. During a scram, the SDV vent and drain valves close to contain reactor water. The SDV is a volume of header piping that connects to each hydraulic control unit (HCU) and drains into an instrument volume. There are two SDVs (headers) and two instrument volumes, each receiving approximately one half of the control rod drive (CRD) discharges. The two instrument volumes are connected to a common drain line with two valves in series. Each header is connected to a common vent line with two'valves in series. The header piping is sized to receive and contain all the water discharged by the CRDs during a scram. The design and fuhctions of the SDV are described in Reference 1.
APPLICABLE The Design Basis Accident and transient analyses assume all of the-SAFETY control rods are capable of scramming. The acceptance criteria for the ANALYSES SDV vent and drain valves are that they operate automatically to:
- a. Close during scram to limit the amount of reactor coolant discharged so that adequate core cooling is maintained and offsite doses remain within the limits of 10 CFR 10O(Ref. 2); and
- b. Open on scram reset to maintain the SDV vent and drain path open so that there is sufficient volume to accept the reactor coolant discharged during a scram.
Isolation of the SDV can also be accomplished by manual closure of the SDV valves. Additionally, the discharge of reactor coolant to the SDV can be terminated by scram reset or closure of the HCU manual isolation valves. For a bounding leakage case, the offsite doses are well within the limits of 10 CFR'100 (Ref. 2), and adequate core cooling is maintained (Ref. 3). The SDV vent and drain valves allow continuous drainage of the SDV during normal plant operation (continued)
SUSQUEHANNA- UNIT 3
-B 3.1-47 Revision 0
' PPL Rev. I SDV Vent and Drain Valves;
- - : B 3.1.8 BASES APPLICABLE to ensure that the SDV has sufficient capacity to contain the reactor SAFETY -coolant discharge during a full core scram. To automatically ensure this ANALYSES capacity, a reactor scram (LCO 3.3.1.1, "Reactor Protection System (RPS)
(continued) Instrumentation') is initiated if the SDV water level in the instrument volume exceeds a specified setpoint. The setpoint is chosen so that all control rods are inserted before the SDV has insufficient volume to accept a full scram.
SDV vent and drain valves satisfy Criterion 3 of the NRC Policy Statement (Ref. 4).
LCO The OPERABILITY of all SDV vent and drain valves ensures that the SDV vent and drain valves will close during a scram to contain reactor water discharged to the SDV piping. The SDV vent and drain valves are required to be open to' ensure the SDV is drained. Since the vent and drain lines are provided with two valves in series, the single failure of one valve in the open position will not impair the isolation function of the system. Additionally, the valves are required to open on scram reset to ensure that a path is available for the SDV piping to drain freely at other times. -
APPLICABILITY In MODES 1 and 2, scram may be required; therefore, the SDV vent and drain valves must be OPERABLE. In MODES 3 and 4, control rods are
- not able to be withdrawn (except as permitted by LCO 3.10.3 and LCO 3.10.4) since the reactor mode switch is in shutdown and a control rod block is applied. This provides adequate controls to ensure that only a single control rod can be withdrawn. Also, during MODE 5, only a single control rod can be withdrawn from a core cell containing fuel assemblies.
- 'Therefore, the SDV vent and drain valves are not required to be OPERABLE in these MODES since the reactor is subcritical and only one rod may be withdrawn' and subject to scram.
ACTIONS The ACTIONS table is modified by a Note 1 indicating that a separate
- Condition entry is allowed for the SDV vent line and the SDV drain line. This is acceptable, since the
- -- (continued)
SUSQUEHANNA - UNIT 1 TS / B3.1-48 Revision I '
PPL Rev. 1 SDV Vent and Drain Valves
-. - B 3;1.8 3
BASES ACTIONS Required Actions for each Condition provide appropriate compensatory (continued) actions for each inoperable'SDV line. Complying with the Required Actions may allow for continued operation, and subsequent inoperable SDV lines are governed by subsequent Condition entry and application of; associated Required Actions.
The ACTIONS table is modified by a second note stating that a isolated line may be unisolated under administrative control to allow draining and venting of the SDV. When a line is isolated, the potential for an inadvertent scram due to high SDV level is increased. During these periods, the line may be unisolated under administrative control. This allows any accumulated water in the line to be drained, to preclude a reactor scram on high SDV level. This is acceptable since administrative controls ensure the valve can be closed quickly, if a scram occurs with the valve open.
A.1 When one SDV vent or drain valve is inoperable but openin one or more lines, the associated line must be isolated to contain the reactor coolant during a scram. The 7 day Completion Time is reasonable, given the level of redundancy in the lines and the low probability of-a scram occurring while the valve(s) are inoperable and the line is not isolated. The SDV is still isolable since'the redundant valve in the affected line is OPERABLE.
During these periods, the single failure criterion is not preserved, and a higher risk exists to allow reactor water out of the primary system during a scram.
B.1 If both valves in a line are inoperable, the line must be isolated to contain the reactor coolant during a scram.
The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time to isolate the line is based on the low probability of a scram-occurring while the line is not isolated and unlikelihood of significant CRD seal leakage.
C.1 If any Required Action and associated Completion Time is not met, the plant must be brought to a MODE in which the LCO (continued)
SUSQUEHANNA'- UNIT 1 - TS / 8 3.1-49 Revision 1
PPL Rev. 1 SDV Vent and Drain Valves B 3.1.8 BASES ACTIONS C.1 (continued) does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.1.8.1 REQUIREMENTS During normal operation, the SDV vent and drain valves should be in the open position (except when performing SR 3.1.8.2) to allow for drainage of the SDV piping. Verifying that each valve is in the open position ensures that the SDV vent and drain valves will perform their intended functions during normal operation. This SR does not require any testing or valve manipulation; rather, it involves verification that the valves are in the correct position.
The'31 day Frequency is based on engineering judgment and is consistent with the procedural controls governing valve operation, which ensure correct valve positions.
SR 3.1.8.2 During a scram, the SDV vent and drain valves should close to contain the reactor water discharged to the SDV piping. Cycling each valve through its complete range of motion (closed and open) 6nsures that the valve will function properly during a scram. The 92 day Frequency is based on
- operating experience and takes into account the level of redundancy in the system design.
SR 3.1.8.3 SR 3.1.8.3 is an integrated test of the SDV vent and drain valves to verify total system performance. After receipt of a simulated or actual scram signal, the closure of the SDV vent and drain valves is verified. The closure time of
- (continued)
SUSQUEHANNA - UNIT I B 3.1-50 Revision 0
PPL Rev. 1 SDV Vent and Drain Valves B 3.1.8 BASES SR 3.1.8.3 (continued)
REQUIREMENTS 30 seconds after receipt of a scram signal is based on the bounding leakage case evaluated in the accident analysis based on the requirements of Reference 2. Similarly, after receipt of a simulated or actual scram reset signal, the opening of the SDV vent and drain valves is verified. The LOGIC SYSTEM FUNCTIONAL TEST in LCO 3.3.1.1 and the scram time testing of control rods in LCO 3.1.3 overlap this Surveillance to provide complete testing of the assumed safety function.
The 24 month Frequency is based on the need to perform portions of this Surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the Surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the Surveillance when performed at the 24 month Frequency; therefore, the Frequency was concluded to be acceptable from a reliability standpoint.
REFERENCES 1. FSAR, Section 4.6.
- 2. 10 CFR 100.
- 3. *NUREG-0803, "Generic Safety Evaluation Report Regarding Integrity of BWR Scram System Piping," August 1981.
- 4. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
- 5. TSTF-404-A, Rev. 0.
SUSQUEHANNA- UNITI TS / B 3.1-51 R Revision 1-
Oct. 20, 2005 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2005-45215 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 10/20/2005 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TRM1 - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 10/11/2005 ADD MANUAL TABLE OF CONTENTS DATE: 10/19/2005 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT 3.3.6 REMOVE: REV:1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT B3.3.6 REMOVE: REV:2
Oct. 20, 2005 Page 2 of 2 ADD: REV: 3 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT LOES REMOVE: REV:21 ADD: REV: 22 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
z - SSES MANUAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 10/19/2005 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 22 10/19/2005
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 5 02/04/2005
Title:
TABLE OF CONTENTS TEXT 1.1 0 11/18/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 3 12/14/2004
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 0 ,11/18/2002
Title:
TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)
APPLICABILITY .,
TEXT 3.1.1 0; 11/18/2002 -
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 - 0 11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 1 03/10/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
CHECK VALVE TEXT 3.2.1 4 11/22/2004
Title:
CORE OPERATING LIMITS REPORT (COLR)
Pae1 o 5RprtDt:1/90 Page I of 15 Report Date: 10/19/05
SSES MANUAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0 11/18/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 0 11/18/2002
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 0 11/18/2002
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 1 07/06/2005
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/18/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2 10/19/2005
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION I!
TEXT 3.3.7 0 11/18/2002
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 1 11/22/2004
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.4.1 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY
% I*
I/
Page 2 of 15 Report Date: 10/19/05
SSES MANUAL
- Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.2 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 1 12/14/2004
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.5.1 1 02/04/2005
Title:
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 0 11/18/2002
_'\~
Title:
EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 . il/18/2002 -
Title:
EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/18/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0 11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT.CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN Report Date: 10/19/05 Page 33 of of 15 1S Report Date: 10/19/0 5
~- - -or-SSES MANUAL Manual Name: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
--JjJ TEXT 3.7.2 0 11/18/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 0 11/18/2002
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 1 08/24/2005
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 2 08/18/2005
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 0 11/18/2002
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 0 11/18/2002
Title:
PLANT SYSTEMS FIRE HOSE STATIONS '-
TEXT 3.7.3.6 '0 11/18/2002
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 0 11/18/2002
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 4 09/08/2005
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 0 11/18/2002
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM TEXT 3.7.5.1 0 11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Report Date: 10/19/05 Page 44 Page of of 15 15 Report Date: 10119105
SSES .MANUAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.3 0 11/18/2002
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 1 03/01/2005
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 0 11/18/2002
Title:
PLANT SYSTEMS MAIN-CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 1 12/14/2004
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 0 11/18/2002
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC T'EXT 3.7.10 1 12/14/2004
/'
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.8.1 '1 02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 1 12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2 12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES -(MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT 3.8.3 0 11/18/2002
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 0 11/18/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION Pae5 o 5RprtDt:1/90 Page 5 of 15 Report Date: 10/19/05
film SSES MANUAL I Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 111 TEXT 3.8.6 0 11/18/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.9.1 0 11/18/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/18/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 0 11/18/2002
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 0 11/18/2002
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION 1!
