ML13004A253

From kanterella
Jump to navigation Jump to search
SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 1, Page 1 of 26 Through Attachment 3, Page 57 of 467
ML13004A253
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/26/2012
From: Miktus P
Southern Nuclear Operating Co, Southern Co
To:
Office of Nuclear Reactor Regulation
References
NL-12-2267 SNCF164-RPT-02, Ver. 1.0
Download: ML13004A253 (86)


Text

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 1 UNIT 2- SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02 Equipment List Pages Unit 2 - Base List 1 2-16 Unit 2 - SWEL 1 17-21 Unit 2 - Base List 2 22-23 Unit 2 - SWEL 2 24-26 Page 1 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 1 SEISMIC WALKDOWN EQUIPMENT LISTS UNIT 2 - BASE LIST 1 NO. SNCF164-RPT-02 Equipment List Pages Unit 2 - Base List 1 2-16 Unit 2 - SWEL 1 17-21 Unit 2 - Base List 2 22-23 Unit 2 - SWEL 2 24-26 Page 2 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 1 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2 LINE NO. SYSTEM/EQUIPMENT CLASS MARK NO. DESCRIPTION BUILDING ELEV ROOM (1) (2) (3) (4) (5) (6) (7) 20 A2TBOO1 TERMINAL BOX AB 100-00 2189 20 A2TBO04 TERMINAL BOX AB 100-00 2194 20 A2T8006 TERMINAL BOX AB 121-00 2223 20 B2TB002 TERMINAL BOX AB 121-00 2235 20 B2TB003 TERMINAL BOX AB 100-00 2190 20 B2TBO04 TERMINAL BOX AB 100-00 2192 18 NZE21LI0112-3 VCT LEVEL INDICATION AB 121-00 2218 20 N2H11NGMCB2500A-AB MAIN CONTROL BOARD SECTION A AB 155-00 0401 07 N2P18PCV28B5A PRESSURE CONTROL VALVE AB 100-00 2189 07 N2P18PCV28858 PRESSURE CONTROL VALVE AB 100-00 2189 07 N2P18PCV2885C PRESSURE CONTROL VALVE AB 100-00 2189 07 N2P19PCV2228A PCV TO PORV BACKUP AIR SUPPLY BOTTLE AB 121-00 2218 07 N2P19PCV2228B PCV TO PORV BACKUP AIR SUPPLY PRESSURE AS 121-00 2218 CONTROL 00 Q2BIIHOO1 REACTOR VESSEL CS 129-00 CT4T 00 Q2821HOO1A STEAM GENERATOR 2A CB 104-00 CThT 00 Q2B21HOOIB STEAM GENERATOR 2B CB 104-00 C1NT 00 Q2B21HOO1C STEAM GENERATOR 2C CS 104-00 CThT 18 Q2B21PTO402-P1 RCS LOOP 3 WIDE RANGE PRESSURE CS 110-00 CThT 18 Q2B21PT0403-P4 RCS LOOP I WIDE RANGE PRESSURE CS 110-00 CT1T 19 Q2B21TEO410-P2 RCS LOOP 1 COLD LEG RTD CB 123-00 CTMi 19 Q2821TE0413-P1 RCS LOOP 1 HOT LEG RTD CB 123-00 CTNT 19 Q2621TE0420-P2 RCS LOOP 2 COLD LEG RTD CS 123-00 CTNT 19 Q2B21TE0423-P1 RCS LOOP 2 HOT LEG RTD CB 123-00 CTNT 19 Q2B21TE0430-P4 RCS LOOP 3 COLD LEG RTD CB 123-00 CTNT 19 Q2B21TE0433-P3 RCS LOOP 3 HOT LEG RTD CB 123-00 CT4T 07 Q2B31HV8028-A PRESSURE RELIEF TANK ISOLATION OUTSIDE AB 121-00 2223 CTNT VALVE 33 Q2B31KO01 RCS PRESSURIZER CB 155-00 CTNT 18 Q2B31LT0459-P1 PRESSURIZER LEVEL (CONTROL ROOM) CB 129-00 CTMT 18 Q2831LT0460-P2 PRESSURIZER LEVEL CB 129-00 CTNT Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name & Version: SSEM vO.O Page 3 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 2 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2 LINE SYSTEM/EQUIPMENT NO. CLASS MARK NO. DESCRIPTION BUILDING ELEV ROOM 0m080n00Sf:lfl= ========(5) (6) (7 cc==== accum== s=in mobSO~bC=f.m........==.=

(5) (6) (7)

(1) (2) (3) (4) 18 Q2B31LT0461-P3 PRESSURIZER LEVEL CB 129-00 CT4T Q2B311MOV80D0A-A PRESSURIZER POWER RELIEF ISOLATION VALVE CB 175-00 CTNT 0SA Q28311NOVSOOOB-8 PRESSURIZER POWER RELIEF ISOLATION VALVE CB 175-00 CTmT 07 Q2B31PCV044418-B PRESSURIZER POWER RELIEF VALVE CB 155-00 CTMT 07 Q2831PCV0445A-A PRESSURIZER POWER RELIEF VALVE C8 173-00 CThT 18 Q2831PT0455-Pl PRESSURIZER PRESSURE CB 129-00 CTNT 18 Q2B31PT0456-P2 PRESSURIZER PRESSURE CB 129-00 CTMIT 18 Q2B31PTO457-P3 PRESSURIZER PRESSURE CB 129-00 CTMT 02 Q2CI11EOO4A-AB REACTOR TRIP SWITCHGEAR NO. 1 AS 121-00 2235 02 Q2CI1EOO4B-AB REACTOR TRIP SWITCHGEAR NO. 2 AS 121-00 2235 18 Q2C22LT0474-P1 STEAM GENERATOR 2A NARROW RANGE LEVEL CB 155-00 CTNT 18 Q2C22LT0475-P2 STEAM GENERATOR 2A NARROW RANGE LEVEL CB 155-00 CThT 18 Q2C22LT0476-P3 STEAM GENERATOR 2A NARROW RANGE LEVEL CB 155-00 CTNT 18 Q2C22LT0484-P1 STEAM GENERATOR 2B NARROW RANGE LEVEL CB 155-00 CThT e ',... 18 02C22LT0485-P2 STEAM GENERATOR 2B NARROW RANGE LEVEL CB 155-00 CTNT 18 Q2C22LT0486-P3 STEAM GENERATOR 2B NARROW RANGE LEVEL CB 155-00 CTINT 18 Q2C22LT0494-P1 STEAM GENERATOR 2C NARROW RANGE LEVEL CB 155-00 CINT is Q2C22T0495-P2 STEM GENERATOR 2C NARROW RANGE LEVEL CB 155-00 CTMT 18 Q2C22LTO496-P3 STEAM GENERATOR 2C NARROW RANGE LEVEL CB 155-00 CTNT 20 Q2C51LOO1B-1 NIS NEUTRON DETECTOR BOX IB CB 129-00 CTNT 00 Q2C55NE0048-A ALTERNATE SHUTDOWN NEUTRON FLUX DETECTOR CB 112-00 CThT 18 Q2C55NM004S-A ALTERN SHUTDOWN NEUTRON FLUX MON SIGNAL AB 139-00 2332 AMPLIFIER 08A Q2E11FCVO6O2A-A RHR PUMP HINI FLOW VALVE AS 77-00 2128 GSA Q2EI1FCVO602B-B RHR PUMP MINI FLOW VALVE AS 77-00 2122 18 Q2E11FIS6O2A-A RHR PUMP FLOW INDICATING SWITCH AS 83-00 2128 18 Q2E11FIS6O2B-B RHR PUMP FLOW INDICATING SWITCH AS 83-00 2128 18 Q2E1 IFTO6O5A- 2 RHR HEAT EXCHANGER DISCHARGE FLOW As 83-00 2120 TRANSMITTER 18 Q2E1IFTO605B-4 RHR HEAT EXCHANGER DISCHARGE FLOW AB 83-00 2120 TRANSMITTER Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2NASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name & Version: SSEM vO.0 Page 4 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 3 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2 LINE SYSTEM/EQUIPMENT NO. CLASS MARK NO. DESCRIPTION BUILDING ELEV ROOM n.oqe a.=cnaw. .fflfw .-.......

tSwo fafnm..a..... oau..... *coca.......fbbb...fbb CCC 00l0 S wwou"l==

(1) (2) (3) (4) (5) (6) (7) 21 Q2ElIH0O1A-A RHR HEAT EXCHANGER 2A AD 83-00 2128 21 Q2EllHOOIB-B RHR HEAT EXCHANGER 2B AD 83-00 2128 18 Q2E11LQ3594A-A CTMT SUMP LEVEL TRANSMITTER POWER SUPPLY AB 139-00 2318 18 Q2EU1LQ35948-B CT14T SUMP LEVEL TRANSMITTER AS 139:00 2318 18 Q2E11LT3594A-A CT1T SUMP LEVEL TRANSMITTER CO 080-00 CTNT 18 Q2EI1LT35948-B CTNT SUMP LEVEL TRANSMITTER CB 080-00 CTMT 08A Q2E1lNOVS701A-A RHR INLET ISOLATION VALVE CB 105-00 CTMT 08A Q2ElMOV8701B-B RHR INLET ISOLATION VALVE CB 105-00 CT"T O0A Q2E1IMOV8702A-A RHR INLET ISOLATION VALVE CB 105-00 CTMT O0A Q2E11MOV8702B-B RHR INLET ISOLATION VALVE CB 105-00 INS OA Q2EI11OV8706A-A RHR LOOP NO. 1 DISCHARGE TO CVCS AD 83-00 2128 08A Q2E1IMOVe706B-8 RHR LOOP NO. 2 DISCHARGE TO CVCS AB 83-00 2128 08A Q2E11MOV8809A-A RWST TO RHR PUMP 2A SUCTION AS 77-00 2131 O0A Q2EI1MOV88O9B-B RWST TO RHR PUMP 2B SUCTION AD 77-00 2129 08A Q2EI1NOV8811A-A, RHR PUMP SUCTION FROM CONTAINMENT TRAIN A AD 77-00 2131 O0A Q2EIIMOV8SIIB-B RHR PUMP SUCTION FROM CONTAINMENT TRAIN B AS 77-00 2129 08A Q2El1MOV8812A-A CONTAINMENT SUMP TO RHR PUMP 2A ISOLATION AD 77-00 2131 neA Q2E1uMOV812B-B CONTAINMENT SUMP TO RMR PUMP 2B ISOLATION AD 77-00 2129 08A Q2E11MOV8888A-A LHSI TO RCS COLD LEG AD 121-00 2223 O0A Q2EI1MOV88SSB-B LHSI TO RCS COLD LEG AS 121-00 2223 06 Q2E11POOtA-A RHR PUMP 2A AS 83-00 2131 06 Q2E1IPOO1B-B RAR PUMP 2B AR 83-00 2129 18 Q2EI3PTO950-P1 CONTAINMENT PRESSURE PROTECTION AD 121-00 2223 TRANSMITTER 18 Q2E13PTO951-P2 CONTAINMENT PRESSURE PROTECTION AD 121-00 2223 TRANSMITTER 18 Q2E13PT0952-P3 CONTAINMENT PRESSURE PROTECTION AS 121-00 2223 TRANSMITTER 18 Q2E13PT0953-P4 CONTAINMENT PRESSURE PROTECTION AD 121-00 2223 TRANSMITTER 10 Q2E16HOO1A-A CHG/HHSI PUMP ROOM COOLER 2A (TRAIN A) AD 100-00 2181 10 Q2E16*IOO1C-8 CHG/NHSI PUMP ROOM COOLER 2C (TRAIN B) AB 100-00 2173 Report Date/Tine: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S)

Program File Name & Version: SSEM vO.0 Page 5 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 4 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2 LINE SYSTEM/EQUIPMENT NO. CLASS MARK NO. DESCRIPTION BUILDING ELEV ROOM alnna.

00c... ... U aa.. . =-b.

.fb acm ae mn~onffmnn~mfl*a....a m *sa wSe....... 0.a*f lb Cm aS*==.

(I) (2) (3) (4) (5) (6) (7) 10 Q2El6HOO3A-A RHR PUMP ROOM COOLER 2A AB 83-00 2131 10 Q2E16HOO3B-B RHR PUMP ROOM COOLER 28 AS 83-00 2129 10 Q2E16HOO4A-A CCW PUMP ROOM COOLER TRAIN A AB 100-00 2185 10 Q2E16HOO4B-B CCW PUMP ROOM COOLER TRAIN B AS 100-00 2185 10 Q2E16HOOSA-A AUX FEEDWATER PUMP ROOM COOLER 2A AB 100-00 2199 10 Q2E16HOO5B-B AUX FEEDWATER PUMP ROOM COOLER 2B AS 100-00 2192 10 Q2E16H006A-A BATTERY CHARGING ROOM COOLERS AS 121-00 2245 10 Q2E16HOO6B-B BATTERY CHARGING ROOM COOLERS AS 121-00 2244 10 Q2E16H007-A MCC 2A ROOM COOLER AB 139-00 2332 10 Q2EI6HOOS-B MCC-2B ROOM ACU AS 121-00 2209 10 Q2E16HOO9-A 600V LOAD CENTER 2D ROOM COOLER AB 139-00 2339 10 Q2E16HOI0-B 600V LOAD CENTER 2E ROOM COOLER AS 121-00 2228 18 Q2E21FTO940 HIGH HEAD SAFETY INJECTION FLOW AS 77-00 2111 TRANSMITTER 18 Q2E2IFTO943 HIGH HEAD SAFETY INJECTION FLOW AB 100-00 2175 TRANSMITTER 21 Q2E21HOO3 SEAL WATER HEAT EXCHANGER AB 100-00 2170 21 Q2E21HO04 LETDOWN HEAT EXCHANGER AS 100-00 2170 07 Q2E21HV8149A-A LETDOWN ORIFICE ISOLATION CB 111-00 CThT 07 Q2E21HV8149B-A LETDOWN ORIFICE ISOLATION CB 105-00 CThT 07 Q2E21HV8149C-A LETDOWN ORIFICE ISOLATION CB 105-00 CYNT 07 Q2E21HV8152 CVCS ISOLATION OUTSIDE CONTAIINENT VALVE AB 100-00 2134 07 Q2E21HV8942-A BORON INJECTION RECIRCULATION PIMP VALVE AB 100-00 2186 07 Q2E21HV894SA-A BORON INJECTION SURGE TANK VALVE AB 100-00 2222 O0A Q2E21LCVO115B-A RWST TO CHARGING PUMP SUCTION VALVE AS 100-00 2172 08A Q2E21LCVOL15C-A VOLUME CONTROL TANK OUTLET ISOLATION VfALl VEAD 121-00 2216 OSA Q2E21LCVO115D-B RWST TO CHARGING PUMP SUCTION VALVE AS 100-00 2172 08A Q2E21LCVO115E-B VOLUME CONTROL TANK OUTLET ISOLATION VALVIE AB 121-00 2216 07 Q2E21LCVO459-A LETDOWN LINE ISOLATION VALVE CB 105-00 CThT 07 Q2E21LCVO460-A LETDOWN LINE ISOLATION VALVE CB 105-00 CTNT 18 Q2E21LT112 VOLU1E CONTROL TANK LEVEL TRANSMITTER AB 121-00 2218 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name & Version: SSEN vO.O Page 6 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 , '

