NL-05-0937, Units 1 and 2, Requests for Exemption/Amendment from Fire Protection Requirements at Farley Nuclear Plant
ML051640368 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 06/09/2005 |
From: | Stinson L Southern Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
NL-05-0937 ER 04-040 | |
Download: ML051640368 (7) | |
Similar Documents at Farley | |
---|---|
Category:Exemption from NRC Requirements
MONTHYEARML24044A0732024-02-28028 February 2024
[Table view]Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - January 2024 ML24010A0032024-01-30030 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML21179A1762021-08-0505 August 2021 FRN for Issuance of Exemption - Farley and Vogtle FSAR Update Exemption - Rev 1 ML21179A1852021-08-0404 August 2021 Exemption - Farley and Vogtle - FSAR Update Exemption - Rev 1 ML21179A2042021-08-0404 August 2021 LTR - Farley and Vogtle - Exemption Transmittal Letter - FSAR Update Exemption - Rev 1. Exemptions from the Requirements of 10 CFR Part 50, Section 50.71(e)(4), Final Safety Analysis Report Update Schedule NL-21-0543, Units 1 and 2 and Vogtle Electric Generating Plant - Units 1 and 2, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2021-06-0909 June 2021 Units 1 and 2 and Vogtle Electric Generating Plant - Units 1 and 2, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20315A3742020-12-0404 December 2020 Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel Subsection VI C.3(I)(1) (EPID L-2020-LLE-0183 (COVID-19)) ML20295A5022020-11-10010 November 2020 Temporary Exemption from Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0148 (COVID-19)) NL-20-1254, Request for One-Time Exemptions from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 Pandemic2020-11-0606 November 2020 Request for One-Time Exemptions from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 Pandemic ML20243A0002020-09-23023 September 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for August 2020 ML20220A6732020-08-18018 August 2020 Exemption Request from Certain Requirements of 10 CFR Part 73,Appendix B, General Criteria for Security Personnel, Section VI (EPIDs L-2020-LLE-0131/0132) ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 ML20147A1712020-06-0202 June 2020 Exemption Request from Requirements of NFPA-805 Section 3.4.3(c)(1), Related to Quarterly Fire Brigade Drills NL-20-0620, SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation2020-05-22022 May 2020 SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation NL-19-0801, Quality Assurance Topical Report Submittal, Request for Schedular Exemption - 10 CFR 50.54(a)(3)2019-10-31031 October 2019 Quality Assurance Topical Report Submittal, Request for Schedular Exemption - 10 CFR 50.54(a)(3) ML16179A4102016-08-0404 August 2016 Southern Nuclear Operating Company Exemption from NRC Requirements: Use of Optimized Zirlo Fuel Rod Cladding Material for Joseph M. Farley Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 2 NRC-2016-0169, Southern Nuclear Operating Company Exemption from NRC Requirements: Use of Optimized Zirlo Fuel Rod Cladding Material for Joseph M. Farley Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 22016-08-0404 August 2016 Southern Nuclear Operating Company Exemption from NRC Requirements: Use of Optimized Zirlo Fuel Rod Cladding Material for Joseph M. Farley Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 2 NL-10-1795, Request for Exemption from 10 CFR 73.55(a)(1) Compliance Date -Environmental Assessment2010-09-10010 September 2010 Request for Exemption from 10 CFR 73.55(a)(1) Compliance Date -Environmental Assessment ML0921703672009-08-27027 August 2009 Exemption from the Requirements of 10 CFR Part 73, Section 73.55 ML0923803292009-07-31031 July 2009 Enclosure 4 to Southern Nuclear Operating Company Letter Dated July 31, 2009, Non-Proprietary Version of Enclosure 1 NL-09-1134, Enclosure 4 to Southern Nuclear Operating Company Letter Dated July 31, 2009, Non-Proprietary Version of Enclosure 12009-07-31031 July 2009 Enclosure 4 to Southern Nuclear Operating Company Letter Dated July 31, 2009, Non-Proprietary Version of Enclosure 1 ML0602003622006-03-22022 March 2006 Exemption, Fire Rated Electrical Cable NL-05-0937, Units 1 and 2, Requests for Exemption/Amendment from Fire Protection Requirements at Farley Nuclear Plant2005-06-0909 June 2005 Units 1 and 2, Requests for Exemption/Amendment from Fire Protection Requirements at Farley Nuclear Plant NL-05-0883, Request for Exemption from 10 CFR 72.212(a)(2) and 10 CFR 72.2142005-05-20020 May 2005 Request for Exemption from 10 CFR 72.212(a)(2) and 10 CFR 72.214 ML0502504302005-04-13013 April 2005 EA, Exemption from 10 CFR Part 50, Appendix E, Section IV.F.2.b & C ML0505301342005-04-0606 April 2005 Southern Nuclear Operating Co. (Hatch, Farley & Vogtle), Enclosure, EOF Relocation NL-04-2181, Joseph M. Farley Nuclear Plant, Request for Exemption from 10 CFR 72.124(c) - Criticality Monitors2005-01-19019 January 2005 Joseph M. Farley Nuclear Plant, Request for Exemption from 10 CFR 72.124(c) - Criticality Monitors 2024-02-28 Category:Letter type:NL MONTHYEARNL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024
[Table view]Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 NL-24-0003, Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R312024-02-16016 February 2024 Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31 NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0828, Main Steam Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpolnt Drift2023-11-30030 November 2023 Main Steam Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpolnt Drift NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application 2024-09-04 Category:Report MONTHYEARNL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024