TEXT 3.10.3 0 11/18/2002
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 0 11/18/2002
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)
TEXT 3.11.1.1 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION p rt D t : 1 / 9 0 Pa e 6ol5R Page 6 of 15 Report Date: 10/19/05
SSES VANUAL
- Manual Name: TRM1 14anual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.5 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 2 08/24/2005
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM BEXT 3.11.2.5 1 05/20/2005 I
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 . 2 12/14/2004
Title:
RADIOACTIVE EFFLUENTS R; WIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS TC)TAL DOSE -
TEXT 3.11.4.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL Report Date: 10/19/05 Page 7 7 of of 15 15 Report Date: 10/19/05
a SSES MANUAL . l, Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 II TEXT 3.12.2 0 11/19/2002
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT B3.0 0 11/19/2002
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 1 03/10/2005
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING L,IMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 0 11/19/2002
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 0 11/19/2002
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 1 02/04/2005
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 1 07/06/2005
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION Report Date: 10/19/05 Page 88 of of 15 15 Report Date: 10/19/05
-. SSES MANUAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.5 0 11/19/2002
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 3 10/19/2005
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 0 11/19/2002
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT B3.3.9 1 11/22/2004
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 0 11/19/2002
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 '1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Report Date: 10/19/05 Page 99 of of 15 15 Report Date: 10/19/05
HIM-SSES MANUAL I Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
. II TEXT B3.5.1 0 11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 0 11/19/2002
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 0 11/19/2002
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION 'J TEXT B3.6.4 1 12/14/2004 -
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 1 08/24/2005
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS I
Report Date: 10/19/05 Page 10 10 of of 15 15 Report Date: 10/19/05
SSES MANUAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 0 11/19/2002
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1 01/12/2004
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 .0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIIXTURE TEXT B3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 1 03/01/2005
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 1 12/14/2004
Title:
PLANT SYSTEMS BASES SNUBBERS Report Date: 10/19/05 Page 11 of of 15 15 Report Date: 10/19/05
- At-SSES MANUAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1
-. 11 TEXT B3.7.9 1 12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1 1 02/04/2005
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES .. 1:
TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM Report Date: 10/19/05 12 Page 12 of of 15 15 Report Date: 10/19/05
I SSES MANUAL
- Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 0 11/19/2002
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 0 11/19/2002
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)
TEXT B3.11.1.1 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002 v
Title:
RADIOACTIVE EFFLUENTS BASES-LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM Report Date: 10/19/05 Page 13 13 of of 15 15 Report Date: 10/19/05
11?10 SSES MANUAL Manual Nam : TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 1'
TEXT B3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 3 05/20/2005
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 . 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002 I,.
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 4.1 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION Report Date: 10/19/05 Page 14 14 of of 15 15 Report Date: 10/19/05
SSES MANUAL I Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.3 08/31/1998
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS TRAINING Report Date: 10/19/05 Page 15 15 of of 15 15 Report Date: 10119105
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 22 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 01/28/2005 1.0 USE AND APPLICATION' Pages TRM / 1.0-1'through TRM / 1.0-3 10/04/2002 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM I 2.0-2 and TRM /2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM 12.0-5 04/02/1999 Pages TRM / 2.0-6 and TRM / 2.0-7 11/15/2004 Page TRM 12.0-8 / 12/03/2004 Pages TRM / 2.0-9 through TRM /2.0-14 11/15/2004 3.0 APPLICABILITY II 0.v- A TDiA I') A%
DE3-.
Parges~ TrOA ITR MV 3 r% 4I --allU
'.1 I I sIYI 04/08/1999 Pages TRM / 3.0-3 ,,, " 03/15/2002 Page TRM / 3.0-4 '. 4,,.,- 04/08/1999 3.1 REACTIVITY CONTROL SYSTEMS '\
Pages 3.1-1 through 3.1-6 08/31/1998 Pages TRM / 3.1-7 and TRM / 3.1-8 "5. 02/25/2005 Pages TRM / 3.1-9 and TRM ;3.1-9a , 02/18/1999 PageTRM/3.1-10 / 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM /3.2-14< *07/07/1999 Pages TRM 13.2-2'through TRM / 3.2-38 11/15/2004 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Page dTRM /3.3'4A' 11/28/2000 Pages 3.3-5 through 3.3-8 08/31/1998 Pddds`TRM / 3.3-9 and TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-1 0 Y '12/17/1998 Pages TRM / 3.3-11 23.3-11a and TRM 06/02/2005 Page TRM / 3.3-12 03/30/2001 Pages TRM / 3.3-13 09/13/2005 Page TRM /3.3-15 Page TRM /3.3-15 12/14/1998 10/22/2003 I
Page TRM /3.3-16' '- 06/27/2001 Pages TRM / 3.3-17 and TRM /3.3-18 06/14/2002 Pages TRM / 3.3-19 through TRM / 3.3-21 10/22/2003 Page TRM / 3.3-22 11/15/2004 Pages TRM / 3.3-22a through TRM / 3.3-22d 11/1512004 Page TRM / 3.3-23 12/03/2004 Pages TRM / 3.3-24 and TRM / 3.3-25 05/16/2003 Page TRM/3.3-26 10/22/2003 SUSQUEHANNA - UNIT 1 TRM /-LOES-1 EFFECTIVE DATE 09/13/2005
SUSQUEHANNA STEAM ELECTRIC STATION - PPL Rev. 22 LIST OF EFFEC77VE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date
- 3.4 REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 10/23/1998 Pages 3.4-6 through 3.4-11 08/31/1998 Page TRM / 3.4-12 .12/03/2004 Page 3.4-13 08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 04/17/2000 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-3 08/31/1998-Page TRM / 3.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM / 3.6-6 through TRM /3.6-8 12/31/2002 3.7. PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Pages TRM / 3.7-4 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 08/16/2005 Page TRM / 3.7-11 12/29/1999 Pages TRM / 3.7-12 and TRM / 3.7.13 - 08/02/1999 Page TRM / 3.7-14 08/09/2005 Pages TRM /.3.7-15 through TRM / 3.7-27' '08/02/1999 Pages TRM / 3.7-28 and TRM / 3.7-29 08/09/2005 Page TRM / 3.7-30
- 08/25/2005 Pages TRM / 3.7-31 and TRM 3.7-32 11/16/2001 Page TRM / 3.7-33 01/09/2004 Page TRM / 3.7-34 11/16/2001 Page TRM / 3.7-34a 10/05/2002 Pages TRM / 3.7-35 through TRM / 3.7-37 02/01/1999 Pages 3.7-38 through 3.7-40 08/31/1998 Pages TRM / 3.7-41 and TRM / 3.7-41 a . 02/14/2005 Pages 3.7-42 and 3.7-43 08/31/1998 Page TRM / 3.7-44 12/03/2004 Pages 3.7-45 through 3.7-48 10/13/1998 Page TRM / 3.7-49 03/08/2003 Pages TRM / 3.7-50 and TRM / 3.7-51 03/09/2001 Pages TRM / 3.7-52 12/03/2004 Page TRM / 3.7-53 04/15/2003 Page TRM / 3.7-54 07/29/1999 SUSQUEHANNA - UNIT 1 . TRM / LOES-2 STEFFECTIVE DATE 09/13/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 22 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section . Title Effective Date 3.8 ELECTRICAL POWER Page TRM 13.8-1 04/02/2002 Pages TRM / 3.8-2 through TRM i 3.8-4 01/28/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM /3.8-10 12/03/2004 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004 Pages 3.8-13 and 3.8-14 08/31/1998 Pages TRM / 3.8-15 through TRM /3.8-17 04/02/2002 Page 3.8-18 *08/31/1998 Page TRM / 3.8-19 04/02/2002 Page 3.8-20 08/31/1998 Pages TRM / 3.8-21 through TRM /3.8-23 -06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Pages 3.10-1 through 3.10-4 08/31/1998
-Page TRM / 3.10-7 - 04/07/2000 Page TRM / 3.10-8 04/17/2002 3.11 RADIOACTIVE EFFLUENTS .
Pages 3.11-1 through 3.11-9 08/31/1998 Page TRM / 3.11-10 12/03/2004 Pages 3.1 1-11 and 3.11-12 08/31/1998 Page 3.11-13 09/011998 Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/0i/1998 Pages 3.11-17 and 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages 3.11-20 and 3.11-21 08/31/1998 Page TRM / 3.11-22 04/02/2002 Pages TRM / 3.11-23 and TRM / 3.11-24 05/13/2005 Page 3.11-25 09/01/1998 Pages TRM / 3.11-26 through TRM / 3.11-28 01/21/2004 Page TRM / 3.11-29 12/03/2004 Pages TRM / 3.11.30 through TRM /3.11.32 01/21/2004 Pages 3.11-33 through 3.11-37 08/31/1998 Page TRM /3.11-38' 12/03/2004 Pages 3.11-39 through 3.11-44 08/31/1998 Page TRM / 3.11-45 12/03/2004 Pages 3.11-46 and 3.11-47 08/31/1998 SUSQUEHANNA-. UNIT 1 TRM / LOES-3 EFFECTIVE DATE 09/13/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 22 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 . 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0 08/31/1998 SUSQUEHANNA - UNIT 1 TRM /,LO ES-4 EFFECTIVE DATE 09/13/2005
SUSQUEHANNA STEAM ELECTRIC STATION - -PPL Rev. 22 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 through TRM / B 3.0-15 03/15/2002 B3.1 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 07/13/1999 Page B 3.1-4 : 08/31/1998 Page TRM / B 3.1-5 *02/25/2005 Pages TRM / B 3.1.6 and TRM I B 3.1-7 . 07/13/1999 Page TRM / B 3.1-8 02/1811999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Page B 3.3-2 08/31/1998 Pages TRM / B 3.3-3 and TRM I B 3.3-3A 01/31/2005 Pages TRM / B 3.3-4 through TRM / B 3.3-6 06/02/2005
- Pages TRM / B 3.3-7 through TRM / B 3.3-9 03/30/2001 Page B 3.3-10 through B 3.3-12 08/31/1 998 Pages TRM / B 3.3-11 and TRM I B 3.3-12 Page TRM / B 3.3-13 09/13/2005 12/03/2004
'I Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 06114/2002 Page TRM / B 3:3-14b 06/14/2002 Pages TRM / B 3.3-15 and TRM / B 3.3-16 10/22/2003 Page TRM / B 3.3-17 11/15/2004 Pages TRM / B 3.3-17a through TRM / B 3.3-17f 11/15/2004 Pages TRM / B3.3-18 and TRM / B 3.3-19 05/16/2003 Page TRM / B 3.3-20 10/22/2003 Page TRM / B 3.3-21 05/16/2003 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 08/31/1998 Page TRM I B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 08/31/1998 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1 999 Page B 3.6-3 08/31/1998 Page TRM I B 3.6-4 09/23/1999 Page TRM I B 3.6-5 01/07/2002 SUSQUEHANNA - UNIT 1 .TRM / LOES-5 EFFECTIVE DATE 09/13/20b5
SUSQUEHANNA STEAM ELECTRIC STATION - PPL Rev. 22 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / B 3.6-6 : 12/03/2004 Pages B.3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 through TRM / B 3.7-5 08/02/1999 Page TRM / B 3.7-6 08/16/2005 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Pages TRM / B 3.7-8 through TRM / B 3.7-10 08/02/1999 Page TRM / B 3.7-10a 08/02/1999 Pages TRM / B 3.7-11 and TRM / B 3.7-11 a 08/02/1999 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Page TRM / B 3.7-14a 08/02/1999 Page TRM / B 3.7-14b .01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Pages TRM/B 3.7-21 and TRM/B 3.7-21a 02/14/2005 Pages TRMIB 3.7-22 and TRM/B 3.7-23 04/07/2000 Page B 3.7-24 08/31/1998 Page TRM / B 3.7-25 12/03/2004 Pages B 3.7-26 through B 3.7-30 08/31/1998 Page TRM / B 3.7-31 12/03/2004 Page TRM / B 3.7-32 03/09/2001 J Page TRM / B 3.7-33 : 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 -07/05/2000 B 3.8 ELECTRICAL POWER BASES Page TRM I B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM I B 3.8-2a 01/28/2005 Page -TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM/B3.8-4 08/10/2004 Page TRM / B 3.8-4a 04/02/2002 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 08/31/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 08/31/1998 Page TRM / B 3.10-3 03/08/2003 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Pages TRM /lB 3.10-6 and TRM / B 3.10-7 04/17/2002 SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 09/13/2005
SUSQUEHANNA STEAM ELECTRIC STATION. - PPL Rev. 22 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11 -1 through B 3.11-9 08/30/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11 -1Ia 04/07/2000 Pages TRM/B 3.11-12 and TRM1B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 -02/01/1999 Pages B 3.11-16 through B:3.11-19 08/30/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Pages TRM,/ B 3.11-21 through TRM / B 3.11.23a 05/13/2005 Pages TRM / B 3.11-24 and TRM /B,3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-28 08/30/1998 Page TRM / B 3.11-29 and TRM I B 3.11-30 12/03/2004 Pages B 3.7-31 through B 3.7-35 8/30/19998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 02/05/1999 TRM1 text LOES 9005 SUSQUEHANNA - UNIT 1 .TRMYLOES-7 UTEFFECTIVE DATE 09/13/2005
TRM Isolation Actuation Instrumentation PPL Rev. 3 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES TRO The TRM Actuation instrumentation automatically initiates closure of appropriate primary containment isolation valves (PCIVs). The function of the PCIVs, in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs) (Reference 1). The TRM Isolation Actuation Instrument has been relocated from the Technical Specifications because the identified Function is not credited in the plant design basis to mitigate any plant event, but does provide a diverse means to initiate an Isolation Actuation.