APPENDIX B Page No. 5 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2 LINE SYSTEM/EQUIPMENT NO. CLASS MARK NO. DESCRIPTION BUILDING ELEV ROOM

... 0.= ..b.. 0flag

  • sCC0(4)euh=

(1) (2) (3) (4) n0m SCzfl0=8=© fasfa(a=)

(5) (6) (7) 18 Q2E21LT115 VOLUME CONTROL TANK LEVEL TRANSMITTER AB 121-00 2218 08A Q2E21MOVS100-B RCP SEAL WATER RETURN ISOLATION AB 121-00 2223 OBA Q2E21MOVS106-A CHARGING PIMP MINIFLOW ISOLATION AB 100-00 2170 08A Q2E21MOV81O7-A CHARGING PUMP TO RCS ISOLATION AB 121-00 2223 G8A Q2E21NOVBIOB-B CHARGING PUMP TO RCS ISOLATION AB 121-00 2223 08A Q2E2INOVSIO9A-B CHARGING PUMP POO2A MINIFLOW VALVE AS 100-00 2181 08A Q2E21M0V8109C-8 CHARGING PUMP POOZC MINIFLOW VALVE AS 100-00 2173 08A Q2E21N0V8112-A RCP SEAL WATER RETURN ISOLATION CS 105-00 CTMT OBA Q2E21MOVBI3OA-A CHG. PUMP SUCTION HDR. ISO. (MOVATS) AB 100-00 2183 08A Q2E+21MOV81308B- CHG. PIMP SUCTION HDR. ISO (MOVATS) AB 102-00 2175 08A Q2E2 1MOV813 lA-A CHARGING PUMP SUCTION HEADER ISOLATION AB 100-00 2175 VALVE 08A Q2E21M0OVS13IB-B CHG. PUMP SUCTION HOR. ISO. (HOVATS) AB 100-00 2175 0SA Q2E21MOVS132A-A CHG. PIMP DISCH. HDR. ISO. (MOVATS) AB 100-00 2173 08A Q2E2 1MOVS 1326-S CHG. PUMP DISCH. HDR. ISO. (MOVATS) AB 100-00 2175 08A Q2E21MOVS133A-A CHARGING PUMP DISCHARGE HEADER ISOLATION AB 100-00 2175 VALVE 08A Q2E21MOV8133B-B CHG. PUMP DISCH. HDR. ISO. (MOVATS) AB 100-00 2173 08A Q2E21MOV88OIA-A BORON INJECTION TANK OUTLET ISOLATION AB 121-00 2223 08A Q2EZLMOVS8O3A-A BORON INJECTION TANK INLET ISOLATION AB 100-00 2172 08A Q2E21MOV8808A-A ACCUMULATOR 2A DISCHARGE VALVE CB 105-00 CTMT 08A Q2E21MOV88O8B-8 ACCUMULATOR B DISCHARGE VALVE CB 105-00 CTMT 08A Q2E21NOV88O8C-A ACCUMULATOR C DISCHARGE VALVE CB 105-00 CTlT 08A Q2E21MOVSSS5-8 HHSI TO RCS COLD LEG ISOLATION AS 100-00 2184 05 Q2E21PGO2A-A CHARGINGA/HSI PUMP P002 A TRAIN A AB 100-00 2181 05 Q2E21 POO2C-IB CHARGING/HHSI PUIMP PO02C TRAIN B AB 100-00 2173 21 Q2E21T006 BORON INJECTION TANK AB 100-00 2172 1i Q2FI6FTO50I-A RWST LEVEL TRANSMITTER VID 155-00 YARD YD 1i Q2FI6LT0502-B RWST LEVEL TRANSMITTER 155-00 YARD YD 21 Q2F16T501 REFUELING WATER STORAGE TANK 155-00 YARD Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name & Version: SSEM vO.0 Page 7 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 6 SEISMIC REVIEW SAFE SHUTDOWN EQUIPM4ENT LIST (SSEL)

FARLEY UNIT 2 LINE SYSTEM/EQUIPMENT NO. CLASS sflsssflsnain MARK NO. DESCRIPTION BUILDING ELEV ROOM (1) (2) mmmmssnfamm.t (3) as.. nmawalssmstomnf*lpssssinl ... flfnfl 5fl~fl5 .. 0 =.M.

m.......s.

(4) (5) (6) (7) 07 Q2G21HV3377-A RADIOACTIVE DRAIN ISOLATION OUTSIDE CThT AB 100-00 2184 VALVE 07 Q2G2IHV7136-B WASTE PROCESSING ISOLATION OUTSIDE CTNT AB 100-00 2134 VALVE Q2G24VO03A SG 2A BLOWDOWN ISOLATION AB 121-00 2223 Q2G24VO038 SG 28 BLOWDOWN ISOLATION AB 121-00 2223 Q2G24V003C SG 2C BLOWDOMN ISOLATION AB 121-00 2223 Q2G31HOO1A:-B SPENT FUEL POOL HEAT EXCHANGER TRAIN B AB 155-00 2445 Q2G31HOO1B-A SPENT FUEL POOL HEAT EXCHANGER TRAIN A AB 165-00 2467 Q2H11NGASC2SO6C-B AUX SAFEGUARDS CABINET 'C' AB 155-00 0471 Q2H11NGASC2SO6D-A AUX SAFEGUARDS CABINET 'V' AB 155-00 0471 Q2H11NGB2504J-A BALANCE OF PLANT PANEL 'J'(PROCESS AB 155-00 0471 ELECTRONICS)

Q2H11NGB2504K-B BOP INSTRIJMENTATION CABINET K AB 155-00 0471 Q2H11NGCCM2523A-A ICCMS PROCESSOR CABINET TRAIN A AB 155-00 0471 Q2H11NGCCM2523B-B ICCMS PROCESSOR CABINET TRAIN B AB 155-00 0471 Q2H1INGNIS25O3A-1 NIS EXCORE DETECTOR CABINET AB 155-00 0416 Q2H11NGPIC25OSA-1 PROCESS PROTECTION CABINET CHANNEL 1 AB 155-00 0471 Q2H11NGPIC2505B-2 PROCESS PROTECTION CABINET CHANNEL 2 AB 155-00 0471 Q2H11NGPIC2505C-3 PROCESS PROTECTION CABINET CHANNEL 3 AS 155-00 0471 Q2H11NGPIC2505D-4 PROCESS PROTECTION CABINET CHANNEL 4 AB 155-00 0471 Q2H1INGPIC2505E-1 PROCESS CONTROL CABINET CHANNEL 1 AB 155-00 0471 Q2HlINGPIC2505F-2 PROCESS CONTROL CABINET CHANNEL 2 AB 155-00 0471 Q2H11NGPIC2505G-3 PROCESS CONTROL CABINET CHANNEL 3 AB 155-00 0471 Q2H11NGPIC2SO5H-4 PROCESS CONTROL CABINET CHANNEL 4 AB 155-00 0471 Q2H11NGR2504I-AB RADIATION MONITOR PANEL AB 155-00 0471 Q2H1INGSSP2506G-B SOLID STATE PROTECTION INPUT CABINET AB 155-00 0471 Q2HIINGSSP2506J-B SOLID STATE PROTECTION TEST CABINET AB 155-00 0471 Q2H1INGSSP25O6K-A SOLID STATE PROTECTION INPUT CABINET AB 155-00 0471 Q2H11NGSSP2506N-A SOLID STATE PROTECTION TEST CABINET AB 155-00 0471 Q2H21EOO4-A 4.16KV SWITCHGEAR 2F LOCAL CONT PANEL AB 139-00 2343 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name & Version: SSEM vO.0 Page 8 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 7 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2 LINE SYSTEM/EQUIPMENT NO. CLASS MARK NO. DESCRIPTION BUILDING ELEV ROOM (1) (2) (3) (4) (5) (6) (7) 20 Q2H21EO05-B 4.16KV SWITCHGEAR 2G LOCAL CONT PANEL AB 121-00 2233 20 Q2H21E5O4-A 4.16KV SWITCHGEAR 2H LOCAL CONTROL PANEL OB 155-00 0056A 20 Q2H21E505-B 4.16KV SWITCHGEAR 2J LOCAL CONTROL PANEL DB 155-00 0056C 20 Q2H21E506-A 4.16KV SWITCHGEAR 2K LOCAL CONT PANEL SW 188-06 0072E 20 Q2H21E507-B 4.16KV SWITCHGEAR 2L LOCAL CONT PANEL SW 188-06 0072B 20 Q2H21ES27-B DIESEL GENERATOR 2B LOCAL CONTROL PANEL DB 155-00 0059 20 Q2H21NBAFP2605A-,A LOCAL HOT SHUTDOWN PANEL A AB 121-00 2202 20 Q2H21NBNER2619-B STEAM GENERATOR 1C WIDE RANGE LEVEL MCB As 121-00 2227 ISOLATOR 20 Q2H22LOO1B-A MULTIPLYING RELAY CABINET 2B AB 139-00 2318 20 Q2H22LO01D-B MULTIPLYING RELAY CABINET 2D AB 139-00 2318 20 Q2H22LO02-A TRANSFER RELAY CABINET 1 AB 139-00 2347 20 Q2H22LO03-A TRANSFER RELAY CABINET-2 AB 100-00 2190 20 Q2H22LO04-B TRANSFER RELAY CABINET-3 AB 139-00 2334 20 Q2H22L503-B DIESEL LOCAL RELAY PANEL 2B DB 155-00 0058 20 Q2H25L008-A TERMINATION CABINET AB 139-00 2318 20 Q2H25L029-B TERMINATION CABINET AS 139-00 2318 07 Q2N11HV3369A PAIN STEAM ISOLATION VALVE AB 127-00 2241 07 Q2NU1HV3369B MAIN STEAM ISOLATION VALVE AB 127-00 2241 07 Q2N11HV3369C MAIN STEAM ISOLATION VALVE As 127-00 2241 07 Q2N1IHV3370A-B MAIN STEAM LINE ISOLATION VALVE As 127-00 2241 07 Q2NI1HV3370B-B MAIN STEAM LINE ISOLATION VALVE As 127-00 2241 07 Q2NI1HV3370C-B MAIN STEAM LINE ISOLATION VALVE AB 127-00 2241 18 Q2NIILT0477-A STEAM GENERATOR 2A WIDE RANGE LEVEL CB 155-00 CINT 18 Q2NI1LT0487-A STEAM GENERATOR 29 WIDE RANGE LEVEL CB 155-00 CTNT 18 Q2NILT0497-B STEAM GENERATOR 2C WIDE RANGE LEVEL CB 155-00 CTKT 18 Q2NIIPTO474-P2 STEAM GENERATOR 2A PRESSURE AB 130-00 2241 18 Q2N11PTO47S-P3 STEAM GENERATOR 2A DISCHARGE PRESSURE AB 130-00 2241 18 Q2N11PT0476-P4 STEAM GENERATOR 2A DISCHARGE PRESSURE AB 130-00 2241 18 Q2N11PT0484-P2 STEAM GENERATOR 2B DISCHARGE PRESSURE AB 130-00 2241 Reprt Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name & Version: SSEN vO.0 Page 9 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 8 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2 LINE SYSTEN/EQUI PIIENT NO. CLASS MARK NO. DESCRIPTION PILDING BU ELEV ROOM (1) (2) (3) (6)

(4) (5) (7) 18 Q2N11PTO485-P3 STEAM GENERATOR 28 PRESSURE AB 130-00 2241 18 Q2N11PTO486-P4 STEAM GENERATOR 2B DISCHARGE PRESSURE AB 130-00 2241 18 Q2N11PT0494-P2 STEAM GENERATOR 2C DISCHARGE PRESSURE AB 130-00 2241 18 Q2N11PT0495-P3 STEAM GENERATOR 2C DISCHARGE PRESSURE AB 130-00 2241 18 Q2N11PT0496-P4 STEAM GENERATOR 2C PRESSURE AB 130-00 2241 18 Q2NU1PT3371A-A STEAM GENERATOR 2A PRESSURE AS 155-00 2464 18 Q2N1UPT3371B-A STEAM GENERATOR 28 PRESSURE AB 155-00 2462 18 Q2N11PT3371C-A STEAM GENERATOR 2C PRESSURE AS 155-00 2462 07 Q2N11PV3371A-A MAIN STEAM ATMOSPHERIC RELIEF VALVE AS 127-00 2241 07 Q2NI1PV3371B-A MAIN STEAM AThOSPHERIC RELIEF VALVE AB 127-00 2241 07 Q2N11PV3371C-A MAIN STEAM AThOSPHERIC RELIEF VALVE AS 127-00 2241 O0B Q2N11SV3369AC-A SOLENOID FOR MAIN STEAM ISOLATION VALVE AB 127-00 2241 088 Q2Nl1SV3369BC-A SOLENOID FOR MAIN STEAM ISOLATION VALVE AB 127-00 2241 OOB Q2NIISV3369CC-A SOLENOID FOR MAIN STEAM ISOLATION VALVE AB 127-00 2241 18 Q2N23FI3229AB-A FEEDWATER INTAKE FLOW INDICATION AB 100-00 2190 18 Q2N23FI3229CB-B FEEDWATER INTAKE FLOW INDICATION As 100-00 2190 18 Q2N23FT3229A-A AUX FEEDWATER FLOW TRANSMITTER AB 100-00 2189 18 Q2N23FT3229B-B AUX FEEDWATIR FLOW TRANSMITTER AB 100-00 2194 18 Q2N23FT3229C-B AUX FEEDWATER FLOW TRANSMITTER AS 100-00 2189 07 Q2N23HV3227A MOTOR DRIVEN AUX FEEDWATER TO STEAM AS 130-00 2241 GENERATOR 2A 07 Q2N23HV3227B MOTOR DRIVEN AUX FEEDWATER TO STEAM AB 130-00 2241 GENERATOR 2B 07 Q2N23HV3227C MOTOR DRIVEN AUX FEEDWATER TO STEAM AB 130-00 2241 GENERATOR 2C OBA Q2N23N0V3209A-A SERVICE WATER ISOLATION VALVE TO AUX As 100-00 2191 FEEDWATER OBA Q2N23MOV3209B-B SERVICE WATER ISOLATION VALVE TO AUX As 100-00 2192 FEEDWATER OA Q2N23N4V3210A-A SERVICE WATER TO AUX FEEDWATER PUMP 2A AB 100-00 2191 INTAKE OSA Q2N23NOV321OB-B SERVICE WATER TO AUX FEEDWATER PUMP 2B As 100-00 2192 INTAKE Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name &Version: SSEM vO.O Page 10 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 9 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2 ECINE SYSTEM/EPUIPMENT NO. CLASS MARK NO. DESCRI TION BUILDING ELEV ROOM

