ML042660135

From kanterella
Jump to navigation Jump to search
August 2004 Monthly Operating Report for Pilgrim Nuclear Power Station
ML042660135
Person / Time
Site: Pilgrim
Issue date: 09/09/2004
From: Ford B
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML042660135 (2)


Text

Xg- E Entergy Nuclear Operations, Inc.

' Entergy Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 September 9, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 August Monthly Operating Report LETTER NUMBER: 2.04.080

Dear Sir or Madam:

In accordance with Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning.

There are no commitments contained in this letter.

Should you have questions or comments concerning this report, please contact me at (508) 830-8403.

Sincerely, BaF Bryan Ford Manager, Licensing MJG/dm

Attachment:

August Monthly Operating Report (1 page) cc: Mr. Samuel J. Collins Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 204080 fC2cj

OPERATING DATA REPORT DOCKET NO. 50-293 UNIT NAME Pilgrim 1 DATE September 06, 2004 COMPLETED BY Mary J. Gatslick -

TELEPHONE (508) 830-8373 REPORTING PERIOD: August 2004

1. Design Electrical Rating 690.00
2. Maximum Dependable Capacity (MWe-Net) 684.70 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,809.58 195,964.48
4. Number of Hours Generator On-line 744.00 5,792.92 193,737.87
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 507,668.61 3,952,187.27 115,604,865.7 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The period began and ended with the unit on line, operating at 100% power (2028 MWt). There were no power reductions during this reporting period.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1