[Table view]RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 ML21214A3182021-08-0202 August 2021 301 Comments NL-20-0713, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-21021 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic NL-20-0034, Inservice Inspection Program Owner'S Activity Report for Outage 1R292020-01-17017 January 2020 Inservice Inspection Program Owner'S Activity Report for Outage 1R29 NL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-09-30030 September 2019 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 NL-19-0795, Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1.2019-05-31031 May 2019 Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1. NL-17-1713, Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure2018-04-0606 April 2018 Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B2017-12-14014 December 2017 Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B NL-17-1401, Post Accident Monitoring Report for 8 Train RVLIS2017-08-10010 August 2017 Post Accident Monitoring Report for 8 Train RVLIS NL-16-2541, Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results2016-11-29029 November 2016 Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results NL-16-0810, Submittal of Post Accident Monitoring Report2016-06-0909 June 2016 Submittal of Post Accident Monitoring Report NL-16-0683, Special Report No. 2016-002-00, Alternate AC Source Out of Service2016-06-0202 June 2016 Special Report No. 2016-002-00, Alternate AC Source Out of Service NL-16-0751, Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C2016-05-23023 May 2016 Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C ML16103A5732016-04-21021 April 2016 Final ASP Analysis (LER 364-14-002) ML16103A5722016-04-21021 April 2016 Transmittal of Final Farley Nuclear Plant Unit 2, Accident Sequence Precursor Analysis ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20142015-12-23023 December 2015 Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 NL-15-1489, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-12082015-08-17017 August 2015 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-1208 ML15226A2292015-07-31031 July 2015 PWR Vessel Internals Program Plan for Aging Management of Reactor Internals NL-15-1507, J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals2015-07-31031 July 2015 J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals ML15182A1752015-06-26026 June 2015 Completion of Required Action by NRC Order EA-12-051 Reliable Spent Fuel Pool Level Instrumentation ML15106A3102015-04-17017 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing Analysis NL-15-0418, Revision 6, Pressure Temperature Limits Reports2015-03-0505 March 2015 Revision 6, Pressure Temperature Limits Reports NL-15-0080, Special Report 2015-001-002015-01-26026 January 2015 Special Report 2015-001-00 NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20132014-12-0808 December 2014 Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 NL-14-1109, Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2014-08-26026 August 2014 Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) ML14128A0832014-06-0303 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 ML14098A4752014-04-16016 April 2014 Unit 1 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14101A1192014-04-16016 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-0342, Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites2014-03-31031 March 2014 Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 62014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 6 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 2172014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 217 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 562 ML14051A7342014-02-20020 February 2014 Updated Seismic Recommendation 2.3 Walkdown Report NL-14-0249, Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 22014-02-20020 February 2014 Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 2 ML14071A0622014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 1 of 562 Through 46 of 562 ML14071A0632014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 107 of 217 Through Attachment 8 Through End ML14071A0642014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 47 of 562 Through 90 of 562 ML14071A0652014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 91 of 562 Through 125 of 562 ML14071A0662014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 126 of 562 Through 160 of 562 ML14071A0692014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 562 ML14071A0702014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 562 ML14071A0762014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 2024-06-14 Category:Miscellaneous MONTHYEARNL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024
[Table view]RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML21214A3182021-08-0202 August 2021 301 Comments NL-20-0034, Inservice Inspection Program Owner'S Activity Report for Outage 1R292020-01-17017 January 2020 Inservice Inspection Program Owner'S Activity Report for Outage 1R29 NL-17-1713, Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure2018-04-0606 April 2018 Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B2017-12-14014 December 2017 Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B NL-16-2541, Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results2016-11-29029 November 2016 Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results NL-16-0810, Submittal of Post Accident Monitoring Report2016-06-0909 June 2016 Submittal of Post Accident Monitoring Report NL-16-0683, Special Report No. 2016-002-00, Alternate AC Source Out of Service2016-06-0202 June 2016 Special Report No. 2016-002-00, Alternate AC Source Out of Service NL-16-0751, Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C2016-05-23023 May 2016 Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20142015-12-23023 December 2015 Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 