=.OaWUmaW..s.==. .0-1-na ....s....

i (2) (3) (4) (5) (6) (7) 05 Q2N23PO01A-A AUX FEEDWATER PUMP 2A AB 100-00 2191 05 Q2N23PO01B-B AUX FEEDWATER PUMP 28 AB 100-00 2192 18 Q2PI1LTO515-A CONDENSATE STORAGE TANK LEVEL TRANSMITTER YD 155-00 CST 18 Q2PIILTO516-B CONDENSATE STORAGE TANK LEVEL TRANSMITTER YD 155-00 CST 21 Q2PU1TO01 CONDENSATE STORAGE TANK YD 155-00 YARD 07 Q2P13HV2866C-A CONTAINMENT PURGE ISOLATION OUTSIDE CTNT AB 121-00 2223 VALVE 07 Q2P13HV2866D-B CONTAINMENT PURGE ISOLATION INSIDE CThT CB 129-00 CTMT VALVE 07 Q2P13HV2867C-A CONTAINMENT PURGE ISOLATION OUTSIDE CTMT AB 121-00 2223 VALVE 07 Q2P13HV2867D-B CONTAINMENT PURGE ISOLATION INSIDE CTNT CB 129-00 CTNT VALVE 07 PRESSURIZER LIQUID SAMPLE LINE ISOLATION CB 129-00 CTMT Q2P1SHV3103-A VALVE 07 Q2PISHV31OS-B RHR HX A SAMPLE VALVE AB 83-00 2128 07 Q2P15HV3106-B B RIR HX SAMPLE VALVE AD 83-00 2189 07 Q2P15V3332-B PRESSURIZER SAMPLE AB 121-00 2223 07 Q2P1SHV3333-B RCS HOT LEG SAMPLE LINE ISOLATION VALVE AB 121-00 2223 07 Q2P15HV3765-A RCS SAMPLE CB 129-00 C1MT 0 Q2P16F5O1A-A SW STRAINER 2A SW 167-00 0072A 0 Q2PI6F5O1B-B SW STRAINER 2B SW 167-00 0072A 07 Q2P16FV3009A-A CCW HEAT EXCHANGER SERVICE WATER DISCHARGE AB 100-00 2185 07 Q2P16FV3009C-B CCW HEAT EXCHANGER SERVICE WATER DISCHARGE AB 100-00 2185 20 Q2P16LOO1-A SERVICE WATER DISCHARGE VALVE RELAY AB 155-00 2409 CABINET 2A 20 Q2PI6L002-B SERVICE WATER DISCHARGE VALVE RELAY AB 155-00 2405 CABINET 2B O0A Q2PN6MOV3149-A BLOWDOWN HEAT EXCHANGER ISOLATION NOV AB 121-00 2223 06 Q2P16POO1A-A SERVICE WATER PUMP 2A Sw 188-06 0072A 06 Q2PI6P00B-A SERVICE WATER PUMP 20 SW 188-06 0072A 06 Q2Pl6P0O1D-B SERVICE WATER PU1P 2D SW 188-06 0072A 06 Q2P16P0O1E-B SERVICE WATER PUMP 2E Sw 188-06 0072A Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Nwuber Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name & Version: SSEM vO.O Page 11 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 10 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2 LINE SYSTEM/EQUIPMENT NO. CLASS MARK NO. DESCRIPTION BUILDING ELEV ROOM

..... l....l..l..... ==*....a...lmU.......0.04a. ....

(1) (2) (3) (4) (5) (6) (7) 18 Q2P16PDS62O-A DIFFERENTIAL PRESSURE SWITCH YD 155-00 WODGB Q2P16PDS621-B DIFFERENTIAL PRESSURE SWITCH YD 155-00 WODGB OBA Q2P16V514-B SERVICE WATER TO TURBINE BLDG ISOLATION YD 155-00 2SVB1 VALVE 08A Q2P16V515-A SERVICE WATER TO TURBINE BLDG TRAIN A YD 155-00 2SVB1 ISOLATION OSA Q2P16V516-B SERVICE WATER TO TURBINE BLDG TRAIN A YD 155-00 2SVB1 ISOLATION OBA Q2P16V517-A SERVICE WATER TO TURBINE BLDG TRAIN B YD 155-00 2SVBI ISOLATION O8 Q2P16V538-B SERVICE WATER EMERGENCY RECIRCULATION TO YD 155-00 2SVB2 POND OBA Q2P16V539-A SERVICE WATER EMERGENCY RECIRCULATION TO YD 155-00 2SVB2 POND O0A Q2P16V545-B SERVICE WATER DISCHARGE FROM AUXILARY YD 155-00 2SVB3 BUILDING 08A Q2P16V546-A SERVICE WATER DISCHARGE FROM AUXILIARY 155-00 2SVB3 BUILDING 07 Q2P16V562-B B TRN DIL BYP PCV YD 155-00 2VB2B 07 Q2P16V563-A A TRK OIL BYP PCV YD 155-00 2VB2A 07 Q2P16V577-A A TRI NIN FLOW Sw 188-00 SW 07 Q2P16V578-AB 2C PUM MIN FLOW SW 188-00 SW 07 Q2P16V579-B B TRN MIN FLOW Sw 188-00 SW 21 Q2P17HOO1A-B CCW HEAT EXCHANGER TRAIN B AB 100-00 2185 21 QZP17HO01B-AB SWING CCW HET EXCHANGER AB 100-00 2185 21 Q2P17HO01C-A CCV HEAT EXCHANGER TRAIN A AB 100-00 2185 07 Q2P17HV2229 COM ENT COOLING WATER SUPPLY TO SA1PLE AB 100-00 2162 COOLERS 07 Q2P17HV3045-A CCW RETURN FROM RCP THERMAL BARRIER AB 121-00 2223 ISOLATION 07 Q2P17HV3067-B CCV RETURN FROM EXCESS LETDOWN AB 121-00 2223 07 Q2P17HV3095-B CCV SUPPLY TO EXCESS LETDOWN HEAT AB 121-00 2223 EXCHANGER 07 Q2P17HV3096A CCW NON-SAFETY ISOLATION AB 100-00 2161 07 Q2P17HV3096B CCW NON-SAFETY ISOLATION AB 100-00 2161 Re rt Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name & Version: SSEM vO.0 Page 12 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 11 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2

'LINE SYSTEM/EQUIPNENT DESCRIPTION NO. CLASS MARK NO. BUILDING ELEV ROOM (1) (2) (3) (4) (5) (6) (7) 07 Q2P17HV3184-B CCORETURN FROM RCP THERMAL BARRIER CB 130-00 CTNT ISOLATION 07 Q2P17HV3443-A CCW RETURN FROM EXCESS LETDOWN HEAT CB 129-00 CTNT EXCHANGER 08A Q2P17MOV3046-B CCW RETURN FROM RCPS Co 129-00 OHB OBA Q2P17MOV3052-A CCW TO RCP THERMAL BARRIER ISOLATION AB 121-00 2223 00A Q2P17MOV3182-A CCW RETURN FROM RCPS AB 121-00 2223 OBA QZP17POV3185A-A CON INLET TO RHR HEAT EXCHANGER NO. 1 AS 83-00 2128 OBA Q2PI7MOV3185B-B CCOINLET TO RHR HEAT EXCHANGER NO. 2 AB 83-00 2128 05 Q2PI7POOIA-B CCW PIMP 2A TRAIN B AB 100-00 2185 05 Q2PI7POO1C-A CCOPUMP 2C TRAIN A AB 100-00 2185 21 Q2PI7TO01 SURGE TANK (CCW) AB 179-00 2506 12 Q2P18CO02A-A EMERGENCY AIR COMPRESSOR TRAIN A AB 100-00 2189 12 Q2PL8CO02B-8 TRAIN B EMERGENCY AIR COMPRESSOR AB 100-00 2189 07 Q2P19HV2228-B PRESSURIZER PORV BACK-UP AIR SUPPLY VALVE AB 121-00 2223 07 Q2P19HV3611-A CThT INST AIR ISO AB 100-00 2184 21 Q2PI9NCYL-A NITROGEN CYLINDER AB 121-00 2218 21 Q2P19NCYL-B NITROGEN CYLINDER AB 121-00 2218 04 Q2RIIBOO4-A LC TRANSFORMER 20 AB 139-00 2335 04 Q2RI1B005-B LC TRANSFORMER 2E AS 121-00 2229 04 Q2R1IB503-A LC TRANSFORMER 2R DB 155-00 0056A 04 Q2R11B504-A LC TRANSFORMER 2K SW 188-06 0072E 04 Q2R11B505-B LC TRANSFORMER 2L SW 188-06 0072B 04 Q2R11B507-8 LC TRANSFORMER 2S DB 155-00 0056C 03 Q2R15A006-A 4.16KV SWITCHGEAR 2F AB 139-00 2343 03 Q2RI5A007-B 4.16KV SWITCHGEAR 2G AS 121-00 2233 03 Q2R1SA503-A 4.16KV SWITCHGEAR 2H DB 155-00 0056A 03 Q2RISA504-B 4.16KV SWITCHGEAR 2J DB 155-00 0056C 03 Q2RI5A505-A 4.16KV SWITCHGEAR 2K SW 188-06 0072E 03 Q2R15A5O6-B 4.16KV SWITCHGEAR 2L SW 188-06 0072B 02 Q2R160006-A 600V LOAD CENTER 20 AB 139-00 2335 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name & Version: SSEM vO.O Page 13 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 12 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2 LINE SYSTEM/EQUIPMENT NO. CLASS MARK NO. DESCRIPTION BUILOING ELEV ROOM ulmyn .. l..o....

(1) (2) (3) (4) (6) (7)

(5)

Q2R16B007-B 600V LOAD CENTER 2E AB 121-00 2229 Q2R17B001-A MCC 2A AB 139-00 2332 Q2R17B002-B MCC 20 AB 121-00 2209 Q2R17BO08-A MCC 2U AB 139-00 2347 Q2R17B009-B MCC 2V AB 139-00 2334 Q2R17B098-A MCC 2CC AB 155-00 2409 QZR17BO99-B 14CC 2W0 AB 155-00 2405 Q2R17B510-B MCC 2T DB 155-00 0059 Q2RISBO29-A POWER DISCONNECT SWITCH AB 139-00 2332 Q2R1SBO30-A POWER DISCONNECT SWITCH AB 139-00 2332 Q2R18BO31-A CIRCUIT BREAKER BOX AB 139-00 2332 Q2R18B032-A CIRCUIT BREAKER BOX AB 139-00 2332 Q2R18B033-B POWER DISCONNECT SWITCH AB 139-00 2322 Q2R18BO34-B POWER DISCONNECT SWITCH AB 139-00 2322 Q2R18BO35-1B CIRCUIT BREAKER BOX AB 139-00 2322 Q2R18B036-B POWER DISCONNECT SWITCH AB 139-00 2322 QZR18BO38-A NOV POWER DISCONNECT SWITCH AB 139-00 2332 Q2R1SB039-A NOV POWER DISCONNECT SWITCH AB 139-00 2332 Q2R18BO40-A NOV POWER DISCONNECT SWITCH AB 139-00 2332 Q2R18BO41-B NOV POWER DISCONNECT SWITCH AB 139-00 2312 02 Q2R18B042-B NOV POWER DISCONNECT SWITCH AB 139-00 2312 02 Q2R18B043-B NOV POWER DISCONNECT SWITCH AB 139-00 2312 14 Q2R21BOO1A-1 120 V REG. PANEL 2C AB 155-00 2416 14 Q2R21001B-2 120 V REG. PANEL 2D AB 155-00 2416 14 Q2R21BO01C-3 120 V REG. PANEL 2E AB 139-00 2318 14 Q2R21BOO1D-4 120 V REG. PANEL 2F AB 139-00 2318 16 Q2R21E009A-1 INVERTER 2A AB 121-00 2224 16 Q2R21E009B-2 INVERTER 2B AB 121-00 2224 16 Q2R21EO09C-3 INVERTER 2C AB 121-00 2226 16 Q2R21EO09D-4 INVERTER 2D AB 121-00 2226 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name &Version: SSEN vO.O Page 14 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 13 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2