The isolation instrumentation includes the sensors, relays, and instruments that are necessary to cause initiation of primary containment and Reactor Coolant Pressure Boundary (RCPB) isolation. When the setpoint is reached, the sensor actuates, which then outputs an isolation signal to the isolation logic. Monitoring a wide range of independent parameters provides functional diversity. The input parameters to the isolation logic are:
(a) Main steam line radiation, (b) Reactor Building Main Steam Differential Temperature - High, (c) Turbine Building Main Steam Line Tunnel Temperature - High, (d) HPCI Pipe Routing Area Differential Temperature - High, (e) HPCI Equipment Room Differential Temperature - High, (f) RCIC Pipe Routing Area Differential Temperature - High, (g) RCIC Equipment Room Differential Temperature - High, (h) RWCU Penetration Area Diffefential Temperature -'High, (i) RWCU Pump Area Differential Temperature - High, j) RWCU Heat Exchanger Area Differential Temperature - High, and (k) RHR Flow - High.
The valves associated with these trip channels are identified in Table B 3.3.6-1. Each of these valves is also associated with other trip channels as identified in LCO Bases B 3.6.1.3.
Functions (d) and (f)'trips will occur only after a 15 minute time delay; the other trips occur after a one second delay. See Tech Spec Basis B 3.3.6-1.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.3-10 EFFECTIVE DATE 08/31/1998
TRM Isolation Actuation Instrumentation PPL Rev. 3 8 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES (continued)
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. The ACTIONS are modified by two Notes. Note 1 allows penetration flow path(s) to be unisolated intermittently
-under administrative controls. These controls consist of stationing a dedicated operator at the controls of the valve, who is in continuous communication with the control room. In this way, the penetration can be rapidly isolated when a need for primary containment isolation is indicated.
Note 2 is provided to modify the ACTIONS for separate Condition entry, consistent with similar Note in the TS 3.3.6.1 Actions.
Condition C applies if the channel is not restored to OPERABLE status or placed in trip, or isolation capability is not restored, within the allowed Completion Time.. If inoperable channels should not be placed in trip (e.g.,
might result in a undesirable transient) Action C may be intentionally entered as a result of not meeting Required Action A.1 in its required Completion Time. Required Action CA requires appropriate compensatory measures be in place within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Examples of appropriate compensatory measures may consist of verifying that diverse isolation functions remain OPERABLE (e.g., area high temperature functions remain OPERABLE when differential temperature Functions are inoperable).
Furthermore, isolating the penetration (e.g., as may be required by TS Actions for an inoperability affecting both the TRM Function and a required TS Function) also provides adequate compensatory actions since isolating the affected penetration flow path(s) accomplishes the safety function of the inoperable channels. If it is not desired to isolate the affected penetration flow path(s) (e.g., as in the case where isolating the penetration flow path(s) could result in a reactor scram or disabling HPCI, RCIC, RWCU or RHR-SDC), alternate compensatory measures should be pursued. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is acceptable due to the fact that these Functions are not assumed in any accident or transient analysis in the FSAR.
TRS The TRSs are defined to be performed at the specified Frequency to ensure
-that the TRM Isolation Actuation Instrumentation Functions are maintained OPERABLE. TRM Isolation Actuation Instrumentation Surveillances are performed consistent with the Bases for LCO 3.3.6.1 "Isolation Activation Instrumentation."
(continued)
SUSQUEHANNA - UNIT 1 --TRM / B3.311 EFFECTIVE DATE 09/13/2005
TRM Isolation Actuation Instrumentation PPL Rev. 3 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES (continued) ' ' I '
TRS 3.3.6.5 The LOGIC SYSTEM FUNCTIONAL TEST demonstrates the OPERABILITY of the required isolation logic for a specific channel. 'The system functional
'testing performed on PCIVs in LCO 3.6.1.3 overlaps this surveillance to provide complete testing of the assumed safety function. The 24 month Frequency is based on the need to perform portions of this surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the surveillance when performed at the 24 month Frequency.
TRS 3.3.6.6' Response time testing for the Function 1.a and Function 2.a
- 10 second requirement per FSAR Table 7.3-29 is met by testing the channel for the s I second channel response time requirement per, FSAR Table 7.3-29 for Function 1.a.
REFERENCES 1. FSAR Section 7.3.1
- 2. NRC Inspection and Enforcement Manuar, Part 9900: Technical Guidance, Standard Technical Specification Section 1.0 Definitions, Issue dated 12/8/96.
SUSQUEHANNA - UNIT I TRM / B 3.3-12 EFFECTIVE DATE 09/13/2005
TRM Isolation Actuation Instrumentation PPL Rev. 3 B 3.3.6 Table B 3.3.6-1 Primary Containment Isolation Valves Isolation Signal Function No.
Plant systems Valve Number Valve Description (Tabl N)
Nuclear HV-141F022A MSIV 1.a, 1.b Boiler HV-141 F022B MSIV 1.a, 1.b HV-141F022C MSIV . 1.a, 1.b HV-141F022D MSIV- 1.a, 1.b HV-141F028A MSIV 1.a, 1.b HV-141F028B MSIV 1.a, 1.b HV-141F028C MSIV 1.a, 1.b HV-141F028D MSIV 1.a, 1.b HV-141F016 MSL Drain Isolation Valve 1.a, 1.b HV-141F019 MSL Drain Isolation Valve . 1.a, 1.b Reactor HV-143F019 Reactor Coolant Sample Valve - 2.a Recirculation HV-143F020 Reactor Coolant Sample Valve - 2.a HPCI HV-155F002 HPCI Steam Supply'Valve 3.a, 3.b HV-155F003 HPCI Steam Supply Valve 3.a, 3.b HV-155F100 HPCI Steam Supply Valve 3.a, 3.b HV-155F042 HPCI Suction Valve 3.a, 3.b RCIC HV-149F007 RCIC Steam Supply Valve 4.a, 4.b HV-149F008 RCIC Steam Supply Valve 4.a, 4.b HV-149F088 . RCIC Steam Supply Valve. 4.a, 4.b RWCU HV-144F001 RWCU Suction Valve 5.a, 5.b, 5.c HV-144F004 RWCU Suction Valve 5.a, 5.b, 5.c RHR HV-151 F022 RHR - Reactor Vessel Head Spray Valve 6.a RHR HV-151 F022 RHR - Reactor Vessel Head Spray Valve 6.a HV-151 F023 RHR - Reactor Vessel Head Spray Valve 6.a HV-151 F008 RHR Shutdown Cooling Valve 6.a HV-151 F009 RHR Shutdown Cooling Valve 6.a SUSQUEHANNA - UNIT I -TRM / B 3.3-13 EFFECTIVE DATE 12/03/2004
TRM Isolation Actuation Instrumentation PPL Rev. 2 - 3.3.6 3.3 Instrumentation 3.3.6 TRM Isolation Actuation Instrumentation TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.
APPLICABILITY: As specified in Table 3.3.6-1 ACTIONS NOTES
- 1. Penetration flow paths isolated to comply with Action C may be unisolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each channel. I.
CONDITION REQUIRED ACTION l COMPLETION TIME A. One or more required All Place channel in trip. . 12.hours for channels inoperable" Function l.a and 2.a AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions l.a and 2.a B. One or more Functions with B.1 Restore isolation capability. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolation capability not maintained.
C. Required Action and C.1 Initiate appropriate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time compensatory measures for of Condition A or B not met. the degraded condition.
SUSQUEHANNA - UNIT 1 TRM / 3.3-13 EFFECTIVE DATE 09/13/2005
TRM Isolation Actuation Instrumentation PPL Rev. 2 3.3.6 TECHNICAL REQUIREMENT SURVEILLANCE NOTES'
- 1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.
SURVEILLANCE FREQUENCY.
TRS 3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.3.6.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months.
TRS 3.3.6.5 Perform LOGIC SYSTEM FUNCTIONAL TEST' 24 months TRS 3.3.6.6 Perform RESPONSE TIME TEST ' -24 months on a staggered test basis SUSQUEHANNA - UNIT 1 TRM / 3.3-14 EFFECTIVE DATE 12/14/1998*
I
TRM Isolation Actuation Instrumentation PPL Rev. 2 - - 3.3.6 TABLE 3.3.6-1 (Page 1 of 2)
PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR _
OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS VALUE
- 1. Main Steam Line Isolation
- a. Main Steam Line 1,2,3 -2 TRS 3.3.6.1 - 21 x full power Radiation - High TRS 3.3.6.2 background without TRS 3.3.6.4 hydrogen injection TRS 3.3.6.5 TRS 3.3.6.6"')
ba. Reactor Building 1,2,3 2 TRS 3.3.6.2 - S 1080 F I Main Steam Tunnel TRS 3.3.6.3 A Temperature - High TRS 3.3.6.5 cb. Turbine Building 1,2,3 2 TRS 3.3.6.2 s 200 °F I Main Steam Line TRS 3.3.6.3 Tunnel Temperature - TRS 3.3.6.5 High
- 2. Primary Containment*
Isolation
- a. Main Steam Line 1,2,3 2 TRS 3.3.6.1 s 21 x full power Radiation -- High, TRS 3.3.6.2. background without l High TRS 3.3.6.4 hydrogen injection I TRS 3.3.6.5 TRS 3.3.6.6(2)'
- 3. High Pressure Coolant Injection (HPCI) System Isolation
(a) Radiation detectors are exempt from response time testing.
