ML022040472
| ML022040472 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/11/2002 |
| From: | Riggs W Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2.02.068, TS 5.6.4 | |
| Download: ML022040472 (3) | |
Text
Entergy Nuclear Operations, Inc.
SEn tergy Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment July 11,2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 JUNE 2002 Monthly Operating Report LETTER NUMBER:
2.02.068
Dear Sir or Madam:
In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have questions or comments concerning this report, please contact Jim Haley at (508) 830-8143.
Sincerely,.Y)
W.J. Ri/
JRH/dd
Attachment:
JUNE 2002 Monthly Operating Report cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 202068
'- 1/1-ý
Attachment OPERATING DATA REPORT DOCKET NO.
50-293 UNIT NAME:
Pilgrim DATE:
July, 2002 COMPLETED BY:
J. R. Haley TELEPHONE:
(508) 830-8143 Design Electrical Rating (MWe-Net):
655 Maximum Dependable Capacity (MWe-Net): 653 REPORTING PERIOD:
JUNE 2002 (Month/Year)
Hours in Reporting Period Number of Hours the Reactor was Critical Number of Hours the Generator was On Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)
MONTH 720.0 720.0 720.0 0.0 460,816.1 YEAR TO DATE 4,343.0 4,343.0 4,343.0 0.0 2,879,362.7 CUMULATIVE 259,103.0 178,818.8 173,598.8 0.0 103,785,789.7 202068
[1]
[2]
[3]
[4]
[5]
DOCKET NO.
NAME:
COMPLETED BY:
TELEPHONE:
REPORT MONTH:
50-293 Pilgrim J.R. Haley (508) 830-8143 JUNE 2002 OPERATIONAL
SUMMARY
The plant entered the reporting period at approximately 100 percent Core Thermal Power (CTP) where it was maintained until June 7. At 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />, a power reduction was commenced to approximately 47 percent CTP to perform a backwash of the main condenser. The reactor was restored to 100 percent CTP at 0818 hours0.00947 days <br />0.227 hours <br />0.00135 weeks <br />3.11249e-4 months <br /> on June 9. A second backwash of the main condenser was commenced at 0012 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> on June 16 to approximately 50% CTP. The reactor was restored to 100% CTP at 0330 hours0.00382 days <br />0.0917 hours <br />5.456349e-4 weeks <br />1.25565e-4 months <br /> on June 17 where it was essentially maintained through the end of the reporting period.
UNIT SHUTDOWNS METHOD OF CAUSE/CORRECTIVE ACTION/COMMENTS NO.
DATE TYPE DURATION REASON SHUTTING 1
(HOURS) 2 DOWN REACTOR 3
1 2
3 F - Forced S - Scheduled A - Equip Failure B - Main or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Admin G - Operation Error H - Other 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continuation 5 - Other 202068