.LINE SYSTEM/EQUIPMENT NO. CLASS MARK NO. DESCRIPTION BUILDING ELEV ROOM (1) (2) (3) (4) (5) (6) (7) 16 Q2R21EO09F-A INVERTER 2F AB 121-00 2224 16 Q2R21EOO9G-B INVERTER 2G AS 121-00 2226 14 Q2R21LOOIA-1 120V VITAL AC INSTRUMENT DISTRIBUTION AB 155-00 0471 PANEL 2A 14 Q2R21LOO1B-2 VITAL AC DISTRIBUTION PANEL 2B AS 155-00 2471 14 Q2R21L01C-3 VITAL AC DISTRIBUTION PANEL 2C AB 139-00 2318 14 Q2R21LOO1D-4 VITAL AC DISTRIBUTION PANEL 2D AS 139-00 2318 14 Q2R21LOOSA-A 120V VITAL AC DISTRIBUTION PANEL 2J AS 121-00 2224 14 Q2R21LOO5B-B 120V VITAL AC DISTRIBUTION PANEL 2K AB 121-00 2226 03 Q2R36ASOI-A 4.16KV SWITCHGEAR 2K SURGE ARRESTOR SW 188-06 0072A 03 Q2R36A502-B 4.16KV SWITCHGEAR 2L SURGE ARRESTOR SW 188-06 0072A 03 Q2R36A510-A 4.16KV SWITCHGEAR 2K SURGE ARRESTOR D8 155-00 0056A 03 Q2R36A511-B 4.16KV SWITCHGEAR 2L SURGE ARRESTOR DO 155-00 0056C 14 Q2R41LOOIA-A 125VDC DISTRIBUTION PANEL 2A AS 155-00 0471 14 Q2R41LOO1B-A 125VDC DISTRIBUTION PANEL 28 AB 139-00 2343 14 Q2R41LOOIC-A 12SVDC DISTRIBUTION PANEL 2C AB 139-00 2312 14 Q2R41LOO1D-B 125VDC DISTRIBUTION PANEL 2D AB 155-00 0471 14 Q2R41LOO1E-B 125VDC DISTRIBUTION PANEL 2E AS 121-00 2233 14 Q2R41LOOIF-B 125VDC DISTRIBUTION PANEL 2F AB 121-00 2209 14 Q2R41L507-A 125VDC DISTRIBUTION PANEL 2M SW 188-06 0072E 14 Q2R41L508-B 125VDC DISTRIBUTION PANEL 2N SW 188-06 00728 02 Q2R42BO01A-A 125VDC BUS 2A AS 121-00 2224 14 Q2R42BO01B-B 125VDC BUS 28 AS 121-00 2226 18 Q2R42B522A-A UNIT 2 SERVICE WATER BATTERY FUSE BOX SW 188-06 0074 18 Q2R42B522B-B UNIT 2 SERVICE WATER BATTERY FUSE BOX SW 188-06 0073 16 Q2R42E01A-A BATTERY CHARGER 2A AS 121-00 2224 16 Q2R42EOOIB-B BATTERY CHARGER 28 AS 121-00 2226 15 Q2R42EO02A-A BATTERY 2A AB 121-00 2214 15 Q2R42E002B-B BATTERY 28 AS 121-00 2212 17 Q2R43AS05-B DIESEL GENERATOR 28 (SKID) D6 155-00 0059 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name &Version: SSEM vO.O Page 15 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 APPENDIX B Page No. 14 SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)

FARLEY UNIT 2 LINE SYSTEM/EQUIPMENT NO. CLASS MARK NO. DESCRIPTION BUILDING ELEV ROOM flfla m aasmflfll aS~inS US f..M........

(1) (2) (3) (4) (5) (6) (7) 20 Q2R43E0O1A-A SEQUENCER 82F AB 139-00 2335 20 Q2R43EO0IB-B SEQUENCER B2G As 121-00 2229 20 Q2R43EOO2A-A SEQUENCER 82F AUX PANEL As 139-00 2343 20 Q2R43E0028-B SEQUENCER B2G AUX RELAY PANEL AB 121-00 2233 20 Q2R43E501A-A 4KV BUS 2H SEQUENCER DB 155-00 0056A 20 Q2R43E501B-8 BUS 2J LOADING SEQUENCER DB 155-00 0056C O Q2R43ES02B-B DIESEL GENERATOR 28 NEUTRAL GROUNDING Do 155-00 0059 RESISTOR 04 Q2R43G510-B DIESEL GENERATOR TERMINAL CT JB DB 155-00 0059 21 Q2R43T503-B FUEL OIL DAY TANK 2B DB 155-00 0064 21 Q2R43T504 DIESEL GENERATOR 2B STARTING AIR RECEIVER DB 155-00 0059 TANK 21 Q2R43T505 DIESEL GENERATOR 28 STARTING AIR RECEIVER DB 155-00 0059 TANK 09 Q2V47CO12A-A AUXILIARY BLDG A TRAIN BATTERY ROOM As 175-00 2501 EXHAUST FAN 09 Q2V47CO12B-B AUXILIARY BLDG B TRAIN BATTERY ROOM AB 177-00 2501 EXHAUST FAN 06 Q2Y52P503B-8 DIESEL GEN 28 FUEL OIL STORAGE TRANSFER YD 140-00 YARD PUMP 21 Q2Y52T503 FUEL STORAGE TANK 2B YD 155-00 YARD 18 QSY418532B-B DIESEL GEN. ROOM 2B FIRESTAT DB 155-00 0059 18 QSY41B616E-B DIESEL GEN. ROOM 28 FIRESTAT DB 155-00 0059 18 QSY418616F-B DIESEL GEN. ROOM 28 FIRESTAT DB 155-00 0059 18 QSY41B616G-B DIESEL GEN. ROOM 25 FI: RESTAT DB 155-00 0059 18 QSY41B616H-B DIESEL GEN. ROOM 28 Fi1tESTAT DB 155-00 0059 09 QSY41C507C-B DG RE 28 EXHAUST FAN DB 177-00 0059 09 QSY41C5O7D-B DG RN 28 EXHAUST FAN D8 177-00 0059 0 QSY41M542A-B DGRE 28 INTAKE LOUVER MOTOR DB 155-00 0059 0 QSY41NS42B-B D6 RE 2B INTAKE LOUVER MOTOR DB 155-00 0059 0 QSY41M542C-B DG RE 2B INTAKE LOUVER MOTOR DB 155-00 0059 0 QSY41N542D-B DG RM2B INTAKE LOUVER MOTOR DB 155-00 0059 Report Date/Time: 02-27-95 / 16:27:33 Data Base File Name/Date/Time: U2MASTER.DBF / 02/27/95 / 16:24:54 Sort Criteria: ID Number Filter Criteria: (Eval. Type CONTAINS 'S')

Program File Name & Version: SSEM Y0.O Page 16 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 1 SEISMIC WALKDOWN EQUIPMENT LISTS UNIT 2 - SWEL 1 NO. SNCF164-RPT-02 Equipment List Palzes Unit 2 - Base List 1 2-16 Unit 2 - SWEL 1 17-21 Unit 2 - Base List 2 22-23 Unit 2 - SWEL 2 24-26 Page 17 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0

-UNIT 2 SWEL1

/ I SWEL Revision Date - 9/18/12 Origfnator: R~a.

Unc Date: 1117 Origin ator: " O z , Date:;2-Reviewer:' 1fL' Y-lu

/o moD Date: 24 IZ-LJ9uJ Ops Reviewer: 111. -

~O ~4I/L/

Peer Reviewer: Date: __ -_,_-__

Date,____

Peer Reviewer: l,4,i4-u-Peer Reviewer.,P A.~iiver, Date:

Peer Reviewer: Zcki*¢6,,-. 5 *.

kiic ]_, '2k Date: ../t/LIZ _

Page 18 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 U-e dginl/.pd-d P EE-/A46'* ad,-App-eniF

. Q en #4 Hea Ieoa Vaiety Ef -enhnFed No An.eurd' Equip ,ent Bre -e Walkd-w tye f*nrblts(ules MPLd S,,-m/Eq.ipR-tDespd-~n Bidn E-DeVatonLo . T,-i R...., B-1.to Mane eupmn

....... Varity f nvitonm b didenbfld`

duingt1heIPEFE (-,d tgiiat uth If.s R.ea,CEor Ec~oolntcolat Fr h (210 oseEE 5FEoFr C~moE)louae RaFtFO P -*TueEEentyUl1-1OeO Vif rd ft..

Control Con-o Control H-etS-k) ConinmentS,0-teOs eupp.n AppFendO) d 7CoF...

Ha,.h MiLd Outdoors/SWIO

(-1EaEr Sldg, (Control, hl-neSO-Fe, C0-A M..A) DieelG-e RIdgi Y-,d V-.e POe) Ne No

. OE S -

I O1ESEMOVBOOE pRESSJURIZERPOWER RELIEF ISOLATION VALVE CTMT 17 B X X 01 X N CTMT x (I) Ex DCF2OgOL601 JOG MODS LEIERITOL 0 ESEURIZEEPOWIE REElE VALVE CTMT 173' A A FI1 A 7 TN-17-l A A(1) X NEW STLEACTUATOR AND DIAPHURGM PERWO I LC1OON REACTOR TRIP5WITCHGEAR NO.1 AuxlarBldg. 11F'OF3S AO X CI l 2 A.1lE'/223 IOEE-CENL TlNLS NO 3OLGEOOTOETHEE; RESOLVE BOLTING TOGETHER CA0INETS F0-'F FLOW VOLVE EF.FF EY 27;7X

  • LLI FI MINI PUMP AEx!,irBldg. 010'/LEER C;I0ATFEOFWWFCO0 x *L A OF RB-083'00F28 OB-0FOO/2A2 0 F 2IEEFFIFI IRHC PUMP FLOW B F F 000 OF O2EOEF*TE6B 0H00 RHREATXCLANER DISCHARGE 0000 AuxNilEiEryd. 0/2E2W ITM AFFO1 IvF TRANSMITTER Bldg. oIAO B x R 010 OF Ai.51!11? 28. x X O~U ROEA00LOOOOOROE,,E RUEOLE *12]*08'21 71GVEllHD1d RHERHEAT EXCHANGER 1uiir 2B Ell O-/21E8 A. x X
  • TEOLO3594A COMTFSUMP LEVELTRANS MTEPR PW IUPPLy AuxiiryBldg I39'/3I OF A 0 B

LE0 IF CMT' I x F WEOFLT3594B CMTSUMP LEVELTFANSM-,E CMT C ORO B R 0 FEE CNMF m(E) A) x -

00 -EEOW1-702A RHR INLETISOTION VALVO CTMT LOSO A 910F OF-EOB00FF Aliary RId . OFE02 x X 0(1) x O1O2C1MOVFTOIB FTN LOOP NO,2DISCHARGE TOCVC5 F 07-7'211A X 0771E2129 B X 0ll TO OHR PUMP 2O FACTION AOEElma Fdg. A R 0 x OEOEllMOVFRF9BRWST x Ell F A - E07 77'2 129 CO FOSUMPTOF OE P UMP O L VT FIO ION Aux l aryBldg. 07T/ 2129 B OV FI1 1 F- E FIM 2B B F F A10 0B-7772129EA F(10 FROFEENOV R 000LHSI TORCS COLD LEG AuEili.aFIEd. 1271121 10 O IIP0R RHFppA APOTliay Bldg. -F7-/129 B F10 x 0 3BE837/2129 x X R :13 OF OR-121'/2223 F 1B QEOFIp~oSOS CTNT PRESSURE PROTECTOFBFI.NLTE*R AEiaryBldg. E2l'/222 N 1OOOlE1H0d1C CHG/HHSI PUM PBOON 0000R2C AuElary BOF- 100B000 F'/F7R X X X 00G 0 10 A-7'/2173 FX E 1O 2E1OOO3R BOR PUMPROON 2E COOLEOER Aljiary Bldg. -'-lO F R R AFG RO 0 A 00oB-083'2129 000 00 OO0Z2FS FxEI X s0R0 5CEOO A Au!ilIarRId 10E'/2185FA R 5 R F ES0Q00000000 CCW PUMP ROOM COOLER TRAIN 10 B-1EO00'/219 R Auxiary BldgR 00000100 0 X R10 x 2OQOE16HOO5 AUX FEEOWATER PUMP BOON .OLEE 2B 00 OR-O390IF33 F EA IuxIhF, R 01x MCC 2AROOM COOLER RId 139'S2332 2F2 0011007 K X AExEEaryBRI. 1210022031 0 11 100 A-139'72332 2; O2E1HOF MCC 23IROOMACU C PX AuEiliary BId. 10070005 B F 210 F 1F OF-EOO'0017 23 O2WOEIFTFF43 HIG0H HEADSA-FT INJECTION F-LOW

-21EDREl TRANSMU 2O 1CVOI1B FWSTTO CHARGING PUMP SUCTION VALVE AuxLEiiryBdId. 1000/012 B X xBOO F AB 100'277220F Fl R x Axiiry OidL 121'02218 N R F2I OF A ER-121' 0(1) X 25Q2EOI 12 LTL VCT LEVELTRANSM UITER 001SA1-/222E R IO0 A'x R 0 0 X 2E Q2E21MOV81FO RUP WATEO SEAL RETURN INO000 R 00 R 5 00-1001/2O2R 0 0F 0 10 MOO OCTPASBER8OO 10 OOE21MOV8OOR CHARGING PUMP TO0- 15OL-TION Alia R . I0OVOOIF F R R 01

'I R00/2170 AI-GG...5 0P IF-XF IIO 2RQOE21MOVENORC R00000 _MA p 1U NIIFLOW VALO AuWiEir 00 F R R 00 IR 8 F F X OC 2O42S21R0 2OQ2EO1MOV8112 NCP 0 'WATERRECLR.IFOLUTOO LTNT-IRC m CTMT EAC 0 R 0 R OR F AF-100001F3 FR F Ia F 5)0) -ONVEROED ACORPERBWO 2AEOORIA231 00 OOE21MOVF1FOAOHG PUMP SUCTIONH0R 00 0TION Au0ilia, Bldg. 1-lOOOF A S S AB-IOOEO17 0uxiia0RIdE 10 0 A R R O1 31Q2E21MOVF133A CHG PUMNP DICHARGEE HOR 00OLATIO F FNT A 0 0 000 8 CTO-IO' ACCUMULATOR BDISCHARGEVALVE COMT 000 0 RROOIAIOOVFROSE I R AuxIlFO RIdt 0000280 B F F X1)0) 10 8 AB-- 0 0 - IRPLUCEO PUNSPER NOCE707125010K 00 O2OSFMoVBi8 H0S1 TrO 0 EEG I1O0TI0 11.1 000 1 S AR-IOO'/20 Bldgr IdI. 000/2174 B X 0 X61 34Q2E21 WIPOO2F COOAINOVHHSPLOP PO02B SWN SUP ER5 .LGl]

A(1 0/27 A X RWST LEVEL LRIGHHIPUTRANSMITTERlPI .1DPOp A d Yar,L' ISGGFIGLTO50 S FA 0 00FAFE YI 05 A IPEEEC MISSINGSCREW ATOTRNS-M1ER; F RESOLVE MISSINGSCREW N AX X x F16-155'INSTALLING 000100WATROR 0000000TARE F 155 36005011 Iuiir Ilg I5'07 10Q2000H000 39Q2HllNGASC25OGU SFP0EAT AUX EXCHANGER SAFEGUARDS TRAIN CABINET D A AuxiliFBldgI 16S'E1467 BAI R VIE l 1C A-S'O7 F

x ~IPEEE: LIGHT POTENTIALINTE ANDFO PANELS RACTION WITH OVERHEAD INGDE*S.6P ANDO, XRESOLVEN.BY RETRAININ OVERHEADULGHTSAND M HIFG-dA GOPINTRUENTTIO

