ML030520292
| ML030520292 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/11/2003 |
| From: | Riggs W Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2.03.014 | |
| Download: ML030520292 (3) | |
Text
SEntergy Entergy Nuclear Operations, Inc.
Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment February 11, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 January 2003 Monthly Operating Report LETTER NUMBER:
2.03.014
Dear Sir or Madam:
In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have questions or comments concerning this report, please contact Jim Haley at (508) 830-8143.
Sincerely, g
JRH/dd
Attachment:
January 2003 Monthly Operating Report (2 pages) cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 203014
Attachment OPERATING DATA REPORT DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-293 Pilgrim February 11. 2003 J. R. Haley (508) 830-8143 Design Electrical Rating (MWe-Net):
655 Maximum Dependable Capacity (MWe-Net): 653 REPORTING PERIOD:
[1]
[2]
[3]
[4]
[5]
January 2003 (Month/Year)
Hours in Reporting Period Number of Hours the Reactor was Critical Number of Hours the Generator was On Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)
MONTH 744.0 744.0 744.0 0.0 496,085.5 YEAR TO DATE 744.0 744.0 744.0 0.0 496,085.5 CUMULATIVE 264,264.0 183,979.8 178,759.8 0.0 107,171,581.8 203014
DOCKET NO.
NAME:
COMPLETED BY:
TELEPHONE:
REPORT MONTH:
4.
50-293 Pilgrim J.R. Haley (508) 830-8143 January 2003 OPERATIONAL
SUMMARY
The plant entered the reporting period at approximately 100 percent Core Thermal Power (CTP). At 10:34 hours on January 7, Pilgrim initiated a planned down-power to 45% CTP to perform a condenser backwash. The reactor was returned to 100% CTP at 00:13 hours on January 8, where it was maintained until 10:27 hours on January 29 when a planned downpower to 94% was initiated for a rod pattern adjustment. The reactor was returned to 100% CTP at 14:15 hours where it was maintained for the remainder of the reporting period.
UNIT SHUTDOWNS METHOD OF CAUSE/CORRECTIVE ACTION/COMMENTS NO.
DATE TYPE DURATION REASON SHUTTING 1
(HOURS) 2 DOWN REACTOR 3
1 2
3 A - Equip Failure B - Main or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F-Admin G - Operation Error H - Other 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continuation 5 - Other F - Forced S - Scheduled 203014