SUSQUEHANNA - UNIT 1 TRM / 3.3-15 EFFECTIVE DATE 10/22/2003
TRM Isolation Actuation Instrumentation -
PPL Rev. 2 - . 3.3.6 TABLE 3.3.6-1 (Page 2 of 2)
- PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS VALUE
- 4. Reactor Core Isolation Cooling (RCIC) System Isolation
- 5. Reactor Water Cleanup (RWCU) System Isolation
- a. RWCU Penetration 1,2,3 TRS 3.3.6.2 S 72°F Area A Temperature - TRS 3.3.6.3.
High TRS 3.3.6.5
- 6. Shutdown Cooling System Isolation (a)(a) I
- a. RFIR Flow- High 3,4,5 1 TRS 3.3.6.1 5 26,000 gpm TRS 3.3.6.2 TRS 3.3.6.4 TRS 3.3.6.5 (a) Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.(a) Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.
SUSQUEHANNA'- UNIT 1 - TRM / 3.3-16 EFFECTIVE DATE 06/27/2001
Oct. 20, 2005 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2005-45494 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 10/20/2005 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 10/06/2005 ADD MANUAL TABLE OF CONTENTS DATE: 10/19/2005 CATEGORY: DOCUMENTS TYPE: TSB2 ID: TEXT 3.1.8 REMOVE: REV:0 ADD: REV: 1 CATEGORY: DOCUMENTS TYPE: TSB2 ID: TEXT LOES REMOVE: REV:63
Oct. 20, 2005 Page 2 of 2 ADD: REV: 64 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
I SSES MANUAL
- Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date: 10/19/2005 Procedure Name Rev Issue Date Change XD Change Number TEXT LOES 64 10/19/2005
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 7 04/18/2005
Title:
TABLE OF CONTENTS TEXT 2.1.1 1 10/27/2004
Title:
SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2.1.2 0 11/18/2002
Title:
SAFETY LIMITS (SLS) REACTOR COOLANT SYSTEM (RCS) PRESSURE SL TEXT 3.0 1 04/18/2005
Title:
LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY TEXT 3.1.1 1 03/24/2005
Title:
REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)
TEXT 3.1.2
. .I 11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES pI
. . I TEXT 3.1.3 07/06/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY
. - I , "I .
TEXT 3.1.4 2 07/06/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5 1 07/06/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6 2 03/24/2005
Title:
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Report Date: 10/19/05 Pagel Page 1 of of 88 Report Date: 10/19/05
SSES MANUAL Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.1.7 1 08/30/2005
Title:
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 1 10/19/2005
Title:
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 2 10/05/2005
Title:
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)
TEXT 3.2.2 1 03/24/2005
Title:
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3 0 11/18/2002
Title:
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)
TEXT 3.2.4 1 07/06/2005
Title:
POWER DISTRIBUTION LIMITS AVERAGE POWER RANGE MONITOR (APRM) GAIN AND SETPOINTS '
TEXT 3.3.1.1 2 07/06/2005
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 0 11/18/2002
Title:
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.1.3 0 11/22/2004
Title:
OPRM INSTRUMENTATION TEXT 3.3.2.1 1 02/17/2005
Title:
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION :
TEXT 3.3.2.2 0 11/18/2002
Title:
INSTRUMENTATION FEEDWATER - MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 2 07/06/2005
Title:
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION Page 2 of 8 Report Date: 10/19/05
SSES MANUAL
^ Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.3.2 1 04/18/2005
Title:
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 0 11/18/2002
Title:
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION TEXT 3.3.4.2 0 11/18/2002
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 3 07/06/2005
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/18/2002
Title:
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION "EXT 3.3.6.1 1 11/09/2004 K '
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 4.1 11/09/2004
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 0 11/18/2002
Title:
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY.(CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 1 09/02/2004
Title:
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/18/2002
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 2 11/22/2004
Title:
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM (RCS) JET PUMPS Report Date: 10/19/05 Page3 Page 3 of of 8 8 Report Date: 10/19/05
. . !'II SSES MANUAL Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL
- J1 TEXT 3.4.3 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
TEXT 3.4.4 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM'-1
- HOT SHUTDOWN TEXT 3.4.9 0 il/18/2002
Title:
REACTOR COOLANT-SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
- COLD SHUTDOWN TEXT 3.4.10 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND; TEMPERATUREP (P/T) LIMITS TEXT 3.4.11 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 2 10/05/2005
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS - OPERATING TEXT 3.5.2 0 11/18/2002
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS - SHUTDOWN TEXT 3.5.3 1 04/18/2005
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM RCIC SYSTEM 4
Page of 8 Re ort Date 10/ 9/0 Page 4 of 8 Report Date: 10/19/05
t SSES MANUAL
- Manual Name
- TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.1.1 0 11/18/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT TEXT 3.6.1.2 0 11/18/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3.6.1.3 2 08/24/2005
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
TEXT 3.6.1.4 0 11/18/2002
Title:
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 1 10/05/2005
Title:
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 0 11/18/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 o0 11/18/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 0 11/18/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 0 11/18/2002
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 0 11/18/2002
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 1 04/18/2005
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS TEXT 3.6.3.2 1 04/18/2005
Title:
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM Report Date: 10/19/05 Pages Page 5 of of 88 Report Date: 10/19/05
-T-SSES MANUAL Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Jil TEXT 3.6.3.3 0 11/18/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 3 10/05/2005
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 2 01/03/2005
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 2 11/09/2004
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 0 11/18/2002
Title:
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
TEXT 3.7.2 1 11/09/2004
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM I.
TEXT 3.7.3 0 11/18/2002
Title:
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 0 11/18/2002
Title:
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 0 11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 1 01/17/2005
Title:
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 0 11/18/2002
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.8.1 3 10/05/2005
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING Pa e 6o e o t D t : 1 / 9 0 Page 6 of 8 Report Date: 10/19/05
SSES MAN~UAL~
- Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.8.2 0 11/18/2002
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN TEXT 3.8.3. 0 11/18/2002
Title:
ELECTRICAL POWER SYST'EMS DIESEL FUEL OIL, LUBE OIL, AND STARTING AIR TEXT 3.8.4 0 11/18/2002
Title:
ELECTRICAL POWER SYST'EMS DC SOURCES - OPERATING TEXT 3.8.5 0 11/18/2002
Title:
ELECTRICAL POWER SYST'EMS DC SOURCES - SHUTDOWN TEXT 3.8.6 0 11/18/2002
Title:
ELECTRICAL POWER SYST'EMS BATTERY CELL PARAMETERS TEXT 3.8.7 1 10/05/2005
Title:
ELECTRICAL POWER SYST'EMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 '0 1l/18/2002
Title:
ELECTRICAL POWER SYST'EMS DISTRIBUTION SYSTEMS - SHUTDOWN TEXT 3.9.1 0 11/18/2002
Title:
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 0 11/18/2002
Title:
REFUELING IOPERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 0 11/18/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION TEXT 3.9.4 0 11/18/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 0 11/18/2002
Title:
REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING Pageof Reort ate 10/9/0 Page 7 of 8 Report Date: 10119105
111m SSES MANUAL II Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL J,
TEXT 3.9.7 0 11/18/2002
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 0 11/18/2002
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL TEXT 3.10.1 0 11/18/2002
Title:
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 0 11/18/2002
Title:
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 0 11/18/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 0 11/18/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN TEXT 3.10.5 o 11/18/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 0 11/18/2002
Title:
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL - REFUELING TEXT 3.10.7 1 03/24/2005
Title:
SPECIAL OPERATIONS CONTROL ROD TESTING - OPERATING TEXT 3.10.8 1 03/24/2005
Title:
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Report Date: 10/19/05 Page 8 Page8 of of 88 Report Date: 10/19/05
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision TOC Table of Contents 7 B 2.0 SAFETY LIMITS BASES Page TS / B2.0-1 1