.B...TINGCINET TOG S ETHER

- INC x X - fl- Bld . IS /O4 1 X KIP-* PUTENTILIET IOACTW-f VERHEAUD NOT CABINETS ROLTED LIHTADADJACENT TOGETHER; REOLTVBY REOTRA FIND OVERHEAD RFOGT AROESDOLVINECABINSWTOGOEIR OVERHgA 20IHT POTENILITRCINWT AB15/46IPEEE: REOLVE BY RESTRINING OVERHEAD LIGHS Page 19 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 O2OAIEAPHCESEEO PROCESS PRTOECTSONCCEHRCTCOHSSLLS SS'/Ao71 N x ZO I ESOHEERL PICE25OH ROCESSCOeLCASINSE CHANNEL4 AEi., .1Bd. 2554/.71 N X IL I0 1R-CO15L'/0471 x I x

.A A3H11NASRA250N SOUESTATf PROTECTION TESTCAINET -XlA-BldB 15'/7041 A x x lE 2o AS-15'/E*71 IpEE- POTEENTIALITERACTIIO WITHOVERHEAD CBAN- NOT BOLTED

= ,ANADJACUNT AS'32H2EEOOS SWLCHGEAR 2.EVIOCAL CONTPANEL AuxiiaryIdI. 121d. 2233 B S S X R HU IB.121Y223 RN WOATE2ESS 4. SNEWLOCHGEARS LUCALCONT PANEL XRR X H*!,s 00GE5, SS, ____S EGQO-E5.7 4.16EKVSWTCHGEAR O2 LOCALCCNT PANEL SWIS 18N/OOB72B B x HO1 2E-1-'/OO712. S S ,EEEPRORHIHIRO=ETNWOOWO OIpFEI:ApUTNTIA DNEATO WTHWTS.H BOLTED TOGETHER; RESOLVEBYRESTRAINING OVERHEAD LIGHTANDBOLTING CABINETSTOGETHER 47Q2NH2NMER2619 SGA1C WIDE RANGE LEVEL MCB ITOLATAR Auii-yId., 12E'1.22E B X 1 0-021IA2I7

4. T2H22LOGTD MULTITLYINA RELAyCABINET2D Auiiay BId,. 130112-1 E X 5B0 A. 19'23 490C11 22L03 TRANFE RELAYCABINET 2 Aul ay BldgV . ILE'Ing. A X 022 AG-1./1-0 PEEE:POTENTIAL INTERA-CCONFROM NEARBY IABLE; RESOLVEBYREMOVING TABLE SE.2.ESO0 DIESELLOCAL RELAYPANEL 2A -NNIlBldg -NcoS. x 20 -155'/005S O HPEEE:

POTENTIAL INTERACTIONFROM OVERHEAD LIGHT AND ADJACENTCABINETSNOTBOLTED TOGETER; RESOLVEBYRESTRAININGOVERREAD LIGHTS AN DBOLIHNG CABINETS*

TOGETHER El 22 5LOOS TERMINATION LABINET AuxEAr, BIAS. 139 */2318 B X A O1II1 11 x 1 IEER:

p0 POTENTIAL INTERACTIONFRO PANEL U H2SLOSO. 1-3.0&,11 A,40-A,ES40,C,40P-0, AND 4(

E;RESOLVE BYS O'INGEABINETST-ETHEBR.

I: IINIITC0SC MAIR 001dM NOLION VALVE A-7ilaB 12A'/2A41 A N 0011 7 AB0

-12241 x-E x 5!QNAS11UVsSOB MAIN ETEAMAASIIOLETIO VALVE AIALNaEBId,. -27'/-l41 B 511 7 AB-127'/H241 E( REPLACED AIRCYLINDERWTHLAEGER AIRCYLINDER AND STIFFER SPRINGCDP 2Dn-4401 14 C MISCHARGE M3RIVAP 28 H130/2241 PS RE ETE H N 1A A2-131T/2111 x X AS2EAPT 37MB MAIN STEAM ATMWSPHERE RELIEF VALVE Au*hI, 327'/2241 A x REd0L AAA7/2S41 _7 x xa) E IS QIN23E3229CC FEEIDVATER INTAKEFLOW INDICATION AANihar. RdA. 10O-'2190 A x RA3 S A 1B-2O012H90 x x S8QAER2NDHZ SWB AUX FNEDWATER ULGA TRAISMNTT ER AA-iIary BIdA -100/194 B x N23 X 10 AGB-1RO194 X X 59O2N230V3227C MOTOR G DRIVEN ENGRATOR 2CAUX FEEDWVATER TOSTEAM AuxiAiary Bldg. /L A N023 7 AB-1WEV2241 XAPC(HH TO--.209N2 2 MY ISOLATION VALVETOAUX FEEAWATER 1d1. IN..,

1B/S1OR-B x N23 IB-1'OA/2192 x x 61 NT23MOV3210A TWTOAUX FEWTERPUMP 2A0NAKE SAu Bid, RS2 A X P23 F TARE-I/2N X xAS 61ý2-N23I p A8UXFEEDWATER PUMP 2B AuxiiarBidi 100'/2192 8 X S 12 k8-100/219 x X 63 OPILSVS15 TEONDESATRE TA TANK LEVEL TRBANSMITTER A 155' A X 11 1B YARO-IS' A Bx 4pAE CONDENAS TESTORAGVETAN A Y-r LSS' 11 PE1 YAR-ITS5 B INSTALLED TORNAO MISSILEPROTECON NTHE H-CAN CEAAN DCOVERPLATE DCP AIN S3-19 65QAPAHO867c AWIMTPURG E EOSTAON OUITDE CTLT VALVE A-1., d -2B'/-3 A A PIE A AB- 1 "

6F 11EI-1 B 11pTRAINE

  • 1. SWlS x6J*2 X x 1, SW-167'IM72A x x X HE p16F-R H - C- HEAT EXCHANGER SWDISCHARGE ANEiLia- Bldg. AA00'/215 N I P16 E-J00UR/21- 0CP X() -- 8901 Q~pI~pC*1C WATER PUMP 2C ERVI*N IN S 189'/0A72A A X P6 SW-8810072A I I X REACED PEROLe205157140 70 -IPGV514 SWTO TURRINe BLUG ISOHAXVtONVALVE -ad L155 B X P16 x YARD-155- XIli M1C21*2131611 7L S~1v]

WTO TU RBINE -LDTBAN A ISOeLATION Yard lSSd X p16 x YARD-1S5' x x 1MDC29560 S2QPGV3 WEMERGENCY """""*TON ToPERU Y1rd 115' A - R1 yAxS' B- 1 7 2_P16V5d6 7WDCHARG EFROM AUXiTiARY BUILDG Yard 1.S4 A X P16 YARG-1S5' x (1) 74 OP .P16V* ATRIV D1LByP ad I

]S'. A X Pil x 7 YAR-5SS' X )

x DC 2--93 722P6V1 CPUM PMIN FLOW IBB 18IS AB P16 7 W-1UH' X xll) 7SQP7HI WING CCF HEAT EXCHANGER AuIl0r0-,12'DIS R X P17 21 A*w1O/218S x RE*TURN 1- -RABCI - RI . . L TO.1-A -OMN x 7 A-/2- x A-I., Old, DRE-11L., . II I L, OLRl11O7 CTRANS FORM ER2S AiNIBSlBd 155'/2229 ALL DO-SSHAAN5C X X 187-16DE6A FIR jDOCENETER LAD

-OLOOE-RE SA.-ITSAB I -V-A1AR S

___U- iABZ-fA39'/33 AR-W-1 i xt t~~ X 1 x X

ANE*O*AGE; "f

IANi

  • BI)tV*B'f PI-1 EDI Page 20 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02. VERSION 1.0 95 MARIBR34 POWER DISCONNECTSWITCH Auxil-NBldg. E-N7E-E B x RIA 2 AB-139EN2322 A N RE -RENBOB3 NOV PAWEFRr-ONNECT Auxi-ir

-WICUBldg, LEN17NEN 8 A R11 2 AN-39'/2318 N A

R2SN]1 120VfEGpANEL 2F AuAildy idl 1nE'/23s N X R- 14 AE-139'72318 11 mRAlAE0D INVERTERA2D -Au1wa R., 121E12226 B x X R21 L, AB-121/2226 X N x

9A A2,LU-1 VITAL ACDISTRIBUTION PANEL2D A--liaryRldg. 9'/2ELAN N X RAE 14 A-17S- . RL1 NPEEC:

X SCREWSMISSING ATINTENVAL PANEL RESOLVEBYLASTALLING MINSSNGSCREWS

1. CO.S 4.16101.SWECHGNAR 2XSURGEARRESTOR SWN 1E3-1001A A A .6 N SWENSCANA N A PEI-:

INADEQUATE ANCHORAGEDUETOLOAAE BO AND CRACKEDCONCRETE; RESOLVE By TIGHTENING BOLTSAND CONCRETE REPAIRING CRACX E2R4ALOOTA 101 125VKC DISTRIBUTION NA PANENL AuxlAR BlN. lSS-AN71 A X "1 NA ABESSIN7T E PEE: INTERACTION POTENTIAL FROMADJACENT CVBINET; HLING AESOLVE BYRESTRGENING OR N REMOVINGFILE-ARIANT SEE WE8TEASEA ERVICE UNINV2 WATER BETTERV BAA FVSE -WIS AR7T N A N N EN1E 14 S.ONENLANTA N A

-AS 2.F2ENEA ATEERYCHARGER2A AAAuilidBI. 1E1'EEE4 A X X N RE N EN AN-N11EEA4 x X x REPLACED E PER-P20633147E U0..2R42OP21 BATIERy2B Auxi~layBdg, L21'/22112 B X X X R42 15 AB.12r'/2212 XX EON V2R43AS05 DIESEL ARSKID)

GENERATOA ies-IBId, TESL1.E" B N N N E4N A N 17 ORIIRE'/59 N N A MULTIPLE WON DAS5AN ITEEE SINCE REPORT ETC GER4SEAN SOVUENCEREEC SEECEN1E7 N X X E R43 N 2N AV12E'/2229 N N N EPLACEE PERACP2091575SOA 107ON4AEN2NA SEQUENCER ENFAUX PANEL NWlNrTy Bldg. INN VEINS A N N N RAN 2D A E-139'/2343 NN GOTFRCTION IPEE;PATENTIA WETOCEREAV BESALVE LIGHT; AVERHNEO BYRESTRAINING LIGHT E8 .ER1-E002. SEQUENCER N2GAUX RELAYPANEL NAulir Bid, NEAR 121'/2233 BX NA R43 AB-NEN'/2233 NNOTOY41CNCTD R G RMTB EXHAUST FAN DieI Ed, E 177'M5dE9 N NANB77S X A 141 NNC CAAT NEL41MNUND IES RMERINTAKELAUVER MOTOR DieeIBidg EAAN N NN X TEE A UB-1I5'RE snAt nchoredR.EBIVlne (N)CAopoVneUnt EVNNROnAn such RIawive Page 21 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 1 SEISMIC WALKDOWN EQUIPMENT LISTS UNIT 2 - BASE LIST 2 NO. SNCF164-RPT-02 Equipment List Pages Unit 2 - Base List 1 2-16 Unit 2 - SWEL 1 17-21 Unit 2 - Base List 2 22-23 Unit 2 - SWEL 2 24-26 Page 22 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 Farley Unit 2 SWEL 2 Spent Fuel Pool Related Items NTTF Recommendation 2.3: Seismic Walkdowns Variety of Environments Variety of types of Major new equipment MPL# System/Equipment Description or (21 Classes Variety of Not replcmnt from Systems Submerged Submerged Other equpmnt Appendix B) Location Class #

102G31HOO01A SPENT FUEL POOL HX 2A 031 X 21 AB-155'/2445 2 Q2G31H0001B SPENT FUEL POOL HX 2B G31 X 21 AB-165'/2467 3 Q2G31P002A 2A SFP PUMP G31 X 5 AB-139'/2342 4 Q2G31P002B 2B SFP PUMP G31 X 5 AB-139'/2342 5 Q2G31V001A 2A SFP PUMP SUCT ISO G31 X 0 AB-139'/2342 6 Q2G31V001B 2B SFP PUMP SUCT ISO G31 X 0 AB-139'/2342 7 C2G31V002A 2A SFP HX INLET ISO G31 X 0 AB-155'/2445 8 Q2G31V002B 2B SFP HX INLET ISO J G31 X 0 AB-155'/

9 Q2G31V003A 2A SFP HX OUTLET ISO G31 X 0 AB-155'/2445 10 Q2G31V003B 2B SFP HX OUTLET ISO G31 X 0 AB-165'/2467 11 Q2G31V004A 2A SFP COOLING LOOP TO SFP G31 0 PURIFICATION INLET ISO X AB-139'/2342 12 Q2G31V004B 2B SFP PUMP COOLING LOOP TO SFP G31 0 PURIFICATION INLET ISO X AB-139'/2342 13 Q2G31V005 SFP PURIFICATION OUTLET TO SFP G31 X 0 AB-155'/2445 14 Q2G31V006 SFP COOLING LOOP RETURN (KEY#V- G31 0 141) X AB-139'/2342 15 Q2G31V007 DW TO SFP ISO (KEY#V-231) G31 X 0 AB-139'/2342 16 Q2G31VO08A 2A SFP PUMP DISCH PI-652B ROOT G31 X 0 AB-139'/2342 17 Q2G31V008B 2B SFP PUMP DISCH PI-6520 ROOT G31 X 0 AB-139'/2342 18 Q2G31VO09A 2A SFP PUMP SUCT PI-652A ROOT G31 X 0 AB-139'/2342 19 Q2G31V009B 2B SFP PUMP SUCT PI-652C ROOT G31 X 0 AB-139'/2342 20 Q2G31V017 SFP COOLING LOOP RETURN DRN G31 X 0 AB-139'/2342 21 Q2G31VO21A 2A SFP PUMP CASING VENT G31 X 0 AB-139'/2342 22 Q2G31V021B 2B SFP PUMP CASING VENT G31 X 0 AB-139'/2342 23 Q2G31V022A 2A SFP PUMP CASING DRN G31 X 0 AB-139'/2342 24 Q2G31V022B 2B SFP PUMP CASING DRN G31 X 0 AB-139'/2342 25 Q2G31V023A 2A SFP PUMP SUCT DRN G31 X 0 AB-139'/2342 26 Q2G31VO23B 2B SFP PUMP SUCT DRN G31 X 0 AB-139'/2342 27 Q2G31VO24A 2A SFP PUMP SUCT VENT G31 X 0 AB-139'/2342 28 Q2G31V024B 25 SFP PUMP SUCT VENT G31 X 0 AB-139'/2342 29 Q2G31V025 2B SFP HX HIGH POINT VENT G31 X 0 AB-165'/2467 30 Q2G31V026 2B SFP COOLING LOOP DRN G31 0 AB-139'/ (DEMIN VLV (INACCESSIBLE T/0) X EXCLUSION AREA) 31 Q2G31V027 2B SFP PUMP SUCT LINE ORN G31 X 0 AB-139'/2342 32 Q2G31V028 2B SFP HX OUTLET VENT G31 I X 0 AB-165'/2467 33 Q2G31V029 2B SFP COOLING LOOP DRN G31 0 AB-139'/ DEMIN VLV

_(INACCESSIBLE T/0) I EXCLUSION AREA) 34 Q2G31V030 SFP COOLING LOOP RETURN VENT G31 I 0 AB-139'/2342 Page 23 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 1 SEISMIC WALKDOWN EQUIPMENT LISTS UNIT 2 - SWEL 2 NO. SNCF164-RPT-02 Equipment List Pages Unit 2 - Base List 1 2-16 Unit 2 - SWEL 1 17-21 Unit 2 - Base List 2 22-23 Unit 2 - SWEL 2 24-26 Page 24 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 I)

SWEL Revision Date - 9/18/12 Originator: tAI.,c*A Date: 4 41 -

Originator: [?O*,EZv Wcot t?&c' Date: q I+l '-

Reviewer: Date:,, 1/.-

(j L Ops Reviewer: . LLm.

