_ Entergy Entergy Nuclear Operations, Inc.
Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 November 8, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 October Operating Data Report LETTER NUMBER:
2.04.109
Dear Sir or Madam:
In accordance with Technical Specification 5.6.4, the attached operating data report for Pilgrim Nuclear Power Station is provided for your information and planning.
There are no commitments contained in this letter.
Should you have questions or comments concerning this report, please contact me at (508) 830-8403.
Sincerely, Bryan Ford Manager, Licensing MJG/dm
Attachment:
October Operating Data Report (1 page) cc:
Mr. Samuel J. Collins Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 204109 9X~
I I OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-293 Pilgrim 1 November 02, 2004 Mary J. Gatshck -.
(508) 830-8373 October 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 690.00 684.70 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 745.00 745.00 0.00 507,424.96 Yr-to-Date 7,274.58 7,257.92 0.00 4,939,914.71 Cumulative 197,429.48 195,202.87 0.00 116,592,593.1 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- The period began and ended with the unit on line, operating at 100% power (2028 MWt). There were no power reductions during this reporting period.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of 1