- PageTS/B2.0-2 2 PageTS/B2.0-3 3 PageTS/B2.0-4 4 Page TS/B2.0-5 1 Pages B 2.0-6 through B 2.0-8 0 B 3.0 LCO AND SR APPLICABILITY BASES Pages B 3.0-1 through B 3.0-4 Pages TS / B3.0-5 through TS / B 3.0-7 $
< ) 0 1
Pages TS / B 3.0-8 through TS / B 3.0-9 2 Pages TS / B3.0-10 through TS / B3.0-12 I Pages TS / B 3.0-13 through TS / B3.0-15 2 Pages TS / B 3.0-16 and TS I B3.0-17 0 B 3.1 REACTIVITY CONTROL BASES Pages B 3.1-1 through B 3.1-4 0 0
Page TS / B3.1-5 1 Pages TS / B 3.1-6 and TS /B3.-7--,' 2 Pages B 3.1-8 through B3 ql'K , 0 Page TS / B 3.1-14 '-17 _
- 1 Pages B 3.1-15 throughB 34- - - . 0 Page TS/B3.1-23\,, \* 1 Pages B13.1-244froughB 31-27 0 Page TS / B3A-28 , 2 Page TS /3'M-29. ., ,. 1 Pages B'3.1V30 hrough B 3.1-33 0 Pages TS71'B 3*.1'34 through TS / B 3.1-36 .. 1 Page TS'TB3.1-37 2 Page YSTIB.3.1-38 2 (PagesB,3.1-39 through B 3.1-44 0 PgeTS /B 3.1-45 1 Pages B 3.1-46 and B 3.1-5147- 0 Pages TS / B 3.1-48 and TS / B 3.1-49 1 Page B 3.1-50 0 PageTS/B3.1-51 '
B 3.2 ' POWER DISTRIBUTION LIMITS BASES Pages TS / B 3.2-1 and TS / B3.2-2 1 Page TS/B3.2-3 3 Page TS / B 3.2-4 I Pages TS / B 3.2-5 and TS / B 3.2-6 3 PageTS/B3.2-7 2 Pages TS / B 3.2-8 and TS / B3.2-9 3 SUSQUEHANNA - UNIT 2 TS / B LOES-1 Revision 64
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.2-10 through TS I B 3.2-17 1 Page TS 3.2-18 2 Page TS /3.2-19 1 B 3.3 INSTRUMENTATION Pages TS / B 3.3-1 through TS I B 3.3-4 1 Page TS / B 3.3-5 2 PageTS/B3.3-6 1 PageTS/B3.3-7 2 Pages TS / B3.3-8 through TS / B 3.3-11 2 Page TS/B3.3-12 2 Page TS / B 3.3-13 1 Page TS / B 3.3-14 2 Pages TS I B 3.3-15 and TS I B 3.3-16 1 Pages TS/B3.3-17 and TS/B3.3-18 2 Pages TS / B 3.3-19 through TS / B 3.3-27 1 Pages TS / B 3.3-28 through TS / B 3.3-30 2 Page TS / B 3.3-31 1 Page TS / B 3.3-32 3 Page Ts B 3.3-33 2 Pages TS / B 3.3-34 through TS I B 3.3-43 1 Pages TS / B 3.3-43a though TS / B3.3-43i 0 Pages TS / B 3.3-44 through TS / B 3.3-54 2 Pages B 3.3-55 through B 3.3-63 - _ 0 Pages TS /.B..3.3-64 and.TS / B 3.3-65 2 Page TS / B3.3-66 - ; 4 Page TS / B 3.3-67 .3 Page TS / B 3.3-68 4 Pages TS / B 3.3-69 and TS / B 3.3-70 3 Pages TS / B3.3-71 3 Pages TS I B 3.3-72 through TS I B 3.3-75 . 2 PageTS/B3.3-75a . 4 Pages TS / B 3.3-75b and TS I B 3.3-75c 4 Pages B 3.3-76 through TS I B 3.3-77 r 0 Page TS / B 3.3-78 '
Pages B 3.3-79 through B 3.3-91 0 Pages TS / B 3.3-92 through TS / B 3.3-103 1 Page TS / B 3.3-104 2 Pages TS / B 3.3-105 and TS / B 3.3-106 1 Page TS / B3.3-107 2 Page TS l B 3.3-108 1 Page TS I B3.3-109 2 Pages TS I B 3.3-110 through TS I B 3.3-112 - 1 Page TS / B 3.3-113 2 PageTS/B3.3-114 1 PageTSIB3.3-115 2 Pages TS / B 3.3-116 through TS I B 3.3-118 2 Revision 64 TS/B LOES-2 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 22 TS / B LOES-2 '. Revision 64 ,
SUSQUEHANNA STEAM ELECTRIC STATION LIST OFEFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS J B 3.3-119 through TS / B 3.3-120 1 Pages TS I B 3.3-121 and TS I B 3.3-122 2 Page TS / B 3.3-123 1 Page TS J B 3.3-124 2
- Page TS / B 3.3-124a 0 Page TS / B 3.3-125 1 Page TS / B 3.3-126 2 Page TS I B 3.3-127 3 Page TS I B 3.3-128 2 Pages TS / B3.3-129 through TS / B3.3-131 1 Page TS / B 3.3-132 2 Pages TS / B 3.3-133 and TS B 3.3-134 1 Pages B 3.3-135 through B 3.3-137 0 Page TS / B 3.3-138 1 Pages B 3.3-139 through B 3.3-149 0 Pages TS/ B 3.3-150 through TS / B 3.3-162 1 Page TS / B 3.3-163 2 Pages TS / B 3.3-164 through TS I B 3.3-177 1 Page TS I B 3.3-178 2 Page TS / B 3.3-179 3 Page TS / B 3.3-179a 2 Page TS / B 3.3-180 1 PageTS/B3.3-181 - 2 Pages TS I B 3.3-182 through TS I B 3.3-186 _ 1 Pages TS I B.3.3-187 and TS i B 3.3-188 -. 2 Pages TS I B.3.3-189 through TS / B 3.3-191 1 Pages B 3.3-192 through B 3.3-205 0 Page TS / B 3.3-206 . 1 Pages B 3.3-207 through B 3.3-220 0 B 3.4 REACTOR COOLANT SYSTEM BASES Pages TS 7B 3.4-1 and TS / B 3.4-2 1 Pages TS I B 3.4-3 through TS / B 3.4-9 3 Pages B 3.4-10 through B 3.4-14 0
.Page TS /B3.4-15 1 Pages TS / B 3.4-16 and TS B 3.4-17. . 2 PageTS/B3.4-18 -.1 Pages B 3.4-19 through B 3.4-28 0 Page TS/B3.4-29 1 Pages B 3.4-30 through B 3.3-31. 0 Page TS / B 3.4-32 1 Pages B 3.4-33 through B 3.4-36 0 Page TS /B3.4-37 : 1 Pages B 3.4-38 through B 3.4-40 0 Page TS / B 3.4-41 1 Pages B 3.4-42 through B 3.4-48 0 Page TS / B 3.4-49 2 SUSQEHANA- NIT TSILOE-3 Rvisin 6 SUSQUEHANNA--UNIT2 TS / B LOES-3 Revision 64
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS / B 3.4-50 I Page TSl B 3.4-51 2 Pages TS / B 3.4-52 and TS / B 3.4-53 I Pages TS / B 3.4-54 and TS / B 3.4-55 2
- Pages TS / B 3.4-56 through TS I B 3.4-60 I B 3.5 ECCS AND RCIC BASES Pages TS / B 3.5-1 and TS B 3.5-2 Pages TS / B 3.5-3 through TS / B 3.5-6 2 Pages TS / B 3.5-7 through TS / B 3.5-10 I Page TS / B 3.5-11 2 Pages TS / B 3.5-12 through TS / B 3.5-14 I Pages TS / B 3.5-15 and TS / B.3.5-16 2 Page TS / B 3.5-17 3 Page TS / B 3.5-18 I Pages B 3.5-19 through B 3.5-24 0 Pages TS / B 3.5-25 through TS / B 3.5-27 I Pages B 3.5-28 through B 3.5-31 0 B 3.6 CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1 2 Page TS / B 3.6-1 a 3 Pages TS / B 3.6-2 through TS / B 3.6-5 2 Page TS /B 3.6-6 3 Pages TS / B.3.6-6a and TS I B 3.6-6b 2 Page TS / B 3.6-6c 0 Pages B 3.6-7 through B 3.6-14 0 PageTS/B3.6-15 3 Pages TS / B 3.6-15a and TS / B 3.6-15b 0 Page TS /B 3.6-16 Page TS / B 3.6-17 2 Page TS / B 3.6-17a 0 Pages TS / B 3.6-18 and TS B 3.6-19 1 Page TS / B 3.6-20 2 Page TS / B 3.6-21 3 Pages TS / B 3.6-21a and TS / B 3.6-21b 0 Pages TS / B 3.6-22 and TS / B 3.6-23 2 .
Pages TS I B 3.6-24 and TS / B 3.6-25 1 Page TS / B 3.6-26 2 Page TS / B 3.6-27 3 Page TS / B 3.6-28 6 Page TS / B 3.6-29 3 Page TS / B 3.6-29a Page TS / B 3.6-30 2 Page TS / B 3.6-31 3 Page TS/B3.6-32 1 Page TS/B3.6-33 2 Revision 64 UNIT 22 TSIB LOES-4 SUSQUEHANNA - UNIT TS I B LOES ' Revision 64
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS/B3.6 Pages TS / B 3.6-35 through TS I B 3.6-37 2 Page TS / B3.6-38 1 Page TS I B3.6-39 4
- Pages B 3.6-40 through B 3.6-42 0 Pages TS l B 3.6-43 and TS B 3.6-44 1 Page TS I B3.6-45 2 Pages TS I B 3.6-46 through TS I B 3.6-50 1 Page TS / B 3.6-51 2 Pages B 3.6-52 through B 3.6-62 0 Page TS / B 3.6-63 1 Pages B 3.6-64 through B 3.6-70 0 Page B 3.6-71 0 Page TS / B 3.6-72 1 Pages B 3.6-73 through B 3.6-76 0 Page TS I B 3.6-77 ;
Pages B 3.6-78 through B 3.6-82 0 Page TS I B 3.6-83 3 Pages TS / B3.6-84 and TS I B 3.6-85 2 Page TS I B 3.6-86 I Pages TS I B 3.6-87 and TS I B 3.6-87a 2 Page TS I B 3.6-88 3 Page TS I B3.6-89 . 1 Page TS / B3.3-90 - . 3 Pages TS l B.3.6-91 through TS I B3.6-95 - . 1 Page TS / B 3.6-96 - 2 Pages TS / B 3.6-97 and TS I B3.6-98 1 Page TS / B3.6-99 2 Page TS / B3.6-99a 0 Pages TS / B 3.6-100 and TS I B 3.6-101 1 Pages TS I B 3.6-102 through TS I B 3.6-104 .. 2 Pages TS I B 3.6-105 and TS I B 3.6-106 1 B 3.7 PLANT SYSTEMS BASES, Pages TS I B3.7-1 through TS i B 3.7-6 2 Page TS I B 3.7-6a 2 Pages TS / B3.7-6b and TS / B 3.7-6c 0 Page TS / B 3.7-7 2 Page TS / B 3.7-8 1 Pages B 3.7-9 through B 3.7-11 0 Pages TS / B 3.7-12 and TS / B 3.7-13 1 Pages TS / B 3.7-14 through TS / B 3.7-18 2 Page TS I B3.7-18a 0 Pages TS I B 3.7-19 through TS I B3.7-26 1 Pages B 3.7-24 through B 3.7-26 .0 Pages TS / B 3.7-27 through TS I B3.7-29 2 Page TS I B3.7-30 1 Revision 64 TSIB LOES-5 SUSQUEHANNA - UNIT UNIT 22 TS / B LOES-5 .. Revision 64
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages B 3.7-31 through B 3.7-33 0 B 3.8 ELECTRICAL POWER SYSTEMS BASES Pages B 3.8-1 through B 3.8-4 0
- Pages TS / B 3.8-5 and Page TS I B 3.8-6 1 Pages B 3.8-7 and B 3.8-8 0 PageTS l B 3.8-9 2 Pages TS / B 3.8-10 and TS / B 3.8-11 1 Pages B 3.8-12 through B 3.8-18 0 Page TS / B 3.8-19 1 Pages B 3.8-20 through B 3.8-22 0 Page TS / B 3.8-23 1 Page B 3.8-24 0 Pages TS / B 3.8-25 and TS B3.8-26 1 Pages B 3.8-27 through B 3.8-37 0 Page TS / B 3.8-38 1 Pages TS / B 3.8-39 through TS / B3.8-55 0 Pages TS / B 3.8-56 through TS / B 3.8-64 I Page TS / B 3.8-65 and Page TS / B 3.8-66 2 Pages TS / B 3.8-67 and TS / B 3.8-68 1 Page TS / B 3.8-69 2 Pages B3.8-70 through B 3.8-85 0 Page TS / B3.8-86 and TS / B 3.8-87 1 Pages B 3.8-88 through B 3.8-99 _ . 0 B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS I B 3.9-2 1 Page TS/B3.9-2a 1 Pages TS / B 3.9-3 and TS B 3.9-4 1 Pages B 3.9-5 through B 3.9-30 0 B 3.10 SPECIAL OPERATIONS BASES PageTS/B3.10-1 1 Pages B 3.10-2 through B 3.10-32 0 PageTS/B3.10-33 2 Pages B 3.10-34 through B3.10-38 0 Page TS B 3.10-39 2 TSB2LOES 9121/05 SUSQUEHANNA - UNIT 2 TS I B LOES-6 Revision 64
PPL Rev. 1 SDV Vent and Drain Valves B 3.1.8 B3.1 REACTIVITY CONTROL SYSTEMS B 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves BASES -
BACKGROUND The SDV vent and drain valves are normally open and discharge any accumulated water in the SDV to ensure that sufficient volume is available at all times to allow a complete scram. During a scram, the SDV vent and drain valves close to contain reactor water. The SDV is a volume of header piping that connects to each hydraulic control unit (HCU) and drains into an instrument volume. There are two SDVs (headers) and two instrument volumes, each receiving approximately one half of the control rod drive (CRD) discharges. The two instrument volumes are connected to a common drain line with two valves in series. Each header is connected to a common vent line with two valves in series. The header piping is sized to receive and contain all the water discharged by the CRDs during a scram. The design and functions of the SDV are described in Reference 1.
