Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML21214A318 | 2 August 2021 | 301 Comments | Fire Protection Program |
NL-20-0034, Inservice Inspection Program Owner'S Activity Report for Outage 1R29 | 17 January 2020 | Inservice Inspection Program Owner'S Activity Report for Outage 1R29 | Through-Wall Leak |
NL-17-1713, Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure | 6 April 2018 | Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure | Through-Wall Leak |
NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B | 14 December 2017 | Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B | |
NL-16-2541, Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results | 29 November 2016 | Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results | |
NL-16-0810, Submittal of Post Accident Monitoring Report | 9 June 2016 | Submittal of Post Accident Monitoring Report | Post Accident Monitoring |
NL-16-0683, Special Report No. 2016-002-00, Alternate AC Source Out of Service | 2 June 2016 | Special Report No. 2016-002-00, Alternate AC Source Out of Service | |
NL-16-0751, Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C | 23 May 2016 | Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C | |
ML15253A410 | 11 March 2016 | Enclosure 2 Screening Analysis Report | Ultimate heat sink Tornado Missile Fukushima Dai-Ichi Earthquake Generic Issues Program |
NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 | 23 December 2015 | Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 | |
NL-15-1489, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-1208 | 17 August 2015 | 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-1208 | |
ML15182A175 | 26 June 2015 | Completion of Required Action by NRC Order EA-12-051 Reliable Spent Fuel Pool Level Instrumentation | Boric Acid FLEX Spent Fuel Pool Instrumentation Fire Protection Program |
ML15106A310 | 17 April 2015 | April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing Analysis | High Radiation Area Minimum staff |
NL-15-0418, Revision 6, Pressure Temperature Limits Reports | 5 March 2015 | Revision 6, Pressure Temperature Limits Reports | Hydrostatic Pressure and Temperature Limits Report |
NL-15-0080, Special Report 2015-001-00 | 26 January 2015 | Special Report 2015-001-00 | |
NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 | 8 December 2014 | Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 | |
NL-14-1109, Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) | 26 August 2014 | Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) | FLEX Spent Fuel Pool Instrumentation |
ML14128A083 | 3 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 | Unanalyzed Condition High Radiation Area Ultimate heat sink Operator Manual Action Fukushima Dai-Ichi Earthquake |
ML14101A119 | 16 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
NL-14-0145, Proposed Alternative for the Fourth Lnterval Lnservice Inspection (FNP-ISI-ALT-14, Version 1.0) | 18 February 2014 | Proposed Alternative for the Fourth Lnterval Lnservice Inspection (FNP-ISI-ALT-14, Version 1.0) | Grace period |
NL-13-1936, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B | 30 September 2013 | 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B | |
NL-13-0954, Proposed Path to Closure of Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance. | 16 May 2013 | Proposed Path to Closure of Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance. | Coatings Job Performance Measure |
NL-13-0171, Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation. | 27 February 2013 | Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation. | FLEX Spent Fuel Pool Instrumentation |
ML13004A262 | 26 November 2012 | SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4, Page 64 of 143 Through Page 129 of 143 | Scaffolding |
ML12355A787 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 374 of 561 - Page 415 of 561 | |
ML12355A786 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 331 of 561 - Page 373 of 561 | |
ML12355A785 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 284 of 561 - Page 330 of 561 | |
ML12355A784 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 234 of 561 - Page 283 of 561 | |
ML12355A783 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 184 of 561 - Page 233 of 561 | |
ML12355A782 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 141 of 561 - Page 183 of 561 | |
ML12355A781 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 104 of 561 - Page 140 of 561 | |
ML12355A780 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 103 of 561 | |
NL-12-2266, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 561 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 561 | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operating Basis Earthquake Fukushima Dai-Ichi Earthquake Scaffolding |
ML13004A263 | 26 November 2012 | SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4, Page 130 of 143 Through End | Scaffolding |
NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 71 of 161 - Pag | 26 November 2012 | Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 71 of 161 - Page | Scaffolding |
NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 1 of 161 - Page | 26 November 2012 | Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 1 of 161 - Page 7 | Scaffolding |
NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 1 | 26 November 2012 | Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 103 | |
NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 561 | 26 November 2012 | Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 561 | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operating Basis Earthquake Fukushima Dai-Ichi Earthquake Scaffolding |
ML12355A789 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 445 of 561 - Page 482 of 561 | |
ML13004A261 | 26 November 2012 | SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 431 of 467 Through Attachment 4, Page 63 of 143 | Scaffolding |
ML13004A260 | 26 November 2012 | SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 373 of 467 Through Attachment 3, Page 431 of 467 | |
ML13004A258 | 26 November 2012 | SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 307 of 467 Through Attachment 3, Page 372 of 467 | |
ML13004A257 | 26 November 2012 | SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 232 of 467 Through Attachment 3, Page 306 of 467 | |
ML13004A256 | 26 November 2012 | SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 177 of 467 Through Attachment 3, Page 231 of 467 | |
ML13004A255 | 26 November 2012 | SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 123 of 467 Through Attachment 3, Page 176 of 467 | |
ML13004A254 | 26 November 2012 | SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 58 of 467 Through Attachment 3, Page 122 of 467 | |
ML13004A253 | 26 November 2012 | SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 1, Page 1 of 26 Through Attachment 3, Page 57 of 467 | Safe Shutdown |
NL-12-2267, SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 46 of 46 | 26 November 2012 | SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 46 of 46 | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operating Basis Earthquake Fukushima Dai-Ichi Earthquake Scaffolding |
ML12355A795 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 118 of 161 - End | Scaffolding |
ML12355A794 | 26 November 2012 | SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 71 of 161 - Page 117 of 161 | Scaffolding |