ML041340271

From kanterella
Jump to navigation Jump to search
April 2004 Monthly Operating Report for Pilgrim
ML041340271
Person / Time
Site: Pilgrim
Issue date: 05/05/2004
From: Ford B
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.04.041
Download: ML041340271 (2)


Text

Entergy Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 May 5, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 April 2004 Monthly Operating Report LETTER NUMBER: 2.04.041

Dear Sir or Madam:

In accordance with Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your informationr and planning.

There are no commitments contained in this letter.

Should you have questions or comments concerning this report; please contact me at (508) 830-8403.

Sincerely, Bryan Ford Manager, Licensing MJG/dm

Attachment:

April 2004 Monthly Operating Report (1 page) cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 204041 zi-i

OPERATING DATA REPORT DOCKET NO. 50-293 UNIT NAME Pilgrim 1 DATE May 04, 2004 COMPLETED BY Mary J. Gatslick TELEPHONE (508) 830-8373 REPORTING PERIC April 2004

1. Design Electrical Rating 690.00
2. Maximum Dependable Capacity (MWe-Net) 684.70 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 719.00 2,857.58 193,012.48
4. Number of Hours Generator On-line 719.00 2,840.92 190,785.87
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 494,513.69 1,942,875.61 113,595,554.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The period began and ended with the unit on line, operating at 100% power (2028 MWt). There were no power reductions during this reporting period.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1