APPLICABLE The Design Basis Accident and transient analyses assume all of the SAFETY control rods are capable of scramming. The acceptance criteria for the ANALYSES SDV vent and drain valves are that they operate automatically to:
- a. Close during scram to limit the amount of reactor coolant discharged so that adequate core cooling is maintained and offsite doses remain within the limits of 10 CFR 100(Ref. 2); and
- b. Open on scram reset to maintain the SDV vent and drain path open so that there is sufficient volume to accept the reactor coolant discharged during a scram.
Isolation of the SDV can also be accomplished by manual closure of the SDV valves. Additionally, the discharge of reactor coolant to the SDV can be terminated by scram reset or closure of the HCU manual isolation valves. For a bounding leakage case, the offsite doses are well within the limits of 10 CFR 100 (Ref. 2), and adequate core cooling is maintained (Ref. 3). The SDV vent and drain valves allow continuous drainage of the SDV during normal plant operation (continued)
SUSQUEHANNA - UNIT 2 TS / B 3.1-47 Revision 0
~~. . .
PPL Rev. 1 SDV Vent and Drain Valves B 3.1.8 -
BASES APPLICABLE to ensure that the SDV has sufficient capacity to contain the reactor SAFETY coolant discharge during a full core scram. To automatically ensure this ANALYSES capacity, a reactor scram (LCO 3.3.1.1, "Reactor Protection System (RPS)
(continued) Instrumentation') is initiated if the SDV water level in the instrument volume exceeds a specified setpoint. The setpoint is chosen so that all control rods are inserted before the SDV has insufficient volume to accept a full scram.
SDV vent and drain valves satisfy Criterion 3 of the NRC Policy Statement (Ref. 4).
LCO The OPERABILITY of all SDV vent and drain valves ensures that the SDV vent and drain valves will close during a scram to contain reactor water discharged to the SDV piping. The SDV vent and drain valves are required to be open to ensure the SDV is'drained. Since the vent and drain lines are provided with two valves in series, the single failure of one valve in the open position will not impair the isolation function of the system. Additionally, the valves are required to open on scram reset to ensure that a path is available for the SDV piping to drain freely at other times.
APPLICABILITY In MODES I and 2, scram may be required; therefore, the SDV vent and drain valves must be OPERABLE. In MODES 3 and 4, control rods are not able to be withdrawn (except asT permitted by LCO 3.10.3 and LCO 3.10.4) since the reactor mode switch is in shutdown and a control rod block is applied. This provides adequate controls to ensure that only a single control rod can be withdrawn. Also, during MODE 5, only a single control rod can be withdrawn from a core cell containing fuel assemblies.
Therefore, the SDV vent and drain valves are not required to be OPERABLE in these MODES since the reactor is subcritical and only one rod may be withdrawn and subject to scram.
ACTIONS The ACTIONS table is modified by a Note I indicating that a separate I1.
Condition entry is allowed for the SDV vent line and the SDV drain line.
This is acceptable,, since the (continued)
SUSQUEHANNA - UNIT 2 TS / B 3.1-48 Revision 1
PPL Rev. I SDV Vent and Drain Valves B 3.1.8 BASES ACTIONS Required Actions for each Condition provide appropriate compensatory (continued) actions for each inoperable SDV line. Complying with the Required Actions may allow for continued operation, and subsequent inoperable SDV lines are governed by subsequent Condition entry and application of associated Required Actions.
The ACTIONS table is modified by a second note stating that a isolated line may be unisolated under administrative control to allow draining and venting of the SDV. When a line is isolated, the potential for an inadvertent scram due to high SDV level is increased. During these periods, the line maybe unisolated under administrative control. This allows any accumulated water in the line to be drained, to preclude a reactor scram on high SDV level. This is acceptable since administrative controls ensure the valve can be closed quickly, if a scram occurs with the valve open.
A.1 When one SDV vent or drain valve is inoperable in one or more lines, the associated line must be isolated to contain the reactor coolant during a scram. The 7 day Completion Time is reasonable, given the level of redundancy in the lines and the low probability of a scram occurring while the valve(s) are inoperable and the line is not isolated. The SDV is still isolable since the redundant valve in the affected line is OPERABLE. During these periods, the single failure criterion ii.not preserved, and a higher risk exists to allow reactor water out of the primary system during ascram.
B.1 If both valves in a line are inoperable, , automatic isolation capability and the ability to'contain the reactor coolant during a scram is lost. If one or both valves in a vent line or drain line is closed, the potential for an inadvertent scram due to high SDV level is increased.' Therefore, both venting and draining capability and isolation capability must be restoredthe line must be isolated to contain the reactor coolant during a scram. .
The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time to restore venting and draining capability and automatic isolation capability isolate the line is based on the low probability of a scram occurring while the line is not isolated and unlikelihood of significant CRD seal leakage.
C.1 If any Required Action and associated Completion Time is not met, the plant must be brought to a MODE in which the LCO (continued)
SUSQUEHANNA - UNIT 2 TS / B 3-1-49 Revision 1
PPL Rev. 1 SDV Vent and Drain Valves 8 3.1.8 BASES ACTIONS C.1 (continued)
- does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.1.8.1 REQUIREMENTS During normal operation, the SDV vent and drain valves'should be in the open position (except when performing SR 3.1.8.2) to allow for drainage of the SDV piping. Verifying that each valve is in the open position ensures that the SDV vent and drain valves will perform their intended functions during normal operation. This SR does not require any testing or valve manipulation; rather, it involves verification that the valves are in the correct position.
The 31 day Frequency is based on engineering judgment and is consistent with the procedural controls governing valve operation, which ensure correct valve positions.
SR 3.1.8.2 During a scram, the SDV vent and drain valves should close to contain the reactor water discharged to the SDV piping. Cycling each valve through its complete range of motion (closed and open) ensures that the valve will function properly during a scram. The 92 day Frequency is based on operating experience and takes into account the level of redundancy in the system design.
SR 3.1.8.3 SR 3.1.8.3 is an integrated test of the SDV vent and drain valves to verify total system performance. After receipt of a simulated or actual scram signal, the closure of the SDV vent and drain valves is verified. The closure time of (continued)
SUSQUEHANNA - UNIT 2 TS / B 3.1-50 Revision 0
PPL Rev. 1 SDV Vent and Drain Valves B 3.1.8 BASES SURVEILLANCE SR 3.1.8.3 (continued)
REQUIREMENTS 30 seconds after receipt of a scram signal is based on the bounding leakage case evaluated in the accident analysis based on the requirements of Reference 2. Similarly, after receipt of a simulated or actual scram reset signal, the opening of the SDV vent and drain valves is verified. The LOGIC SYSTEM FUNCTIONAL TEST in LCO 3.3.1.1 and the scram time testing of control rods in LCO 3.1.3 overlap this Surveillance to provide complete testing of the assumed safety function.
The 24 month Frequency is based on the need to perform portions of this Surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the Surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the Surveillance when performed at the 24 month Frequency; therefore, the Frequency was concluded to be acceptable from a reliability standpoint.
REFERENCES 1. FSAR, Section 4.6.
- 2. 10 CFR 100. - -
- 3. ' NUREG-0803, "Generic Safety Evaluation Report Regarding Integrity of BWR Scram System Piping," August 1981.
- 4. Final Policy Statement on Technical Specifications improvements, July 22, 1993 (58 FR 39132).
- 5. TSTF-404-A, Rev. 0.
