February 2002 Monthly Operating Report for Pilgrim Nuclear Power Station
ML020850592
Person / Time
Site: Pilgrim
Issue date: 03/14/2002
From: Riggs W
Entergy Nuclear Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.02.020
Download: ML020850592 (3)


Text

-- *--- E*Entergy Nuclear Generation Co.

En In600 Pilgrim Station Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment March 14, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Generation Company Pilgrim Nuclear Power Station Docket No. 50-293 FEBRUARY 2002 Monthly Operating Report LETTER NUMBER: 2.02.020

Dear Sir or Madam:

operational status In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the information and summary for Pilgrim Nuclear Power Station is provided in the attachment for your Jeff Rogers planning. Should you have questions or comments concerning this report, please contact at (508) 830-8110.

Sincerely, JLR/jbb

Attachment:

FEBRUARY 2002 Monthly Operating Report cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 202020 i L

Attachment OPERATING DATA REPORT DOCKET NO. 50-293 UNIT NAME: Pilgrim DATE: 3-15-2002 COMPLETED BY: J. L. Rogers TELEPHONE: (508) 830-8110 Design Electrical Rating (MWe-Net): 655 Maximum Dependable Capacity (MWe-Net): 653 REPORTING PERIOD: FEBRUARY 2002 (Month/Year)

YEAR TO DATE CUMULATIVE MONTH 672.0 1,416.0 256,176.0

[1] Hours in Reporting Period 672.0 1,416.0 175,891.8

[2] Number of Hours the Reactor was Critical 672.0 1,416.0 170,671.8

[31 Number of Hours the Generator was On Line 0.0 0.0 0.0

[4] Unit Reserve Shutdown Hours 452,918.5 950,703.2 101,857,130.2

[5] Net Electrical Energy (MWH) 202020

DOCKET NO. 50-293 NAME: Pilgrim COMPLETED BY: J.L. Rogers TELEPHONE: (508) 830-8110 REPORT MONTH: FEBRUARY 2002 OPERATIONAL

SUMMARY

The plant entered the reporting period at approximately 100 percent core thermal power (CTP) where it was maintained through the end of the reporting period.

UNIT SHUTDOWNS 1 2 3 F - Forced A- Equip Failure 1 - Manual S - Scheduled B - Main or Test 2 - Manual Scram C - Refueling 3 - Auto Scram D - Regulatory Restriction 4 - Continuation E - Operator Training & 5 - Other License Examination F- Admin G - Operation Error H - Other 202020