ML050280253
| ML050280253 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 01/10/2005 |
| From: | Ford B Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2.05.001 | |
| Download: ML050280253 (2) | |
Text
72.1 Entergy Nuclear Operations, Inc.
E nteryv Pilgrim Station 0/
600 Rocky Hill Road Palyouth, MA 02360 January 10, 2005 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293.
License No.: DPR-35 December Operating Data Report LETTER NUMBER:
2.05.001
Dear Sir or Madam:
In accordance with Technical Specification 5.6.4, the attached operating data report for Pilgrim Nuclear Power Station is provided for your Information and planning.
There are no commitments contained in this letter.
Should you have questions or comments concerning this report, please contact me at (508) 830-8403.
Sincerely, Bryan Ford Manager, Ucensing MJG/dm
Attachment:
December Operating Data Report (1 page) cc:
Samuel J. Collins Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 205001 E
-;o OPERATING DATA REPORT DOCKET NO.
50-293 UNIT NAME Pilgrim I DATE January 04, 2005 COMPLETED BY Mary J. Gatslick TELEPHONE (508) 830.8373 REPORTING PERIOD:
December2004
- 1. Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Ne) 690.00 684.70
- 3. Number of Hours the Reactorwas Critical
- 4. Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
.6... Net Electrical Energy Generated (MWHrs)
This Month yr-to-Date Cumulative 744.00 8.738.58 198 893 48 744.00 8,721.92 196,666.87 0.00 0.00 0.00
-"511,570.49 -- 5.939.283.60 117,591,962.0 UNIT SHUTDOWNS Type Method of No D
F: Forced Duration Shutting Cause & Corrective Action Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- The period began and ended with the unit on line, operating at 100% power (2028 MWt). There were no power reductions during this reporling period.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & LIcense Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual TrIplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1