SUSQUEHANNA - UNIT 2 TS / B3 3.1-51 Revision 1
Oct. 20, 2005 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2005-45312 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 10/20/2005 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 09/08/2005 ADD MANUAL TABLE OF CONTENTS DATE: 10/19/2005 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT 3.3.6 REMOVE: REV:1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT B3.3.6 REMOVE: REV:2
Oct. 20, 2005 Page 2 of 2 ADD: REV: 3 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES REMOVE: REV:20 ADD: REV: 21 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL
, Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 10/19/2005 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 21 10/19/2005
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 5 02/04/2005
Title:
TABLE OF CONTENTS x
TEXT 1.1 0 11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 4 05/06/2005'.<
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 0 a 1,9/2002
Title:
APPLICABILITY TECHNICAlVREQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 .0 11/19/2002 -
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) ,INSTRUMENTATION TEXT 3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 1 03 /10/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 4 04/14/2005
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
Pae1 o 5RprtDt:1/90 Page I . of 15 Report Date: 10/19/05
SSES MANUAL v,
Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 0 11/19/2002
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 0 11/19/2002
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 1 07/06/2005
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2 10/19/2005
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 0 11/19/2002
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 1 11/22/2004
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY Page 2 of 15 Report Date: 10/19/05
SSES M4ANUAL
- Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.2 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 1 12/14/2004
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.5.1 1 02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 0 11/19/2002
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0 11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN Report Date: 10/19/05 Page 33 of of 15 15 Report Date: 10/19/05
SSES MANUAL -
Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 0 11/19/2002
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 1 08/24/2005
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 2 08/18/2005
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 0 11/19/2002
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 0 11/19/2002
Title:
PLANT SYSTEMS FIRE HOSE STATIONS l:
TEXT 3.7.3.6 0 11/19/2002
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 4 09/08/2005
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION :~
TEXT 3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM TEXT 3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Page 4 of 15 Report Date: 10/19/05
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 1 03/01/2005
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 2 03/01/2005
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 0 11/19/2002
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.8.1 .2 02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 1 12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2 12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT 3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION Report Date: 10/19/05 Page 55 of of 15 15 Report Date:. 10/19/05
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2
. it TEXT 3.8.6 0 11/19/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 0 11/19/2002
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 0 11/19/2002
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION I TEXT 3.10.3 0 11/19/2002
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 0 11/19/2002
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)
TEXT 3.11.1.1 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION Report Date: 10/19/05 6
Page 6 of of 15 15 Report Date: 10/19/05
1 SSES MANUAL
. Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.2.1 2 08/24/2005
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.6 2 12/14/2004
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.4.2 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002
Title:
LOADS CONTRC)L PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL
-EXT 3.12.2 0 11/19/2002
\._.>
Title:
LOADS CONTRC)L PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTRC)L PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0 0 11/19/2002
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION ITRO) APPLICABILITY TEXT B3.1.1 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 1 03/10/2005
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE Report Date: 10/19/05 Page 7 of of 15 15 Report Date: 10119105
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 11 TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 0 11/19/2002
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 0 11/19/2002
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 1 02/04/2005
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 1 07/06/2005
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 0 11/19/2002
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK J TEXT B3.3.6 3 10/19/2005
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 0 11/19/2002
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 1 11/22/2004
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 0 11/19/2002
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION I
Page 8 of 15 Report Date: 10/19/05
IZ SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 o 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0 11/19/2002
\X>
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 0 11/19/2002
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 0 11/19/2002
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Pae9 o 5RprtDt:1/90 Page 9 of 15 Report Date: 10/19/05
'III SSES MANUAL rI Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2
. 11 TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 1 08/24/2005
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES HALON SYSTEMS IJ TEXT B3.7.3.5 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 0 11/19/2002
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1 01/12/2004
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR I
Report Date: 10/19/05 Page 10 10 of of 15 15 Report Date: 10/19/05
SSES MANUAL
. Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 1 03/01/2005
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 1 12/14/2004
Title:
PLANT SYSTEMS BASES SNUBBERS
"'EXT B3.7.9 1 12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL .STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1 1 02/04/2005
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM Report Date: 10/19/05 Page 11 Page of of 15 15 Report Date: 10/19/05
mi SSES MANUAL 0 Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 II TEXT B3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION
.. I TEXT B3.10.2 0 11/19/2002
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 0 11/19/2002
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)
TEXT B3.11.1.1 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM Report Date: 10/19/05 Page 12 12 of of 15 15 Report Date: 10/19/05
SSES MANUAL
- Manual Name
- TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002
\.-
Title:
RADIOACTIVE EFFLUENTS BASES. GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 .B3 05/20/2005
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT..MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM Report Date: 10/19/05 Page 13 13 of of 15 15 Report Date: 10/19/05
1I11E SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 3.11.1.5 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE -
FORM TEXT 3.11.2.4 -0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 1 05/20/2005
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 4.1 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION o_5Rpr Dt 1/90 Pag 14 Page 14 of 15 Report Date: 10/19/05
SSES MANUAL
- Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.3 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS TRAINING Report Date: 10/19/05 Page 15 of of 15 15 Report Date: 10/19/05
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 01/28/2005 1.0 USE AND APPLICATION Page TRM /1.0-1 08/31/1998 Page TRM /1.0-2 10/04/2002
- Page TRM /1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 .08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/12/1999 Pages TRM / 2.0-6 and TRM I 2.0-7 11/15/2004 Page TRM / 2.0-8 12/03/2004 Pages TRM / 2.0-9 through TRM 2.0-14 11/15/2004 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM I 3.0-2 04/08/1999 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 04/08/1999 3.1 REACTIVITY CONTROL SYSTENSI, -
Pages 3.1-1 through 3.1-6,- 08i31/1998 Pages TRM /3.1-7 and TRMY318~' 02/25/2005 Pages TRM /3.1-9 and 3:i-9a 02/18/1999 Page TRM /3.1-10/ :02/18/1999 3.2 CORE OPERATING"LIMITS REPORT Page 3.2-11'-\N 08/31/1998 Pages TUM 3.2-2-through TRM / 3.2-39 03/03/2005 3.3 INSTRUM ENT6TION pages TRM /,3.3-1 through TRM / 3.3-3 07/16/1999
_(Page_,/TRM 13.3-4 11/28/2000
.Pages 3.3-5 through 3.3-8' 08/31/1998 Pages'TRM / 3.3-9 and TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-10 12/17/1998 Pages TRM / 3.3-11 and TRM / 3.3-11 a 06/02/2005 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 09/13/2005 I Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 Page TRM / 3.3-16 06/27/2001 Pages TRM / 3.3-17 and TRM / 3.3-18 06/14/2002 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 11/15/2004 Pages TRM /3.3-21 a through TRM / 3.3-21d 11/1 5/2004 SUSQUEHANNA - UNIT 2 TRM I LOES-1 EFFECTIVE DATE 09/13/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / 3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 3.4 REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 -' 10/23/1998 Pages 3.4-6 through 3.4-11 08/31/1998 Page TRM / 3.4-12 12/03/2004 Page 3.4-13 08/31/1998 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 04/17/2000 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT
- Pages 3.6-1 through 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9 12/31/2002 3.7 PLANT SYSTEMS Pages TRM /3.7-1 and TRM / 3.7 07/29/1999 Page 3.7-3 .08/31/1998 Pages TRM 1.3.7-4 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM /3 .7-10 08/16/2005 Page TRM / 3.7-11 01/21/2000 Pages TRM / 3.7-12 and TRM I 3.7-13 08/02/1999 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 through TRM / 3.7-27 08/02/1999 Page TRM / 3.7-28 08/09/2005 Page TRM / 3.7-29 11/16/2001 Page TRM / 3.7-30 08/25/2005 Page TRM / 3.7-31 11/16/2001 Page TRM / 3.7-32 01/09/2004 Page TRM / 3.7-33 10/05/2002 Pages TRM / 3.7-34 through TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-39 08/31/1998 Pages TRM / 3.7-40 and TRM / 3.7-40a 02/14/2005 Pages 3.7-41 and 3.7-42 08/31/1 998 Page TRM / 3.7-43 12/03/2004 Pages 3.7-44 through 3.7-47 10/13/1998 Page TRM / 3.7-48 03/08/2003 Pages TRM / 3.7-49 and TRM / 3.7-50 03/09/2001 Page TRM / 3.7-51 '12/03/2004 Page TRM / 3.7-52 04/15/2003 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 09/13/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title* Effective Date Page TRM / 3.7-53 07/29/1999 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 and TRM /3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and TRM I 3.8-6 :04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 12/03/2004 Page TRM /3.8-11 08/10/2004 Page TRM /3.8-12 -12/03/2004 Pages 3.8-13 and 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM /3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM/ 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Pages 3.10-1 through 3.10-4 08/30/1998 Page TRM / 3.10-5 03/08/2003 Page TRM / 3.10-6 06/05/2002 Page TRM / 3.10-7 04/07/2000 Page TRM / 3.10-8 04/17/2002 3.11 RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-9 08/31/1 998 PageTRMI3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page 3.11-13 09/01/1998 Page TRM / 3.11-14 *12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998
-Pages 3.11-17 and 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages 3.11-20 and 3.11-21 08/31/1998 Page TRM / 3.11-22 04/02/2002 Pages TRM / 3.11-23 and TRM / 3.11-24 05/13/2005 Page 3.11-25 09/01/1998 Pages TRM / 3.11-26 through TRM / 3.11-28 01/21/2004 Page TRM /3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 01/21/2004 Pages 3.11-33 through 3.11-37 08/31/1998 Page TRM / 3.11-38 :12/03/2004 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 09/13/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages 3.11-39 through 3.11-44 08/31/1998 Page TRM / 3.11-45 12/03/2004 Pages 3.11-46 and 3.11-47 08/31/1998 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 09/13/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
I Title - Effective Date B 3.0 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 through TRM / B 3.0-15 03/15/2002
.B3.1 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 07/13/1999 Page B 3.1-4 08/31/1998 PageTRM/B3.1-5 02/25/2005 Pages TRM / B 3.1-6 and TRM I B 3.1-7 07/13/1999 Page TRM / B 3.1-8 02/18/1999
. B3.2 : CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Page B 3.3-2 08/31/1998 Pages TRM / B 3.3-3 and TRM / B 3.3-3A 01/31/2005 Pages TRM / B 3.3-4 through TRM / B 3.3-6 06/02/2005 Pages TRM / B 3.3-7 through TRM / B 3.3-9 03/30/2001 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 09/13/2005 12/03/2004
'I' Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a ;06/1 412002 Page TRM/ B 3.3A14b 06/1412002 Page TRM / B 3.3-15 10/22/2003 Page TRM / B 3.3-16 10/22/2003 Page TRM/ B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 11/15/2004 Pages TRM / B 3.3-19a through TRM / B 3.3.19e 11/15/2004 Pages TRM / B 3.3-20 and TRM / B 3.3-21 05/16/2003 Page TRM / B3.3-22 :10/22/2003 Page TRM / B3.3-23 05/16/2003 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 08/31/1998 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 08/31/1998 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 -08/31/1998 SUSQUEHANNA - UNIT 2 - TRM / LOES-5 UREFFECTIVE DATE 09/13/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
.1'I, Section Title Effective Date Page TRM / B 3.6-4 09/23/1999 Page TRM / B 3.6-5 '01/07/2002 Page TRM / B 3.6-6 - 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 through TRM / B 3.7-5 08/02/1999 Page TRM / B 3.7-6 08116/2005 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08102/1999 Pages TRM / B,3.7-8 through TRM / B 3.7-10 08/0211999 Page TRM / B 3.7-10a ,08/02/1999 Pages TRM / B 3.7-11 through TRM / B 3.7-14 08/02/1999 Page TRM / B 3.7-14a and TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Pages TRM / B 3.7-21 and TRM / B3.7-21a 02/14/2005 Pages TRM/B 3.7-22 and TRM/B 3.7-23 04/07/2000 Page B 3.7-24 08/31/1998 Page TRM / B 3.7-25 12/03/2004 Pages B 3.7-26 through B 3.7-30 08/31/1998 Page TRM I B 3.7-31 12/03/2004 Page TRM I B 3.7-32 03/09/2001 Page TRMI B 3.7-33 '04/15/2003 Page TRM,/ B 3.7-34. -,12/0312004 Page TRM / B 3:7-35 -07/05/2000 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM I B 3.8-2a 01/28/2005 PageTRM/B3.8-3 04/02/2002 Page TRM I B 3.8-3a 04/02/2002 Page TRM I B 3.8-4 04/02/2002 Page TRM I B 3.8-4a 08/10/2004 Page TRM I B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 '04/02/2002 Page TRM / B 3.8-17 01/28/2005 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2. ' 08/31/1998 Page TRM /B 3.10-3 '-03/08/2003 IPages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Pages TRM / B 3.10-6 and TRM / 3.10-7 04/17/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-6 ' EFFECTIVE DATE 09/13/2005
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Pages TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.1 1-11 and TRM/B 3.11-11a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 -08/31/1998 Page TRM / B 3.11-20 ,04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Pages TRM / B 3.11-21 through TRM I B 3.11-23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-28 08/31/1998 Page TRM / B 3.11-29 and TRM / B 3.11-30 12/03/2004 Pages B 3.11-31 through B 3.11-35 08/31/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 02/05/1999 TRMW text LOESA.do 9/80 SUSQUEHANNA - UNIT 2 .TRM / LOES-7 EFFECTIVE DATE 09/13/2005
TRM Isolation Actuation Instrumentation PPL Rev. 3 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES TRO The TRM Actuation instrumentation automatically initiates closure of appropriate primary containment isolation valves (PCIVs). The function of the PCIVs, in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs)
(Reference 1). The TRM Isolation Actuation Instrument has been relocated from the Technical Specifications because the identified Function is not credited in the plant design basis to mitigate any plant event, but does provide a diverse means to initiate an Isolation Actuation.