NL-15-1489, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-12082015-08-17017 August 2015 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-1208 ML15182A1752015-06-26026 June 2015 Completion of Required Action by NRC Order EA-12-051 Reliable Spent Fuel Pool Level Instrumentation ML15106A3102015-04-17017 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing Analysis NL-15-0418, Revision 6, Pressure Temperature Limits Reports2015-03-0505 March 2015 Revision 6, Pressure Temperature Limits Reports NL-15-0080, Special Report 2015-001-002015-01-26026 January 2015 Special Report 2015-001-00 NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20132014-12-0808 December 2014 Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 NL-14-1109, Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2014-08-26026 August 2014 Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) ML14128A0832014-06-0303 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 ML14101A1192014-04-16016 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-0145, Proposed Alternative for the Fourth Lnterval Lnservice Inspection (FNP-ISI-ALT-14, Version 1.0)2014-02-18018 February 2014 Proposed Alternative for the Fourth Lnterval Lnservice Inspection (FNP-ISI-ALT-14, Version 1.0) NL-13-1936, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B2013-09-30030 September 2013 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B NL-13-0954, Proposed Path to Closure of Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance.2013-05-16016 May 2013 Proposed Path to Closure of Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance. NL-13-0171, Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation.2013-02-27027 February 2013 Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation. ML12355A7862012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 331 of 561 - Page 373 of 561 ML12355A7872012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 374 of 561 - Page 415 of 561 ML12355A7852012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 284 of 561 - Page 330 of 561 ML12355A7842012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 234 of 561 - Page 283 of 561 ML12355A7832012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 184 of 561 - Page 233 of 561 ML12355A7822012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 141 of 561 - Page 183 of 561 ML12355A7812012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 104 of 561 - Page 140 of 561 ML12355A7802012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 103 of 561 NL-12-2266, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 5612012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 561 ML13004A2632012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4, Page 130 of 143 Through End NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 71 of 161 - Pag2012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 71 of 161 - Page NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 1 of 161 - Page2012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 1 of 161 - Page 7 NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 12012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 103 NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 5612012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 561 NL-12-2267, SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 46 of 462012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 46 of 46 ML13004A2612012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 431 of 467 Through Attachment 4, Page 63 of 143 ML13004A2602012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 373 of 467 Through Attachment 3, Page 431 of 467 ML13004A2582012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 307 of 467 Through Attachment 3, Page 372 of 467 ML13004A2572012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 232 of 467 Through Attachment 3, Page 306 of 467 ML13004A2562012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 177 of 467 Through Attachment 3, Page 231 of 467 ML13004A2552012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 123 of 467 Through Attachment 3, Page 176 of 467 ML13004A2542012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 58 of 467 Through Attachment 3, Page 122 of 467 ML13004A2532012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 1, Page 1 of 26 Through Attachment 3, Page 57 of 467 ML13004A2622012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4, Page 64 of 143 Through Page 129 of 143 ML12355A7952012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 118 of 161 - End 2024-06-14 |
Text
L M.Stinson (Mike) Southern Nuclear Vice President Operating Company. Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5181 Fax 205.992.0341 i SOUTHERNAM COMPANY June 9, 2005 EnergytoServeYourWorld' Docket Nos.: 50-348 NL-05-0937 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Joseph M. Farley Nuclear Plant - Units I and 2 Requests for Exemption/Amendment from Fire Protection Requirements at Farley Nuclear Plant Ladies and Gentlemen:
In letters dated January 19, 2005, Southern Nuclear Operating Company (SNC) requested an exemption for Joseph M. Farley Nuclear Plant (FNP) Unit I from 10 CFR Appendix R Section III.G.2 and an amendment for FNP Unit 2 to use fire rated electrical cable which has been demonstrated to provide an equivalent level of protection as would be provided by a one hour rated electrical cable raceway fire barrier enclosure as described by 10 CFR 50, Appendix R, Section III.G.2 for protection of safe shutdown control circuits located in FNP fire areas 1-0 13, 1-042, 2-013, and 2-042.
During telecoms with the NRC and with Meggitt Safety Systems Inc., the proprietary nature of the Meggitt Safety Systems Inc. Test Report was discussed. Subsequently, it has been determined that the test report could be designated as non-proprietary.
