ML021720425

From kanterella
Jump to navigation Jump to search
May 2002 Monthly Operating Report for Pilgrim
ML021720425
Person / Time
Site: Pilgrim
Issue date: 06/13/2002
From: Riggs W
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.02.055
Download: ML021720425 (3)


Text

En tergy Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessmnent June 13, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 MAY 2002 Monthly Operating Report LETTER NUMBER:

2.02.055

Dear Sir or Madam:

In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have questions or comments concerning this report, please contact Jeff Rogers at (508) 830-8110.

Sincerely,

.J.g JLR/dd

Attachment:

MAY 2002 Monthly Operating Report cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 202055

ý ý6') 4

Attachment OPERATING DATA REPORT DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-293 Pilgrim June 13, 2002 J. L. RoQers (508) 830-8110 Design Electrical Rating (MWe-Net):

655 Maximum Dependable Capacity (MWe-Net): 653 REPORTING PERIOD:

[1]

[2]

[3]

[4]

[5]

MAY 2002 (Month/Year)

Hours in Reporting Period Number of Hours the Reactor was Critical Number of Hours the Generator was On Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)

MONTH 744.0 744.0 744.0 0.0 493,183.5 YEAR TO DATE CUMULATIVE 3,623.0 258,383.0 3,623.0 178,098.8 3,623.0 172,878.8 0.0 0.0 2,418,546.6 103,324,973.6 202055

DOCKET NO.

NAME:

COMPLETED BY:

TELEPHONE:

REPORT MONTH:

50-293 Pilgrim J.L. Rogers (508) 830-8110 MAY 2002 OPERATIONAL

SUMMARY

The plant entered the reporting period at approximately 100 percent Core Thermal Power (CTP) where it was maintained until May 29. At 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />, a power reduction was commenced to approximately 57 percent CTP to perform a thermal backwash of the main condenser. The reactor was restored to 100 percent CTP at 1225 hours0.0142 days <br />0.34 hours <br />0.00203 weeks <br />4.661125e-4 months <br /> on May 30 where it was essentially maintained through the end of the reporting period.

UNIT SHUTDOWNS METHOD OF CAUSE/CORRECTIVE ACTION/COMMENTS NO.

DATE TYPE DURATION REASON SHUTTING 1

(HOURS) 2 DOWN REACTOR 3

1 2

3 F - Forced S - Scheduled A - Equip Failure B - Main or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Admin G - Operation Error H - Other 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continuation 5 - Other 202055