" b" Date:.Y-1q 17-.

xow"L/

Peer Reviewer: Date:______

Peer Reviewer: , -, ir,- .(

,____ Date:; - . - - __

Peer Reviewer,. - &oqer Date: .

-7 Peer Reviewer: l-'c4GC. "*r. L, _ D ate:______

14

ýi i;-4 14 Page 25 of 26

ATTACHMENT 1: SEISMIC WALKDOWN EQUIPMENT LISTS NO. SNCF164-RPT-02, VERSION 1.0 Farley Unit 2 SWEL 2 Spent Fuel Pool Related Items - Revision Date 9/18/12 NTIF Recommendation 2.3: Seismic Walkdowns Screen #3 Screen #4 Anchorage Variety of check MPL System/Equipment types of Variety of environments required?

Description Major new equipment (50% of or (21 Classes Column B)

Variety of replcmnt from Systems equpmnt Appendix B) Rapid Drain-Down Comments Hydraulic lines connected to the SFP and the equipment connected to Class # Submerged Not Submerged Other Yes No those lines 1 Q2G31P002A 2A SFP PUMP AUX BLDG / 139' / 2342 G31 5 X X 2 02G31VO02A 2A SFP HX INLET ISO AUX BLDG / 155' / 2445 G31 0 X Q2G31VO03B 2B SFP HX OUTLET AUX BLDG / 165'/ 2467 631 3 ISO 0 ix 4 02G31V021B ZB SFP PUMP CASING AUX BLDG / 139' / 2342 G31 0 VENT Page 26 of 26

ATTACHMENT 2: PEER REVIEW CHECKLIST FOR SWEL 1 AND 2 NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 2 UNIT 2 - PEER REVIEW CHECKLIST FOR SWEL 1 AND 2 NO. SNCF164-RPT-02 Page 1 of 3

ATTACHMENT 2: PEER REVIEW CHECKLIST FOR SWEL 1 AND 2 NO. SNCF164-RPT-02, VERSION 1.0 Sheet I of 2 Peer Review Checklist for SWEL for Farley Unit 2 Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Were the five safety functions adequately represented in the SWEL 1 selection? YI] NEI SWEL I for Farley Unit 2 meets the requirementsof having 90 to 120 items and addresses allfive safety functions. Many components provide safety functionsfor multiple systems, and/or are part offrontline support systems. Allfive safety functions discussed in EPRI Report 1025286 are well representedin the SWEL 1.
2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:
a. Various types of systems? YN Nr-Items included on the SWEL comprise a variety of systems such as Emergency Diesel Generatorsand Auxiliaries, Service Water System, Component Cooling Water System, Automatic Depressurization,Residual Heat Removal System, Vital A/C and DIC systems.
b. Major new and replacement equipment? YZ NEI New and replacement components are identified in SWEL 1.
c. Various types of equipment? YZ NEI SWEL 1 includes at least one example of each of the 21 classes of equipment, except Classes 11 (chillers), 13 (Motor Generators)and 19 (TemperatureSensors). These components did not meet the screening criteriafor incorporationin the SWEL as discussed in Section 6 of the submittal report.

All other equipment classes were well represented. In general, the number of components in each class is proportionalto the number of safety-related components of that class in the plant as a whole, except that the number of in-line valves is proportionallysmaller than anchoredequipment. Anchored equipment is more vulnerable to seismic loads.

d. Various environments? YN NO The SWEL contains components in mild, harsh, and outdoor environments. The components are located in different buildings, rooms, and/or on different building elevations. The SWEL also includes components located inside primary containment.
e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program? YN Nr-1 The SWEL included equipment that had been modified as a result of the IPEEE program. Section 5 and Attachment 5 of the submittal report provides information on resolution of the IPEEEfindings. The SWEL and individual component checklists provide information about the IPEEE modifications and verification of modification incorporation.

Page 2 of 3

ATTACHMENT 2: PEER REVIEW CHECKLIST FOR SWEL 1 AND 2 NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of 2 Peer Review Checklist for SWEL for Farley Unit 2

f. Were risk insights considered in the development of SWEL 1? YN NEI SWEL I includes high risk components based on risk significance in the plant probabilisticrisk assessment (PRA) models. Section 6 of the submittal report discusses the risk insights used for SWEL development.
3. For SWEL 2:
a. Were spent fuel pool related items considered, and if applicable included in YE N[1 SWEL 2?

SWEL 2 includes componentsfor maintaining cooling of the SFP, which are Seismic Category I components.

b. Was an appropriate justification documented for spent fuel pool related items not YN NE3 included in SWEL 2?

Section 6.2 of the submittal reportprovides the justificationfor excluding items on SWEL 2. There were no components identified that could contribute to rapid SFP drain down. Note that there were no new/replacement equipment in SWEL 2 because there have been no majormodifications to the Spent Fuel Pool systems that would have affected equipment that meets the screening requirements to be included on SWEL 2.

4. Provide any other comments related to the peer review of the SWELs.

The peer review team reviewed the initialSWEL I and SWEL 2 andprovided comments and suggestions for enhancement of the SWELs. Comments included suggestions to include additionalelectrical components and more equipment mounted to the structure,since such equipment has shown more potential to be adversely impacted by seismic loads than in-line mounted components. In addition, comments were made suggesting that certainequipment classes contain more components and that explanationsbe providedfor not including certain equipment (e. g. there are no safety-relatedor Seismic CategoryI components in that equipment class installed in the plant). The peer reviewers ensured that the SWELs met the requirements of EPRI Report 1025286. Changes deemed necessary during the walkdown due to inaccessibilitywere reviewed by the peer reviewers to ensure that the changes did not impact the level of compliance to the EPRI report. The final SWEL meets all requirements of EPRI Report 1025286.

5. Have all peer review comments been adequately addressed in the final SWEL? YN N[-I el Peer Reviewer #1: Robert Ashworth _14 Pvý Date: 11/05/2012 Peer Reviewer #2: Melanie Brown lp Date: 11/05/2012 Page 3 of 3

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 ATTACHMENT 3 UNIT 2 - SEISMIC WALKDOWN CHECKLISTS (SWCs)

NO. SNCF164-RPT-02 Page 1 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0

  • ~c U:~

Seismic Walkdowti Checklist (SWO)

Equipment ID No. 92CI 1E004B Equip. Classi 2 .......

Enui pment Description REACTOR TRIP SWITCHGEAR NO. 1 Location: Bldg. AUXILIARY Floor El. I2L..__ Room, Area ___..

Manufacturer, Model, Etc.(optibnal but.recommended) . ......

Instructions for Completing Checklist This checklist may be used to document the resuits-oftlie Seismic. Walkdowti of an item of equipnent on the SWEL. The space beloweach of the following qtiestihns may be used to record the resu.rlt ofjudgments and findings- kdditional space is provided at the end of this checklist for documenting other comments, Anchorage

1. Isthe anchorage configuration verificationlreqdired (i.e, is the item one YEI2 ND-of0the,50% of SWEL items requiring such verification)?

2; Is the~atichoage free ofbent, broken, missing ur loose hardware? Y* NO UD N/,D

  • .tŽ .. . . 'J ~~ 7
3. Is ite anchorage free of corrosion that ismn.bred than mild*surface Yf NO:UD1Ni/.D oxidation?
4. Is the anchorage free ofvIsible craloks iii the concrete near the.andhods? Y0" ND' UD0 N`/AD
5. Is the anchorage,6ofifiguration coiistentwith plant docianehbtiaon?. Y [ND UliD N/AD (Not This question only applies* ifithe item is one of the 50% for wmhch an anchorage confir ration veification is ieqtired.)

6 Based on tLIc abr*ve anchorage eiasttonSi* the ale'ichragc fr , ofo YEN, ND potentiallyadverse seismic Londitbons?

Enter di~e luinmei class name from Appndit B: Classe iL Equipiintý Page 2 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet of;3/ o Status-: dN IU0 1iS&eismic Walkdown Checklist (SWC)

E4uipment ID No. 02C.1EOO4B Equip. Classi 2 Equipment Description REACTOR TRIP SWITCHGEAR NO. I Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE3/Nfl U17 NlAF1 8, Are overhead equipment, distribution systems, ceiling tiles and, lighting, YJ NEI Ufi N/AE-and masdonry blockwalls not likely to collapse onto the equipment?
9. Do attached lines have adequate> flexibility to avoid damage?

I 6ý Based on the above seismic interaction evaluations,, is equipment free YEDINF] UE1 of potentially adverse seismic&interaction effects?

,Other Adverse Conditions Ui. Have you looked for and found no other seismic conditions that could YEI NEI U.0 adversely affect the safety functions of.the equipment?

Comments (Additional pages may beiadded as necessary)

Evyaluated by: '-_1 t Date: i Z d .~LI ~t)

Page 3 of 467

A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 4 of 467

0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 5 of 467

T ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 6 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSIONO0 1.0 Page 7 of 467

A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 8 of 467

3 SEISMIC WALKIDOWN CHECKLISTS ATTACHMENT 3: NO. SNCF164-RPT-02, VERSIONO0 1.0 Page 9 of 467

A A-TTIACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 10 of 467

A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 11 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet i ofX Status: Y91\11 Uiii Seismic Walkdown Checklist.(SWC)

Equipment 1D No. Q02E1 Fcvo662B Equip. Clat;s, 8 Equipment Description RHR PUMP MINI FLOW vALVE Location: Bldg. AUXILIARY Floor El. 77 Room, Area 2.17I;r Manufacturer, Model, Etc, (optional but recommended)

Instructions for Completing Checklist This checklist may be used to dobduhent the results ofthe Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings, Additional space is provided at the endof'this checklist for documenting other conr ents.

Anchorage I. Is the anchorage configuration verification required (tie.,is the itemr one YO :N[9 of ther50% of SWEL items requiring such verification)?

2. Is theanchorage free of bent, broken, missing or loose hardware? YE NE UE'I N/A[2Y Z- WE 3, Is the.anchorage free of corrosion that is more than mild surface YE NE U-E1 N/A[e oxidation?

4, Is the anchoiage free of visible cracks in the concrete uear the anchors? YE3 NE UVE N/AEi

5. Is the anchorage configuration consistent with plant documentation? YE NE UE] N/,Ag-(Note: This questiononly applies if the item is one of the 50%.for which an anchoiage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YONEI UiE potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Eqoipement.

Page 12 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 1 .4-Sheet 26fx Status: Ylf N'7 UD3 Seismic Walkdown Checklist (SWC)

Equipment ID No. W2E11FCVOOO2B Equip. Classw 8 Equipment Description RH)RPUMP MiNt FLOW VAL VE _ _

Interactioin Effects

7. Are soft targets free fromi impactbynearbY equipment or structures? Yf[f'Nt] Ut. N/At]
8. Are overhead equipmentdistributin systems, Ceinig tiles and lightiing, Y[Yt]Nt] Ut] N/At];

and masormy block.walls nct:Iikely tteollapse onto the eqdipment?

9, Do attached lines have adequate flexibility to avoid damage? \1t]Nt] UE] N/At]

10. Based on the above seismic interanetin evaluations, is equiptnent free ofpotentially adverse seismic inter~hti~n effects?

Other Adverse, Co*ditions Y0iNt] Ut

11. Have you looked for and found no other ýeismic conditions that could advelsely'affect the safety fmeCtions ofthe equipment?

Comments (Additional pages maybe. added as necessary) r\ Aý Evaluated by: 4 Date:. 4j_5....

.Z Page 13 of 467

0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS O0 NO. SNCF164-RPT-02, VERSION 1.0 Page 14 of 467

A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 15 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 1ofA'÷ ' ./',

Status: YZ ND] UD-Seismic WalkdownChecklist (SWC)

Equipment ID No. Q2EI1FIS602B, Pkq Equip. Class' '18 F2-5 Equipment Descrption RHR PUMP INDICATING SWITCH Location: Bldg., AUXILIARY Floor El. i_ __ koom,,Area 2128 Manrufacturer, Mode, Etc: (optional but-recommended)

Instr*ictions for Completing Checklist Thi s checklist may be used toolcinentie resultsofthe Seismid Walkddwn aifan itemn of equiphifiet of the' SWEL. The:space beloweach of the following questions may be used to record.the results of judgments and findings.Ad0itibnal spaceisprovied at the end ofthis checklist, for documenting other comments.:

Anchoraek I. Is the~anchokage cnfiguration verification required (i:e., isJth6 itetffoim YE0 NZ ofthe 50% of SWEL items requiring such,verification)?

