E-Atr a Etergy Entergy Nuclear Operations, Inc.
Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 March 8, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 February 2004 Monthly Operating Report LETTER NUMBER:
2.04.022
Dear Sir or Madam:
In accordance with Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning.
Should you have questions or comments concerning this report, please contact Mr. Bryan Ford at (508) 830-8403.
Sincerely, Step n.
ethay Director, Nuclear Assessinent MJG/dm
Attachment:
February 2004 Monthly Operating Report (1 page) cc:
Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector
, 70--2,4' 204022
4 OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-293 Pilgrim 1 March 03, 2004 Mary J. Gatslick (508) 830-8373 I -
ID:
February 2004
- 1. Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 690.00 684.70 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 696.00 696.00 0.00 479,839.04 Yr-to-Date 1,440.00 1,440.00 0.00 992,808.88 Cumulative 191,594.90 189,384.95 0.00 112,645,487.3 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- The period began and ended with the unit on line, operating at 100% power (2028 MWt). There were no power reductions during this reporting period.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:.
1 Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of 1