April 2004 Monthly Operating Report for Pilgrim
ML041340271
Person / Time
Site: Pilgrim
Issue date: 05/05/2004
From: Ford B
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.04.041
Download: ML041340271 (2)


Text

En tergy Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 May 5, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 April 2004 Monthly Operating Report LETTER NUMBER:

2.04.041

Dear Sir or Madam:

In accordance with Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your informationr and planning.

There are no commitments contained in this letter.

Should you have questions or comments concerning this report; please contact me at (508) 830-8403.

Sincerely, Bryan Ford Manager, Licensing MJG/dm

Attachment:

April 2004 Monthly Operating Report (1 page) cc:

Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 204041 zi-i

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-293 Pilgrim 1 May 04, 2004 Mary J. Gatslick (508) 830-8373 April 2004 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 690.00 684.70 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 719.00 719.00 0.00 494,513.69 Yr-to-Date 2,857.58 2,840.92 0.00 1,942,875.61 Cumulative 193,012.48 190,785.87 0.00 113,595,554.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

The period began and ended with the unit on line, operating at 100% power (2028 MWt). There were no power reductions during this reporting period.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)