2. is theanacorage free of bent,:broken, migsiriR or loose hardware? YN] NEI UO N/AE
3. Is the anchorage free ofcorosiion that is more thannmidIsutfricd YN NO UE N/AE oxidation?
4. Is the anchorage free 6fvisible:erakks-in.the c6ecrete nearthe anchors? YNf NEI UO N/AE

ý5. Is the anchorage configiaration omnsisterit with *lant.docuinentation? YE NE UE N/An (Note: This questionlonly applies if the iiem is one of the:50% for which an anchorage :configuration. frifiTatioiins required)

6. Based*0n theabove itchotageevaluatiorns, is the anchorage free of Y9 NE U-potentially adverse seismic conditions"?

Enter the epsipitent class nisue tiens Appendi.x:13::Cass~sS ofE quiornenLt Page 16 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of 4" i'j*t, /<

Status: YO NR UFD1 Seismic Wa.lkdown Checklist (SWc)

Equipment ID No, Q2EIIFIS602B.Pkq Equip. Class, 18 F2-5 Equipment Description RHR,PUMP INDICA TING SWITCH Interaction Effects 7;., Are softtargets free'from, impact by nearbyequipmentorstructurs? Y0 Nil U- N/A[]

8, Are overhead equipment, d.istribution systems, ceiling iilesand lighting, YZ NE3 US] N/AE1 and masonry ,blockalls notlikelyto collapse onto.the equipment?

9. Do attached lines haye adequate flexibility to avoid damage? Y0 NR US-1 N/AS]
10. Based on the above seismicinteraction evaluations, is equipment free- YZ NEI UES of potentially adverse seismnic interaction effects?

Other Adverse Conditions

.1. Have you 0ooked.for and found no other seismic conditions that could Y0 NO US adversely affect the'safety functions of thebequipment?

Comments (Addiiionil pages may be: added as necessary)

None This package was #riginallysignedon. 8-224-2 but retyped for plrtyon.i4-21-22.

Evaluwated by> '8tePhen:V'uan'bvTele~co~n.L~ i Date: 8/22/12

Paul A, M hi~ s ~i

......... 8/22/12 Page 17 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 1 of 4 1S Status: Y19. NE U[-L SSeismic Walkdown,.Checklist (SWC)

Equipment ID No. Q2E,1FT0O5B Pk.g Equip. Classr 18 F2-6 Equipment Description, RHR HEAT EXCHANGER DISCHARGE FLOW TRANSMITTER Location: Bldg. AUXILIARY Floor El,. 83 Room, Area 2120 Manufacturer, Model, Etc (opitonal but recommenided) fustructionsfor Completing Checklist This checklist may be used to document the results of theSeismic Walkdown.of an itemn of equipment on the SWEL. The space below each of the following questionsmay beIused to recordthe results-uf judgments and findings. Additional spzce is ptrided at the-end of thischecklist, fbr documenting other comments:

Anchorage

1. Is the anchorage configuration verification iequired,(ix., is the item 0ine YO:NZ of the 50% of SWEL itemns requiring suchxerification)?
2. Is the anchorage freeof bent, broken,i missing ort6ose hardware? YZ NNO UO N/A-31 Is thie anchorage free of orrosion that is more than thildsurface YZ NO UE N/AO oxidation?
4. Is the anchorage freý of visible cradks in the concretenear the anchors? YZ NEI UIE N/AE
5. Is the anchorageconfiguration consistent with plant documentation? YE NO uOI NIAN (Note: This question 0niy) applies ifthe item is. one of the 5"0% for which an anch(nrage conIi uration*verification isrequiredd) 6-. Based on'the above anchorage evaluations, is the anchorage free of Y( NE UE potentially.adVerseseissmic conditions?

Enta . threec~juipnet~ctas sunme~fib Appoittx B: Ctisrýs otlEciaipmentn Page 18 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of4 Status: Yj] .N-]

NO ]

Seismic Walkdown Checklist (SWC)

Equipment 1D No, Q2EI1FT0605B, Pkq Equip. Clawss i8 F2-6 Equipment Description RHR HEAT EXCHANGER DISCHARGE FLOW TRANSMITTER Interaction Effects

7. Are soft targets free from impact by nearby equipment Or structures? YZ NO] U[I N/AO
8. Are overhe:ad equipment, distribution systems, ceiling tilesahd lighting, YO NE uV .NY/A and mashniry block walls hot.likely'to coll*pse 6nto the equipment?

9, Do attached lines haveadequate flexibility to avoid damage? YO NE U1 N/AO

10. Based on theabove seismic interaction evaluations, is equipmentifree. YZ NO] UVEO of potentially adverse seismic interaction effects?

Other Adverse Conditions 1I. Have you looked for and found no other seissmicconditions~that could YI No] uE]

adversely affect the safety functions of the equipment?

Cornmments (Additional pages may be added as necessary)

-Thispackage was originally sijned on. 822,12 but retyped for clarity on 10-15-12.

Evaluated by: Paul Miklus e.  ; loll 7 Date: 8/22/12 S3te-en Yuan bv Telecon 8122112 Page 19 of 467

A 0 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 20 of 467

3 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION ql Page 21 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 1 of/

Status: YIT NIE] U1-2 Seismic Walkdown Checklist (SWC)

Equipment ID No. 02EIIHOOIB - Equip. Class' 21 Equipment Descripiion RHR HEAT EXCHANGER 2B Location: Bldg. AUXILIARY Floor El. 83 Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end ofthis checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification requhied (i.e., is the item one Y9* NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y2'ND UD NIAD
3. Is the anchorage free of corrosion that is more than mild surface YE*KN UO N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YQI'/N UO N/A1
5. Is the anchorage configuration consistent with plant documentation? Y[E/NO UO N/A-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

g* .*tjgd,tc/t /29/s9# "e*Qtrwtl4v *Ftt$&6,

6. Based on the above anchorage evaluations, is the anchorage free of Y[ N[I UD]

potentially adverse seismic conditions?

I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 22 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2,Of,.

Status: Yý'NF- ULr Seismic. Walkdown- Checklist (SWC),

Equipment [DNo. 02EIIHOOIB Equip; Class, 21 Equipment Dscriptioni ,RH jHEAT EXCHANGER 28 interaction.Effects

7. Are sofitargetsfree from impact by-nearby equipment or structures? 'Y TNL1 U0 N/AEO
8. Are overhead equipment, distribution systemns ceiling tiles and lighting, Y/E]Unj N/AE]

and masonry block Wa Ils~not likely to collapse onto the, equipment?

9. Do attached lines have adequate flexibility tf avoid damage? YE/NEY UJ] NT/AE
10. Based on the above.seismic interaction evaluations, iseqUipment free YeN3Un of potentially adverse seismic interaction effectS?

other Adverse Conditions

11. Have you looked forand found nboother stismiic conditions thatrebuld YIgYNK Un.

adý/ersely.fiecttihe safety functions of the equipment?

Coemm.ents (Additi0Ial page 'suy be added as necessary)

Evaluated by: [ . Date: I"_-__________

Page 23 of 467

A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 24 of 467

0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 25 of 467

S ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 26 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet I of 31 status :Yd ND uFi Seismic Walkdown.Checklist (SWC)

Equipment ID No, Q2EIfLQ3594A Equip, CIass!,18 ____ .

Equipment Description CTMT SUMP LEVEL TRANSMITTER POWER SUPPLY Location: Bldg. AUXiLIARY Floor El. 139 Room, Area ý 3 1 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to doeument. theresults of the Seismic Walkdown of an item ofequipmenton the SWEL. The space below each of the following questions maybe.uged toi-cord the results ofjiidgmeiits and findings. Additional space is provided atthe end of this chiecklist for documenting other;comments.

Anchorage I. Is the anchorage configuration verification required (je, is theeitem one YE] NQ' ofthe,50% of SWEL items requiring such verification)?

2, Is the anchorage free of bent, broken, missing or loose hardware? Yeý NEI: LTE NIAE

3. Is the anchorage free of corrosion that is more thati mild surface YE'NE] UE] N/AE]

oxidation?

4: Is the anchorage free, of visible eraeksin the concrete near the andcihrs?. Y NE] UE] N/AE]

5. is thaeanchorage configui-ation conmitfent with plant documentation? YE] NEI ulE NIAV*

(.Note: This question only applies if ihe:iiera is one of ihe 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is~thc anchorage free of YF4 NE] UE potentially adverse seismic conditions?

,Enterthe equiliment class name fron Appeidix B: Classes of Equipi'ent.

Page 27 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of,3 Stats: N17 UL]

Seismic Walkdown Chiecklist (SWC)

Equipment ID No.. '02E1.LQ3594A Equip. Class :18 Equipment Description CTMT SUMP.LEVEL TRANSMITTER POWER SUPPLY . "

Interaction Effects 7.. Are soft targets free from impact by nearby equipmCent or Structures? Y[ Nf I UL] N/A[]

S. Are o-verhead equipment, distribution systems,.ceiling tile~sand ligting, YrZf Nfl uO- Nw/At]

and masonry block walls not likely to collapse ontodthe eqjuipmeuent?

9, D0oattaclind hifes havd idequate flexibility tiav did' damage? 'dN7U11 NiAE]

10. Based ontheeabove seismic interaction evaluations, is equipment free, Y~j NLI Ut])

of potentially adverse: seismic interaction effects?

Other Adverse Condiions

11. Have you looked.fOr and found no otiler seismicconditions that could' YO'NE] Ut]

adversely affect the safety functions of the equipmenit?

CommentS'(Additional pages may be added as necessary)

. . . c-Evaliated by: '~ ~s~,1 2j~iiiII) Patc., VI lo,-

I J~~~

Page 28 of 467

A 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 29 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 17:ý7a - 5?

Page 30 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Shtest* ofy Status: YE'/ND- UFý Seismic Walkdown Checklist (SWC)

Equipment ID No. 92.1 1M0V8706B Equip. Class' 8 Equipment Description RHR LOOP NO. 2 DISCHARGE TO CVCS Locatioiu Bldg. AUXILIARY Floor El. 83 Room, Area Manufacturer, Model, Etc: (optiondl but recommended) . ......

Instructions for Completing Checklist This checklist may be'used to dcument .the results of the Seismic Walkd0\xn:of an item of equipnient on the.

SWEL.The space below each of the following questions may be used to record the results ofjudgments and, findings. Additional space is proVided 4,t the end of this checklist for documenting ,othercomnments.

Axichorage I Is the anchorage configuration verification required (ije,, is the item one YO] N&'

of the 50% of SWEL items requiring such verification)?

21 Is the anchorage free of bent, broken, missing or loose hardware? YE] NEn UDo N/At

3. is:the:anchorage free ofcorrosion that is more thaninild surface oxidatiotn?

YE] NO UE]- N/Au";

4. Islthe anrchbrage frre,of visible cracks in the concrete near ihe anIchors?

YO NO ...

52 Is the anchoragecoufiguration consistent with plant documentation?

(Nole:: This questiowohly applies if~the iteiln is one ofthe 50% fbr which an ancl6i6tgd ionifiiiratioi veiificatibn is required.)

6, Based oii the above anchorage evaluations, is the anchorage free of potentiailly adverse seismic conditions?

Entier, the eq-iphit:ndats innmc fron Appendix'B: Clasws (f Eqiiipmert.

Page 31 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Shee~t 2 Of/' 4L Status: Y KNEI ull

'Seismic Walkdown Checklist (SWC)

EquipmentID No. Q2E11MOV8706B- Equip. Class'- .

EquipmentDescription.RHR L.LOP NO. 2 DISCHARGE TOCVCS Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? N1UE3 N/1A0 Y

.8. Ate overhead equipment, distribution systems, deiliigtiles and lighting, YEYNE1 LIE] N/ADl and masomny block walls not likely to collapse onto the equipment?

9ý Do attached ines have adequate flexiiility to .avoid damage?

YEE(NEI UL- /A

10. Based on the abovescismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?,

YfdNE] UE]

Other Adverse Conditions.

IL Have you looked for and found. no other seismic conditions that could adversely affect the salaety fu~ictions ofihe.equiipment?

Comments (Additibnal pages may be added as n*cessary)

Evaluatedby,:._______________________ - .,Dame 5,------------------------------Pa -výv Page 32 of 467

A 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 TI Page 33 of 467

A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 10 Page 34 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 ShoetN[Y]

s ofi U "

Status: Y:] NO] UF!]

Seismic Walkdown Checklist (SWC)

Equipment.11) No. Q2E11MOV8809B, Equip. Classi 8 Equipment Description RWST TO RIR PUMP2B SUCTION.

Location: Bldg, AUXILIARY Floor El. 77 Room, Area Manufncturer, Model, Etc, (optional but recommended) instructions for Completing Checklist.

This-checklist may be used to document the results ofthe S ismic Walkdo~whobfan item of equipment o0i the SWEL. The space below each:of the following questions:may be used to record the results ofjudgments and findings. Additional space is provi.ded at the end of this checklist for documenting other comments.

Anchorage I fsthlie anchorage coniigutration Verification requiredd (i.e, is the'item one YE NM/

of the 50% ofSWEhitems requiring such verification)?

2. Is the anchorage free ofbent, broken, missing or loose hardware? YD NE U NIA ?

INS4 1 UF

3. Is the~anchorage free ofcoirbsionthat is more than mild surface YCE, NE Ui* N/AC9 oxidation?
4. h the ainchorage free of visible cracks in the concrete near the anchors? YD NE UE] N/AW
5. Is the anchorage configuration consistent with plant docnmentation? YEI NEI UE-: NWAU1 (Note: This question only applies if (he item is one of the 50% for which an anchorage configuration.verification is required')
6. Based on the above anchorage evaluationsjis the anchorage free of Y[V NE UEo potentially adverse seismic conditions.?

'Ent .ertheccquipment class nasianeo kiAnpandixtB: Classe of Equinment.

Page 35 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 0f "i-Status: 91 NW UE]U 511t V Seismic Walkdown Checklist (SWC)

Equipment ID No, 02E11MOV8809B Equip. Class! 8 =___

Equipment Description RWST TO RHR PUMP 2B SUCTION .

Interaction.Effects

7. Are soft.fargets free from impact by nearby equipment or structures? Y2'/NC u[] N/AC
8. Are overhead equiument. distribution systems, ceiling tiles and.lightingi YIZ NO UC N!A-and masohry)block walls'not likelyto collapse ontothe equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y9 NF1 LJC[NiAC
10. Based oti the above seismic interaction evaluations; isequipment free Y1NEI U-1 of potentially adverse seismic interaction effects?

