ML040510492

From kanterella
Jump to navigation Jump to search
January 2004 Monthly Operating Report for Pilgrim Nuclear Power Station
ML040510492
Person / Time
Site: Pilgrim
Issue date: 02/13/2004
From: Bethay S
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.04.012
Download: ML040510492 (2)


Text

AdEntergy Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 February 13, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 January 2004 Monthly Operating Report LETTER NUMBER:

2.04.012

Dear Sir or Madam:

In accordance with Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning.

Should you have questions or comments concerning this report, please contact Mr. Bryan Ford at (508) 830-8403.

Sincerely, Stephen J. Bethay Director, Nuclear Assessment MJG/dm

Attachment:

January 2004 Monthly Operating Report (1 page) cc:

Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 204012

.I

-D'&,04'

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

I '

.1 I

3 'I.

f

'!:s OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-293 Pilgrim 1 February 13,2004 Mary J. Gatslick.,

(508) 830-8373 January 2004 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 711.00 684.70 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 512,969.84 Yr-to-Date 744.00 744.00 0.00 512,969.84 Cumulative 190,898.90 188,688.95 0.00 11 2,165,648.2 UNIT SHUTDOWNS Type F: Forced Duration No.

Date S: Scheduled (Hours)

Method of Shutting Down 2 Cause & Corrective Action Comments

SUMMARY

This period began and ended with the unit on line, operating at 100% power (2028 MWt). There were no power reductions during this reporting period. Note the Design Electrical Rating of the unit has been changed from the previous value reported (711 to 690) to reflect new Information.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1