The purpose of this letter is to replace the proprietary-marked Meggitt Safety Systems Inc.
Test Report (Document ER 04-040 Revision B), which was included as part of the two January 19, 2005 SNC requests, with a non-proprietary version (Document ER 04-040 Revision C) of same report. The reports are identical except that the report included with this letter is non-proprietary. The affidavit regarding proprietary information, submitted in the January 19, 2005 letters, is no longer needed and the affidavit is withdrawn.
As stated in the January 19, 2005 letters, SNC requests NRC approval of the Unit I exemption and the Unit 2 amendment by January 21, 2006.
(Affirmation and signature provided on the following page)
U. S. Nuclear Regulatory Commission NL-05-0937 Page 2 Mr. L. M. Stinson states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and to the best of his knowledge and belief, the facts set forth in this letter are true.
This letter contains no NRC commitments. If you have any questions, please advise.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY L. M. Stinson S o to and subscribedbefore me this 9C days of tien , 2005.
Notary Public A 13 confilission expires: -- TARtY PUC STATE OFALABAMA ATLA=
-MYCOMMISSION EXPIRES: June 10, 2008 S/j
'--,-LM sls/dl 3BODED TnRU NOTARY nMUC UNDERWrERS
'En'cliosure: Meggitt Safety Systems, Inc. Fire Test Report ER 04-040, Revision C cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, General Manager - Plant Farley RTYPE: CFA04.054; LC# 14278 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Farley Mr. C. A. Patterson, Senior Resident Inspector - Farley
Joseph M. Farley Nuclear Plant - Units 1 and 2 Request for Exemption/Amendment from Fire Protection Requirements at Farlev Nuclear Plant Enclosure Meggitt Safety Systems, Inc. Fire Test Report ER 04-040, Revision C
MEGGITT W
MEGGITT SAFETY SYSTEMS INC ENGINEERING DEPARTMENT DOCUMENT ER 04-040 TITLE APPENDIX R, ONE-HOUR FIRE RESISTIVE, MINERAL INSULATED CONTROL CABLE FIRE TEST REPORT FOR SOUTHERN NUCLEAR OPERATING COMPANY, INC.
______APPROVALS APPROVALS l ~CONTROLLED DISTRIBUTIONjj l l l l l l PREPARED: ENG: QA: SIZE CAGE CODE: ER 04040 A. Lutersteln 7130104 Vahid Badii 7130104 G.Griffis 7/301D4 A 25693 MFG: CHECKED NA Ark Nembov 7/30/04 REV. C SHEET I of 4
REV. DATE DESCRIPTION APPROVALS A 040730 INITIAL RELEASE AL VB B 040813 Revised per ECO 04-887 AL VB C OmiZ Revised per ECO 05-363 SIZE CAGE CODE A l25693 ER 04-040 REV I C SHEET 2 OF 4
1.0 OBJECTIVE The objective of this program is to validate the fire performance of Meggitt Safety Systems Inc.
(MSSI) silicone dioxide insulated 8 conductor #12 AWG cable with factory splice and cable support for use In nuclear power facilities.
The MSSI cable P/N 300283-5 was subjected to a one-hour ASTM E-1 19 fire exposure followed by a hose stream test in accordance with US NRC Generic Letter 86-10 Supplement
- 1. The cable insulation resistance and cable conductor resistance were monitored during the test.
2.0 TEST RESULTS The test results presented In Appendix A demonstrate that cable and support performances meet the acceptance criteria specified in the Appendix R One-hour Fire test Plan, ER 04-029 (AREVA Document No. 51-5045887-01).
The Omega Point Laboratories Test Report (Project No. 14980-119368, Revision 1) attached in Appendix A includes Revision A of the document ER 04-033 in Appendix D" Quality Assurance'.
The document ER 04-033, Revision C, " Unpacking, Inspection, Installation and Standard Practices for 8/C #12 AWG Si 2400 Fire Rated Cable for J.M. Farley Nuclear Power Plant", is the version approved for installation of the Ml cables for Southern Nuclear Operating Company project. The test specimen installed configuration for the fire test conformed to the details in ER 04-033, Revision C.
3.0 CONCLUSION
The MSSI 8 conductor #12 AWG Appendix R control cable is certified to be Implemented by design change packages (DCPS 03-1-9901, 03-1-9902, and 03-2-9906) at Farley Nuclear Plant (FNP).
ER 04040 SHEET 3 OF 4
APPENDIX A Appendix R, One-Our Fire Resistive Control Cable Test Report (132 pages)
"119368 Revi Reportpdf' SIZE CAGE CODE 1 A 25693 jER 04-040 REV C SHEET 4 OF 4