Other.Adverse Conditions 1]. Have you Jooked for and found: no other seismic conditions that could Y4 No U[

adversel'y affect the safety fuhctions of the equipinent?

Comm.ents (Additional pages may be added as aecessary)

,Peo Evaluated by:._ A2)1

( &VI Date: 6ý-

'gZ-n -o Page 36 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 rn-441 Sheet I ,

status: YE-NO1 U[-]

SeisMic. Walkdowni Checklist (SWC)

Equipnerit1D No, Q2E11MQV88 12B Equip. ClassI 8 Equipment Description ctMT-SUMP TO HR PUMP2B ISOLATION Location: Bldg. AUXILIARY lo .l.... Rooms, Area 2129 Miuiufactmueii, Model, Etc. (optional but iecommended)

Ins, uction... . Co....t.ng

.. C- I . ... .. ..

Thi'chegcktit may beused to d1cument the ThSuts.f the SeismriWalkdown ofan .,tetn of equiprent on tIhe SWEL. The spacebebow eah ,ofJte foloing questionVs may be used toreeid the tesultS of judgimnts and findings, Addiional ip;sace is*provided at the: end o;f thk. checklisi for documenting other commentss,

Anchorage
1. Is the anchorage configuration verification required (i.e., is the item one YQ ofxthe,50% of SWEL items reqitiring such verification)?:

2.. Is the.anchorage-free: of6bent, broken, missing or !oose-hardwa.6? YrI NEI Uo N/A* *..*

uV-L'4I O1A/6I

3. is the anchorage free of coro ion t atis more than mild surface YCO No. Vo oxidation' 4z Is .the anchorage free of visible crddks in the concrete near~ the anchors? Yo NUJ U0 IA'
  • 5. Is the anclhorage cofifiguration consi stent with pltInt documentatiibi? YOJ No~ U0,1A--1 (Note: This question only applies- {Ifheitem is ine of t)e 50% for w~hich.an anchorage configuratiiOni veijfication is required.)
6. Based on the above anchorage evaluations, is'the anchorage free of 'AnNEJ to potentially:adverse seismic tonditons?

Enter ttis~equipm~lit class ilmme from Appoiedix:13: Ctasseý of.Fquipment, Page 37 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of:.4i A-Status: Y[' NEI U-;

Seismic Walkdown Checklist (SWC)

EquipmentJ DNo. 02E1iMOV88 128 Equip. Class', 8; Equiipment Descriiption CTMT SUMP TO RHR PUMP 28 ISOLA TION Interaction Effects

7. Are soft targets free from impactbynýearby~equipment or structureis?

Yý (Nl1 UO N/AEIý

8. Are overhead equipment, distrilf;ution systems, cei.lig tiles and lighting, ahd masoni-y block walls not likely to collapse onton the:equipment?

Yg NFJ UE N/ACIJ

ý9: Do attached lines have-adequate.flexibility to avoid damage?

Y/NCE IJElNE

10. Based on the aboveseismic interaction evaluationss is equipmentfree
  • pdtehtially of adverse .eisrmc interaction effedts?

Other Adverse Conditions I],. Have you looked for and found no other seismic conditions that could YLý/N/]U 0 adversely affect.the safety functions of the equipment?

Commfiients'(Additional pages may be added as necessary)

Evaluated by: Date: ,23 2O07*

4'~e('u4" f( Io i". . _ _ __ _ _

Page 38 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 39 of 467

A 0 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 40 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Siieeti of 3 Stat~us: .Z N] UM Seismic Walkdown Checklist (Swc)

Equipment ID No. Q2E1 A4OVB888 Equip, Class, 8 Equipment Description, LHSt TO RCS'COLD LEG -- _-_-------

Location: .Bldg, AUXILIARY FloorEl:. 121 Room, Area. __-_ _

Manufacturer, Model,' Etc. (optional but'reornmenddd)

,Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipmdent on the SWEL. The space below each of the following questions mayvbe used-to record the results of judgpments and findings. Additional space is provided at .the endof this checklist for documenting.other eominiets.

Anchoraee

1. Is the anchorage configuration verification required (i.e., is the item one/ N of the 50%,of SWELitems requiring such verifietwion)?
2. Is the anchorage free of bent, broken, missing or loosethardware? YD] NFI UE] NIA/

3.Is thenchoage free of corrosion that ismore than mild surface YE] NE] UE] N/A{f oxidation.?

4, Is theanchorage free ofvisible cracks in dhe concretenear the anchors? YE] NE] U[]

5. Is the anchorage configjuration consistent with plant documentation?. YE ,NE UE] .N/AW" (Note: rhis question.tnly applies if the itemris one t.flhe50% for which an anchorage configuration verification is require)d)
6. Based on the above an.!horage &valuations,is the anchorage free of Y* NE UE potentitAlly aerse 'cismic, conditions?

Entr tie tpt ci'luipme Fuain App dix 13:Oisekof Equipuent.

Page 41 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheetd.of3 Status. Y NF] u[t Seismic Walkdown Checklist (SWC),

Eqpipment .I No.. 02EtI MOV8888B _Equip. Class 8 .

Equipmeni Description LHS1 TO RCS COLD LEG Interaction Effects

7. Are soft targets free fro0mimp act by nearby equipment or:structures? Y!ND 01:1 N/Afl
8. Are oyerhead equipment, distribution systems, ceiling tilbs and lighting, YEýX3E iE] N/ADl and inofory block Walls not likely to collapse ono tlhe equipment.L
9. Do attachod lines have attnuate Mle,dxibiiity to a-void otagti. Y~'ýfNEl VjEJ N/ADn
10. Basedbon thie above seismic int*raction evaluationsi is equipment free Yl~*/N1 U13 of potentially adverse. seismic interaction effects?

Other Adverse Conditions i1; Havey.¢ou looked. for and f6ind. no other seismic conditions that couid Yf:NDNUO adv*,fsely affect the safety functions of the equipment'?

Comments (Additional pagesmay be added:as necessary)

Evalnate4 by, Kil/

ffIA$N xsc~7 M 6/2.

1D~

Page 42 of 467

E ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 43 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet i of/

Status: Y* Nf2U' Seismic Walkdown Checklist (SWC)

Equipment IID)No. Q2E11P01B. FPquipl.. Clas _6 Equipnient Description R.HR ffLLM4F.28 ............... ..... _.. __

Location: Bldg. AUXILIARY Floor El. 83 .. Room, Area 2129 Manufacturer Model, Etc: (optional but recommended)

Instructions: for Completing Checklist This,checklist mayge *ised t ddocument, the results of the Seismnie Waukdown of - item of equipment on the SWEL. Thi4 space below each of the folloWing questions may be used to rdcbrd the tesulis ofjti dtgments and findings. Additional spaceis provided'at the end'of this clhecklist-for documentingbther comments.

1. Is the anchorage configuratjion verification required (i.e, is the item one YoýND-1 of the 50%"'f SWEI, iltems rcquiringsuch verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YVNK] D,!JC N/AD-
3. Is the anchorge tre of crrosion that is,inore thanmild surface yvý'N' ULD N/1AD o~tiiation7
  • 4. fsthe anchoragýe fee of visiblc cracks in the concrete nearl-he anchors? Y. N0 UCIDN/AD
5. Is iheanctorage configuiration consistent With plant documentation? YDI No<KD N/AD].

(Note: This qruestion onlv applies if tie, item iSone of thed50% for which.an anchorage conftiguration verification is required.)

6. Based on the ab*.e anchytorage evaluaiions, is the anchorage free o4 y -c ur-D po ad"'s- seismic conditions?

EThCf h~eeqeiprneni dss fme from.4p~edi B; Clar.s Of Bquipmitm Page 44 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Shee tof9, 5

Status,:, Yo I E Seismic Walkdown Checklist (SWC)

Equipmnent ID.No. 02E1 IPOO18 Equip. Class, 6 Equipment Description RHR PUMP2_

Interaction =Effects

7. Are soft.targets fite from impact by nearby.equipmentor stIructures? YdN'ND UD NIAfl
8. Are overheadequipitnt,:distributon systems, ceiling tiIs and lighting, yfN!- UEJ N/Arj and inasonry block walls not tikely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoi~d damage? YO'/D UO] N/AD

-r~o 1' A4 'Oe. j's M

10. Eased on the above, seismic interaction evaiuations, is equipment free YO 4 ND UD of potentially adverse seismic interaction effects?

Other Adverse Conditions II, Have you looked forand found noother seismrio.condiuions that could CLINE3UE adversely affect the safety fuiinctions of the equipment?

Comments (Additional pages may be added as necessary)

,-/v' 1 r/.1L ( jp Evaluated by: kl,,14' j Date:

C?~

Jt -Ahjl I&

)

i /

/

zo

.~

Page 45 of 467

A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 46 of 467

A 0 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 47 of 467

0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 48 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet i of A,"2- **,

Status: YN Nnl U((] Un , Ip/

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E13PT0953. Pk, Equip. Class, 18 F2-17 Equipment Description CTMT PRESSURE PROTECTION TRANSMITTER Location: Bldg. AUXILIARY Floor El. 121 Room, Area 2223 Manufacturer,'Model, Etc..(optional but recommended)

Instructions for Completing Checklist This:checklist may be used to document the results of the Seismic Walkdown of an item of equipment on.the SWEL. The space below each of the following questions maybe used to,record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (ixe., is the item one. Yr-J NZ of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEI UIJ N/AlD The answer to question #2 is yes. This question was further discussed with. Taylor Youngblood on:9-43412 and the team was confident that the transmitterwas free of bent, broken, missing hardware.
3. Is the anchorage free of corrosion that is more than mild surface YZ NMO1 UEJ N/AQ oxidation?

Yes. There is no evidence of cbrrosion on the transmittersupports.

4. Is the anchorage free of visible cracks in the concrete near'the anchors? YZ NO UO] N/AE-There were no cracks in the concrete near the support of the transmitter.
5. Is the anchorage configuration consistent with plant documentation? Yo NOi U] N/AS (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NO U0 potentially adverse seismic conditions?

Yes IEnter th6 equipment class name from Appendix B: Classes of Equipment.

Page 49 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 o[,4 ;4 1 41f Status: YX N[D UD]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2E13PT0953, Pka Equip. Class, 18 F2-17 Equipment Description CTMT PRESSURE PROTECTION TRANSMITTER Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[D NEI UC N/AC
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZI NCi UI N/AO and masonry block walls not. likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y9l NC UO N/AC
10. Based on the above seismic interaction evaluations, is equipment free YE NFI UO of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no otherseismic conditions that could YZ NC. UO adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

See component Q2E1 1MOV8888B.

This package was originallysigned on 8-23-12 and revisited between the team and Taylor Youngblood on 9-13-12. Subsequently, it was retyped for clarity on 10-15-12, Evaluated by: Maggie Farah *i ff I '% -Date: 8/23.112 atw&i/(t444'/.tl4 Ron' Miranda &~j 7l/ 6j, ~ftrW2.

Page 50 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet I of 4 Status: YO NE! UL Seismic .Walkdown Checklist (SWC)

Equipment lDNo. Q2E6HOOIC, Pkqo Equip. ClaSs' i0 F2-18 Equipment Description CHG/HHSI PUMP ROOM COOLER 2C Location:'Bid,. AUXILIARY Floor E.L 100 Room Area 2173 Manufacturer, Model, Etc. (optional'but recommended) .... _...

instructions for Completing Checklist This checklist may be, used to document the results of the Seismic Walkldown of an iterm of.equipment on the SWE[,. Thet space bllow each of the followifig quiestions may be used to record thie results ofjudgm i iits and findings-Additional space is provided at the:endo.fthis' checklist for documenting other coinmerns.

Anchorage E Is the, anclhoage cotfiguratiodn verification required (i.e., is the itemione, Y NO of the*e o50%of SWEL items.requiring such verification)?

2. Is the anchorage free of bent. brokden, miissing or loose hardware?. YZ NEI UF] N/AO The answer to question #2 is yes. This question was further discussed witht Taylor Youngblood on 943-12 and the team was confident that.the transmitterwas free of bent, broken, missing hardware..
3. isthe anchorage free.of corrosion that is more than mild surface YO NOl UF N/Ar-l oxidation?

Yes. There is ho evidence Of corrosion oný the'transm~ttersupports.

4": Is the anchforage free of visible craicks in the concrt netear the anchors? Yfo Nti ufi N,/Arl There were,no cracks.in the concrete near the suppori of the transmitter.

5' Is the anchorage configuration..consistent with plantdbocumentation? Y1Fl NOl UOE N/AZ (Note: This 4deftion only applies if the item i's one of the 50%.for which: an'anchorage onfiguration ierificatioh is required;),

6. Based on th'e above anchorage evailuations, is the an hotage free of YZ NOl Uf potenitially adverse seismic conditions?

Yes

'Enin ihecquip me roiAtpi~idix dies nani it 8::C.tasssof.Equiplnent' Page 51 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of 4 Status: YN NI UEI Seismic Walkdown Checklist (SWC)

Equipment ID No.. 02E16HOOIC, Pka Equip. Class' F2-48 Equipment Description CHfG/*H/ PUMPP ROOM COOLER 2C Interaction Effects.

7. Are soft targets free from impact by nearby equipment or structures? Y& NE] U[] N/At]

S. Are overhead equipment, distribution systems, ceiling tiles and lighting, YOl NO] Uit] N/At and masonry block wpils not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to0avoid damage? YN NEt UOt N/At]

l0, Based~on the above seismic is teraction evaluations, is equipment free YZ NEI Ut]

of potentially adverse seismic interaction effects?

Other Adverse Conditions I.EHave you looked for and tbund no other seismic conditions that could Yo Nt] Ut]

adversely affect the safety functions of the equipment?

Cotmments (Additional pages may be added as necessary)

Onitially) unable to access the equipmernt for adeqaute review without fall porotection. This paickage-wasoriginally signed on 8-22-12 and revisitedby the team on 9-13-12. Subsequently, it was retyped for clarity on 10-15-12.

Evaluated by: Tenv A. Mullenix ' otJ l Date; 8/22/12

" aura'Maclay* U . .8/22/12 M7 Page 52 of 467

A A'I-IACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 53 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 54 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 55 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 56 of 467

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 57 of 467