The isolation instrumentation includes the sensors, relays, and instruments that are necessary to cause initiation of primary containment and Reactor Coolant Pressure Boundary (RCPB) isolation. When the setpoint is reached, the sensor actuates, which then outputs an isolation signal to the isolation logic. Monitoring a wide range of independent parameters provides functional diversity. The input parameters to the isolation logic are:
(a) Main steam line radiation, (b) Reactor Building Main Steam Differential Temperature - High, (c) Turbine Building Main Steam Line Tunnel Temperature - High, (d) HPCI Pipe Routing Area Differential Temperature - High, (e) HPCI.Equipment Room Differential Temperature - High, -
(e RCIC Pipe Routing Area Differential Temperature - High, (g) RCIC Equipment Room Differential Temperature - High, (h) RWCU Penetration Area Differential Temperature -'Hight, (i) RWCU Pump Area Differential Temperature - High,
) RWCU Heat Exchanger Area Differential Temperature - High, and (k) RHR Flow - High.
The valves associated with these trip channels are identified in Table B 3.3.6-1.
Each of these valves is also associated with other trip channels as identified in LCO Bases B 3.6.1.3.
Functions (d)and (f) trips will occur only after a 15 minute time delay; the other trips occur after a one second delay. See Tech Spec Basis B 3.3.6-1.
(continued)
SUSQUEHANNA - UNIT 2 . TRM / B 3.3-1 0 - EFFECTIVE DATE 08/31/1998
TRM Isolation Actuation Instrumentation PPL Rev. 3 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentation BASES (continued)
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. The ACTIONS are modified by two.
Notes. Note 1 allows penetration flow path(s) to be Unisolated intermittently under administrative controls. These controls consist of stationing a dedicated operator at the controls of the valve, who is in continuous communication with the control room. In this way, the penetration can be rapidly isolated when a need for primary containment isolation is indicated. Note 2 is provided to modify the ACTIONS.
Condition C applies if the channel is not restored to OPERABLE status or placed in trip, or isolation capability is not restored, within the allowed Completion Time. If inoperable channels should not be placed in trip (e.g.,
might result in a undesirable transient) Action C may be intentionally entered as a result of not meeting Required Action A.1 in its required Completion Time.
Required Action C.1 requires appropriate compensatory measures be in place within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Examples of appropriate compensatory measures may consist of verifying that diverse isolation functions remain OPERABLE (e.g., area high temperature functions remain OPERABLE when differential temperature Functions are inoperable). Furthermore, isolating the penetration (e.g., as may be required by TS Actions for an inoperability affecting both the TRM Function and a required TS Function) also provides -adequate compensatory actions since isolating the affected penetration flow path(s) accomplishes the safety function of the inoperable channels. If it is not desired to isolate the affected penetration flow path(s) (e.g., as in the case where isolating the penetration flow path(s) could result in a reactor scram or disabling HPCI, RCIC, RWCU or RHR-SDC), alternate compensatory measures should be pursued. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is acceptable due to the fact that these Functions are not assumed in any accident or transient analysis in the FSAR.
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the TRM Isolation Actuation Instrumentation Functions are maintained OPERABLE. TRM Isolation Actuation Instrumentation Surveillances are
,performed consistent with the Bases for LCO 3.3.6.1 "Isolation Activation Instrumentation."
- (continued)
I SUSQUEHANNA - UNIT 2 TRM / B 3.3-11 EFFECTIVE DATE 09/13/2005
TRM Isolation Actuation Instrumentation PPL Rev. 3 B 3.3.6 B 3.3.6 TRM Isolation Actuation Instrumentatiori BASES (continued)
TRS 3.3.6.5 The LOGIC SYSTEM FUNCTIONAL TEST demonstrates the OPERABILITY of the required isolation logic for a specific channel: The system functional testing performed on PCIVs in LCO 3.6.1.3 overlaps this surveillance to provide complete testing of the assumed safety function. The 24 month Frequency is based on the need to perform portions of this surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the surveillance were performed with the reactor at power. Operating experience has shown these components usually pass the surveillance when performed at the 24 month Frequency.
TRS 3.3.6.6 Response time testing for the Function 1.a and Function 2.a
- 10 second requirement per FSAR Table 7.3-29 is met by testing the channel for the s 1 second channel response time requirement per FSAR Table 7.3-29 for Function 1.a.
REFERENCES 1. FSAR Section 7.3.1
- 2. -.NRC Inspection and Enforcement Manual, Part 9900: Technical
- Guidance, Standard Technical Specification Section 1.0 Definitions, Issue dated 1218/96.
SUSQUEHANNA - UNIT 2 TRM / B 3.3-12 EFFECTIVE DATE 09/13/2005
TRM Isolation Actuation Instrumentation PPL Rev. 3 B 3.3.6 Table B 3.3.6-1 Primary Containment Isolation Valves (Page I of 1)
Plant systems Valve Number Valve Description Isolation Signal Function No.
(Table 3.3.6-1)
Nuclear Boiler HV-241 F022A MSIV l.a. 1.b HV-241F022B MSIV l.a. 1.b HV-241F022C MSIV 1.a, 1.b HV-241F022D MSIV 1.a, 1.b HV-241F028A MSIV 1.a, 1.b HV-241 F028B MSIV 1.a, 1.b HV-241 F028C MSIV 1.a, 1.b HV-241F028D MSIV l.a. 1.b HV-241F016 MSL Drain Isolation Valve 1.a. 1.b HV-241F019 MSL Drain Isolation Valve 1.a, 1.b Reactor Recirculation HV-243F019 Reactor Coolant Sample Valve 2.a HV-243F020 Reactor Coolant Sample Valve 2.a HPCI HV-255F002 HPCI Steam Supply Valve 3.a, 3.b HV-255F003 HPCI Steam Supply Valve .3.a, 3.b HV-255F100 HPCI Steam Supply Valve . 3.a, 3.b HV-255F042 HPCI Suction Valve 3.a, 3.b RCIC HV-249F007 RCIC Steam Supply Valve 4.a, 4.b HV-249F007 RCIC Steam Supply Valve - 4.a, 4.b HV-249F088 RCIC Steam Supply Valve 4.a, 4.b RWCU HV-244F088 RWCU Suction Valve 5.a, 5.b, 5.c HV-244FOO4 RWCU Suction Valve 5.a, 5.b, 5.c RHR HV-251 F022 RHR - Reactor Vessel Head Spray Valve 6. b HV-251 F023 RHR - Reactor Vessel Head Spray Valve 6.a HV-251F038 RHR - Shutdown Cooling Valve 6.a HV-251 F009 HV25 F00 RHR --IhtonCoin IH Shutdown Cooling Valve av 6.a Il SUSQUEHANNA - UNIT 2 TRM / B 3.3-13 .3EFFECTIVE DATE 12/03/2004
- I - - --- .......
TRM Isolation Actuation Instrumentation PPL Rev. 2 3.3.6 3.3 Instrumentation 3.3.6 TRM Isolation Actuation Instrumentation TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.
APPLICABILITY: As specified in Table 3.3.6-1 ACTIONS elIATI
-[Mt~ I I Jo ---- ____
- 1. Penetration flow paths isolated to comply with Action C may be unisolated intermittently under administrative controls. I'
- 1. 2. Separate Condition entry is allowed for each channel. I CONDITION REQUIRED ACTION -COMPLETION TIME A. One or more required . A.1 Place channel in trip. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable - - Function 1.a and AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 1.a and 2.a B. One or more Functions with B.1 Restore isolation capability. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolation capability not maintained.
C. Required Action and C.1 Initiate appropriate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion compensatory measures for Time of Condition A or B the degraded condition.
not met.
SUSQUEHANNA - UNIT 2 ITRM / 3.3-13 EFFECTIVE DATE 09/13/2005
TRM Isolation Actuation Instrumentation PPLRev.2 3.3.6 TECHNICAL REQUIREMENT SURVEILLANCE
- NOTES-----E-
- 1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.
SURVEILLANCE FREQUENCY TRS -3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.3.6.2 PerformCHANNELFUNCTIONALTEST 92 days TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.6.5 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months TRS 3.3.6.6 Perform RESPONSE TIME TEST - 24 months on a staggered test
- . . -basis SUSQUEHANNA - UNIT 2 TRM / 3.3-14 EFFECTIVE DATE 12/14/1998
TRM Isolation Actuation Instrumentation PPL Rev. 2 3.3.6 TABLE 3.3.6-1 (Page 1 of 2)
PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS ALLOWABLE VALUE
- 1. Main Steam Line Isolation ba. Reactor Building 1,2,3 2 TRS 3.3.6.2 : 108OF Main Steam Tunnel - TRS 3.3.6.3 A Temperature - TRS 3.3.6.5 High cb. Turbine Building 1,2,3 2 TRS 3.3.6.2 . 2000 F Main Steam Line TRS 3.3.6.3 Tunnel Temperature TRS 3.3.6.5.
- High
- 2. Primary Containment Isolation
- a. Main Steam Line 1.2.3 2 TRS 3.3.6.1
- hydrogen injection
.TRS 3.3.6.5'
- 3. High Pressure Coolant Injection (HPCI) System Isolation
- High TRS 3.3.6.5
') Radiation detectors are exempt from response time testing.
SUSQUEHANNA - UNIT 2 TRM / 3.3-15 EFFECTIVE DATE 10/22/2003
TRM Isolation Actuation Instrumentation PPL Rev. 2 3.3.6 TABLE 3.3.6-1 (Page 2 of 2)
PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS ALLOWABLE VALUE
- 4. Reactor Core Isolation Cooling (RCIC) System Isolation
- a. RCIC Pipe 1,2,3 . 1 TRS 3.3.6.2 - 980 F Routing Area TRS 3.3.6.3 A Temperature - TRS 3.3.6.5 High
- 5. Reactor Water Cleanup (RWCU) System Isolation
- a. RWCU 1,2,3 : TRS 3.3.6.2 s 720 F Penetration Area . TRS-3.3.6.3 A Temperature - , TRS 3.3.6.5 High
- 6. Shutdown Cooling System Isolation (a)
TRS 3.3.6.1
- a. RHR Flow- High 3,4,5 1 TRS 3.3.6.2 s 26,000 gpm TRS 3.3.6.4 TRS 3.3.6.5 (a) Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.
SUSQUEHANNA - UNIT 2 TRM / 3.3-16 EFFECTIVE DATE 6/27/2001